Loading...
HomeMy WebLinkAbout72154_Bulkhead_20180613-` ❑CAMA /❑','DREDGE & FILL " aWvl� N2 /2154 A C C D GENERAL PERMIT Previous permit # N ,� .❑New ❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issued . ,t 1 IA ' As authorized by the State of North,Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Wules'attached. ' Applicant Name AID 1-1 Address - 9 9 of o W W 16 HA /M "A10 City G�-l�q� StateaA ZIP Phone # (-V-9) 220 4-.41 4L E-Mail Authorized Agent Affected El N EW QPTA ❑k ES q PTS 1, ❑ AEC(s): OEA " ElHHF ElIH ❑ UBA ElN/A s ❑ PWS: ORW: yes no PNA yes no Project Location: County Street Address/ State Road/ Lot #(s) Subdivision City4/-J-7J ZIP Phone # ( ) River Basin T-PAWZ,I <c7 Adj. Wtr. Body PW-lt,i lc:) di5-eL- (na /man /unkn) Closest Maj. Wtr. Body length' e■ •ate■. ■■■ ■.■■j■ ■■■ ■■ ■■■■■■■■ ■■■■■■�■■■�ili■■■■■ill■■(■■■t� ■■■■■■■■■■■■■■■ Cc-v ®- G e S (,/�i /T d// Agent or Applicant Printed Name Signature 1177 Please read comoiance sta ement on back of permit S !_ til K- u ©y 9'�i 0 Application Fee(s) Check # • �CLZL� 1J Pt trL Permif�0'fcer's Printed Name Signature V) OG��i Cyr 2� l Issuing Date Expiration Date " From: Thad Pettyjohn tpettyjohnl2@gmail.com Subject: Fwd: Bulkhead Second sending- Now George wants form ASAP as he may start on ours very soon Date: May 14, 2018 at 5:39 PM To: steve@orrimages.com Can you download and print for me to give George Linton. Thanks Sent from my Pad Begin forwarded message: From: rickie killinger <wrkillinger@gmail.com> Date: May 14, 2018 at 5:28:50 PM EDT To: Thad Pettyjohn -4pgVohn129gmail.com> Subject: Re: Bulkhead Second sending- Now George wants form ASAP as he may start on ours very soon You have my permission to proceed. Sent from my Phone On May 14, 2018, at 4:53 PM, Thad Pettyjohn <tpet i ohn12@gmail.com> wrote: Sorry to bother you again but Georgel-inton said I must have an email from you to me before he can start on bulkhead in approximately 3 weeks. Sent from my Wad /"qc /6, 1 :�� r you- A D A,U*Orized Agent Consent Agreement to act on q,y0mm) (Anthoad�odAg�at) my be &m' obtaining CAMA pemdts fw the location Head below. Pol" A : �•� mow: ' Property owner's Maw Address: Yol a eld Lt%�i` ��Yt /C u s ist-svG : d�'i7 �- ROY COOPER - Governor MICHAEL S. REGAN Secretary Coastal Management BRAXTON DAVIS ENVIRONMENTAL QUALITY Director BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar -Pamlico River basins per Division of Water Resources (DWR) regulations 15A NCAC 02B. 0233 and 0259. The Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned . regulations. Those activities. covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the parry (contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation. i. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either normal water line (NWL) or normal high water line (NHWL) and extends 30 feet landward) shall be minimized to . what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading: Clearing and grading of Zone.2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. e 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. s. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected -with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. 6. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30) after completion of the bulkhead. • Pre -project site conditions: 7. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction corridors. This drawing will be.used to aid in compliance and monitoring efforts. By your signature belowyou agree to be held responsible for meeting all of the above listed c nditions and verify that all information is complete and accurate. t cog 1-6 Agent or Applicant Print d Name Permit is Si"e Agent or A p icant Signature 4s ue Date CAMA GENERAL PERMIT #:-7 2! 5— u State of Norfi Caro[Ina I Environmental Qualtty I Coastal Management Washington Office 1943 Washington Square Mall Washington, NC 278891252-946-6481 Wilmington Office 1 127 Cardinal Drive Ext. Wilmington, NC 28405-38451 910-796-7215 Morehead City Office 1400 Commerce Avenue Morehead City, NC 28557 1 252-808-2808 Applicant: Date: /3 ':��" 2� 1 9' General Permit#: -7Z t S V Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. TOTAL Sq. Ft FINAL Sq. Ft. TOTAL Feet FINAL Feet (Applied for. (Anticipated final (Applied for. (Anticipated final DISTURB TYPE Disturbance total disturbance. Disturbance disturbance. Habitat Name Choose One includes any Excludes any . total includes Excludes any anticipated restoration any anticipated restoration and/or restoration or and/or temp restoration or temp impact ternimpacts) impact amount) temp impacts) amount) Dredge ❑ Fill ❑ Both ❑ Other ❑ g7 �3a TTdr,n Dredge ❑ Fill Both ❑ Other ❑ 4 2- 1-1,57 Dredge ❑ Fill ❑ Both ❑ Other Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑! Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑