Loading...
HomeMy WebLinkAbout72174_remove and construct new boatlift_20180626CAMA / ❑-DREDGE &FILL G155 ENERAL PERMIT New ❑Modification ❑Complete Reissue, El Partial Reissue As auth6nzed,by the State.of North Carolina, Department of Environmental Quality and the Coastal Resources Commission -in an area of environmental, concern pursuant to 15A NCAi N 72174, CB C D Previous permit'#- D`a�t`e previous permit' issued • Applicant Name r�� C %��/ i'?L Project Location: County_ Arbil PSG / f / l /7`Gf/ ! /_` Street Address/ State Road/ Ci-St'ate�e Zip ' Phone,#4( "1." -E-Mail.' Authorized Agent ❑CW`EW -TA ❑ES ❑PTS ' Affected, ❑_OEA - ❑ HHF ❑ IH ❑ USA ❑ N/A AEC(s); , ❑ PWS: ORW:• yes / no PNA yes / fi�o ,;/ Type of Project/ Activity Pier (dock) le gth Fixed Platform(s) - '^ Floating Platform(s) Finger piers) .Groin length ' �— hum ber Bulkhead/ Rip'rap length" avg distance offshore -�-- c'` max distance offshore 'Basin, channel cubic yards ' _Boat ramp �/ r Boathouse/-Boatlift[ - - . Beach Bulldozing Other .. A 1; r ' Shoreline Length��� f SAM, not sure yes no Moratorium: n/a , yes Photos: ~' yes 5h; Waiver Attached: yes no #(s) c_ !/ije-er�-�c.z,,K� i !, Subdivision City Phone # ( ) � - River Basin ; /Adv Adj. Wtr. Body % f© %G?t / nat ,man /unkn Closest Maj. Wtr. Body n CIA !IiU"7k l l . (Scale: /! ) ■■■■■■■■■■■■■■■■■■■i:i■■I��J■■_■�®■■■Y ■■■■■■■■■■■■■■■■■■■■�1�1■1!!■I■■■��■■ilul■■■■■■■■ ■■■■■■■■■■■■■■■■■®■■�ltl■■■■■■1l�d■■■■■■■■■■ Me■EMMEi■■■■■ ■C■e 6Lee■al>1C .E MEM■■■■Ne■■:: ■■■ ■■■■■■■■■er�ee■■■e■.i�ns�■■■■■e®■ew®■■■ ■■■■■■■■■■■■■eee�er�■ra■r ■�l�i.,4e�■■■■eeeee■� ■■■©■n■■■■■■■■■■■■■■ e■■�j■;■�+e■■e■■■■■am ■■r ■r�e� ■■■■■■■■■■fie■■ I ■I,90-72,10 ■■■■■■ ■■■■r�►time■■■■■■■■■i�©e■■■■■�a■■■�_e►�ee a ■■■■■■■■■■■■■■■■■■■■■■■■�■■■■ ■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■�■r■■■■■■��■■■■■■ ■■■!�■Ill■■■■■■■l?�Y�■■■■■■■■■�ie�■■■ .�!■�'�■■■■■ ■i/i�/1i�llfYY■■■r ■■■■��I,r��■ il.■{�..��,,.���e--909_. a'1!■■ ■�■l�%■■■■■■■■■■■■■■■�1�1�j►,��Ililliii �r■i.■.�.li■Ir .� ■■■■■■■■■■■■■■■■■■3©L.%■■■■■■ ■■■■■■e■■■ MMEM■ Ron ■■■■ MUMee■■■■M■■■■■■■■■■iiee■■e■■■�■■ E■■■■■■■■■■■■■■■, A building permit may be required by: �/ / / `l� See note on back regarding River Basin rules. • (Note•Local Planning Jurisdiction) Notes/ Special Conditions Agent or -A plicant Printed Na ` Permitoffi 'er's'P'intedN*a-r e Sign ture - ** Please read coin Hance statement on back of permit Signature Application Fee(s) Check# Issuing Date Expiration Date in ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to (Name of Property Owner) property located at (Address, Lot, Block, Road, etc.) on , in (Waterbody) (City/Town and/or County) 's N.C. The applicant has described to me, as shown below, the development proposed at the above location. I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must fill in description below or attach a site drawing) WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Property Owner Information) (Adjacent Property Owner Information) Signature Sign e* nl-4Ve �,e Ale Sa K Print or Type Name Pri or T pe Name l Mailing Address Mailin ddre s '79 In City/State/Zip City/State i Telephone Number/email address Telephone N mber/e ail address Date Date (Revised Aug. 2014) -,*Valid for one calendar year after signature* ADJACENT RIPARIAN PROPERTY OWNER STATEMENT' I hereby certify that I own property adjacent to (Name of Property Owner) property located at I (Address, Lot, Block, Road, etc.) on , in , N.C. (Waterbody) (City/Town and/or County) The applicant has described to me, as shown below, the development proposed at the above location. I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR -DRAWING OF PROPOSED -DEVELOPMENT (Individual proposing development must fill in description below or attach a site -drawing), WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Property Owner Information) Signature Print or Type Name Mailing Address City/State/Zip Telephone Number/email address Date (Adjacent e* a oe Name Owner Information) ailing Addrpss City/ ate/Zip 4f Telephone Number/email address 42— 16 f&' Date* (Revised Aug. 2014) *Valid for one calendar year after signature* IFSL L"I-- q Coastal Management ENVIRONMENTAL QUALITY BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON DAVIS Director A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation. i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and mon�oring efforts. • Pre -project site conditions: By your signature below you agree to be held responsible for meeting all of the co that all information provided is complete and accurate. or Applicant Prjnt> d Name Permit Officer's icantl aKature — Issue Date 9 CAMA GENERAL PERMIT #: 7Q) / ✓� State of North:Carolina I Environmental Quality I Coastal Management Washington Office ( 943 Washington Square Mail Washington, NC27889 f 252-946-6481 Wilmington Office 1127 Cardinal Drive Ext. Wilmington, NC 28405-3W_I 910-796-7215 Morehead City Office 1400 Commerce Avenue Morehead City, NC 28557 1 2S2-80872808 ature and verify NC Division of Coastal Mgt. Habitat Impact Computer Sheet Applicant: -/X0M* ' Date: .;,)6 5lli2e-- a-e:;l00 General Permit #: ;2,;,w?3 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount Dredge ❑ Fill ❑ Both ❑ OtherA q Dredge ❑ Fill ❑ Both ❑ OtherA Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised:02/03/10