HomeMy WebLinkAbout72166_Floating pwc/ platform dock_20180611JV.
0 iiIE00EA FiLL'.'
Jkc. ff`D' A
GENERAL PERMIT Tnm"Ousit # 7/, El Partial Reiss�6e Date *revio'us, permit issued
'New. Reissue' p
As authoHzed by -the State of Nqab'Caeblina,: Departmbnt of Environmental Quality
. -Z
/and the Coastal Reso6'rces�66'mmis'-sion"in''an n.area.of�enviroi mental concern pursuant to 15A NCAC -0-)
Rules attached.
Applicant ,Name E-J:�IWIAJI:O �14 I L L Project Location.Co ,
0-6� d L, A 0 IV Q 114;4
Address Street Address/.Stat6Road/ Lot #(s)' Elf Sz- i -X.(,
7- Ci Sfat6-*,Q 4- ZIP 3 1 -7
Thone # )34) --E-Mai V Subdivision
-Authorized Aient e- 6 ZIO,
City
0 Cw XTA 0 ES El PTS Phone# River Basin- Adz PAM L-1 t
Affected,
AEC(s): 0 OEA 0 HHFI, OlH -OMBA 0 N/A -;�/unkn)
Adj. Wtr. Body Orn (nat a
0 PWS.
Closest Mai. Wtr.'Body WN
'yes /C-nq�) PNA yes �/,n o
T V ty ype of Project/ Acti, i
(�cahij
Pier (do,ck).length
Fixed Platform(
ing Platfo�m(s)l I NE,
rpJe1r(s):,
in 1'en 'hll 'MMMA,
9t
MEE 0 ME
MEME -MEE
MEE N."OffifflMEME
,,head/ Uprap-l-ength
avg�distance offshore
distance'offshori;
n,-channel
cubic.yards
ram
house/,�oatlift
:-.ch,Bulldozihg
reline LenLgth /—Z �
yqs
1���'yes
torium:
Cn
�m■�.��■■■ii■■■i�eii■■iei■oii�■i■�e■iia��o■i
Agent-6r Applicant Printed Name
Signature; - Pl6ase read compliance ,statement on,back of permit"
I >
Application Fee(s) . Check #
Issuing Date Expiration Date
•
WMI' �
WII
th
W ktq� d -A _;A- dmm
I k
Ask,
w-a-a-vix., mvylb-eb,-W--
r-71
AO'Ek A
1%
110
A Ir ,
WON NO
rz
Aq
AlA0 E, , U -, 0
W.6-Ak vw�
wo
000
POW
nn;w .00
-AT
Pia'T��'A
7TOTPI76ne Mumbe
N
5
�z
4
jjp�Qn0-0 A^ Vt Asa,
fiAV-O-OD-J-A C a
pz?
49"
43 -T
wlift-I SW mit '01�s lb -M O
fb
"I'MUar" Pee
07A
A
e7 ag, &- 44
gaft."j, Aum m
wo
keoA 6,t4,
I
Pgj!N
Ll
-
s uAle Kneads
- 1 � ' herajetEr' �a age
PNI
. , a t^, t,�:,i�"='f. � y ;,�.. � � rye m- �av z, a r °�'"`��a • ,c? „�.r .. ..
,, T� " - } . �• ��` � , x tip` .
AnCOQse LaUding Road ,r
. � r * �•{ -,,,.fir' �.`_`� _' _ti . , X _`c.,1 *��'K�,' �` � i -
•
,
a
•yam , . _ ,
+
CoastalMa Geer mt
EDLi AONMEt�tTAL 9LTiGL"
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
ROY COOPER
Governor
MICHA€L S. REGAN
serretury
BRAXTON DAVIS
Di2ct01.'
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02,B.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR)-has'reviewed your.project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project. is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor). performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment"shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open=slatted wood or composite, mulch, or grass to meet -the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
• . Pre -project site conditions:
n
By your signature below you agree to be held responsible for meeting all of the conditions listed' above and verify
that all information provided is complete and accurate.
Agent or Applicant Printed Name Per' i fficer's Si t re
Agent or Applicant Signature Issue Date
CAMA GENERAL PERMIT #: 1214,4w3
State of North. Carolina I Environmental Quality fCoastalManagement
Washington Office 1943 Washington Square Mall Washington. NC27889 f 252-946-6481
Wilmington Office 1 127 Cardinal Drive Ext Wilmington„KC 28405-38451 910-796-7215
Morehead City Office 1400-Commerce Avenue Morehead City, NC 28557 1 252-808-2808
Applicant: EARL. 13Ri2h1V�,IL L
Date: 11 -3'1 -P `2�O 1-1
-General Permit AF .1,Z I G-t
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet
Habitat blame
DISTURB TYPE
Choose One
TOTAL Sq. Ft
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts)
'FINAL Feet ,
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount)
O?� N
W k�
Dredge ❑ Fill ❑ Both ❑ Other-B
.Z .� a.2
l.L` ,� + 2
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑