HomeMy WebLinkAbout72162_Boatlift and Kyak Launch_20180611I
;AMN/. U,DREDGE & FILL N2, 724 62,
`ww -.1, -J.".
A C D�
GENERERAL -PERMIT..*
AL Previous permit #
w -ElModitication' ElComplete Reissue ElPartial Reissue Date previous permit issued t-4 )A -
As authorized by the State of, North Carolina, Department of Environmental Quality
"kesoLirces Commission in an area of environmental concern pursuant to 15A NCAC "D-1� and the Coastal
>1 Rules attached.
Applicant Name P-z i r VA L. Project Location: County -EeA
Address 4- -1 _r•-4 Street AddreSs%LState Road/ Lot #(s)
City I,,, I �L State c-_21P Q L
Phone # 4,) E-Mail, Subdivision L
Authorized Agent City A zip
Affected El CW EIEW MtUA, bES- El PTS Phone # River Basin--7/ra- PAwi L-i
AEC(s): 0 OEA ❑ HHF 0 1H El UBA D N/A
Adj. Wtr. Body62_e72�- �(nat /man /unkn)
El PWS:
Closest Maj. Wtr. Body U J=�
0111W. yes ( no lPNA (�B/ no
■■■�■■■■■■■■®■■■■C■■■�■■■■■1■C
EMNON
M
M.-M.
MEN
EMENUUM119=0 MEN
Agent or Ap 71* 7t.rrinted Name
LA
Signature "Please read compliance stat ment on back of permit
Application�,Fee',, Check#
P, 7 e_I_E-� . . . I .
)Lc- 'S F 1 ve
Pe itOffZer s Printed Name
Signat6re'
Issui`ng Date Expiration Date-
f it Ifid A!, 150
Y-7 19-
71
1V rl; I"
=ar"
4 ju-
mMr�
rut
00,
'ApMi-fd-eMy
W "9
0*W
e.
0- la
14 PAV6
Rl
A4
l?
01
-,
X t4i'd AM- 101
dlc4i i de`QWdiff 114 i Ci,)3,
IT
aa larm Myo --,I,
P10-
Mill
hI
, M�-`d- j
-"WAA-A
V 3 d?V, MOM 0.4
PWR44,60. ZZ, rRZ'Oh IRROZ-A 0,19-0.
'MCEIPTRj&U.WTE R
IVIV 181 OF
�WRIFO M,
k",
04-
6L
17
------------
jo !pPpip
-drm e,,
q
of
M Now I.W. Lw Im"'IMMIM
wow
p GdV
se ir
41
67-
R # dfly 0' b'*-' "u"
'SA
A fW tO
wow
myawcm- i� Fwatv. %
-P
-tta M two 17-7
W"
W"YM M
" vk � W--_t
g�
es
A W 41# WC10- ryfi W*
A-4-4.
If., W-.LIIMW4
ji E, 1� a a- JI 91"N -IMMIF M
42 i
. . . . . . . . . . . . . . . .
AN- -
is
SV'
12
*�70 ;'V-.-,�
kill"
NO MM
PIRW6� h
� 'WR Mik
th-l-TWw"berowo'll"', if
tz
CaastaflC�langexrlent
EWF2`0NftkAL GU{{LFTa'
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND'DOCKING FACILITIES ACCESS WAY
ROY- COOPER
Govaulor
MICHAEL S. REGAN
seams
BRAXTON DAVIS
iiirecmr
A riparian buffer authorization.is required for pier and docking facilities -access ways through,the Tar -Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 0213.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has Ireviewed your project proposal -and has determined that the project;as proposed complies
with -the aforementioned regulations.
Those activities covered.by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the_project is constructed in a manner that continues to meet all.ofthe conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land:clearing to a civil penalty by DWR of up to $25,00-0 per clay per violation.
1. Crossing is;Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian -buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment'shall minimize the removal of woodyvegetation to the greatest extent practicable-:
z. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
• Pre -project site conditions:1
By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify
that all information provided is complete and accurate.
Agent or Applicant Printed Name Per it cesgn ure
Agent or Applicant Signature Issue Date
CAMA GENERAL PERMIT #:
State ofNortFrCarolma I Environmental Quality f coastalManagement
Washington Office 1943 Washington Square Mail Washington NC27889 f 252-946-648I
Wilmington Office 1 121 Cardinal Drive Ext. Wilmington, NC 28405-384S 1 910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City, NC 28557 1 252-808 2808
Applicant: L V ALE �� A
Date: Ij - Z-014
General Permit* --7 21
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat game
DISTURB TYPE
Choose One
TOTAL Sq. Ft
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
tem im ads
FINAL Feet -
(Anticipated final
disturbance. .
Excludes any
restoration and/or
temp impact
amount
Dredge ❑ Fill ❑ Both ❑ Other E1
5'n'3 f Y2
d3 f� 2
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑