HomeMy WebLinkAbout72191_Bob Thompson_20180719.. -` ..., �. -- TMPr=.rrs•4�•—;"aY.t"Pt1W..Y�',�'.'"Y'6K'V; e;:� ,e+,:. ... '-°Y!�:j'-C:'-.�
�,kCAMA /.❑ DREDGE & FILL •
GENERAL ---,PERMIT
' i0bew ❑Modification - ' ❑Complete Reissue . El Partial Reissue
As'authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern "pursuant to 15A NCAC
" -,, Address" S J
`7 CiState �L ZIP-w
ty ��i_ Gs/%/
•Phone # �� — E-Mail
Authorized Agent /Y',r" 4e mne
Affected ❑ CW Elj/P EW TA . ❑ ES ElPTS
" AEC(s): " El OEA ❑-HHF ❑ IH ❑ UBA ❑ N/A
❑ PWS:
ORWo�
Type 11 of Project/ Activity, /1_1
Pier
Fixe
Float
Fing
Groff
I Bulk
Basil
I . Boat
Boat
Beac
•Othi
Shor
SAV'
Mo
Ph
N 72191 C D
Previous permit #/f '
Date previous permit issued
Pro'ect Location:, County
J
Street Address/ State Road/ L
Subdivision
City /Y �lr ZIP
Phone # ( ) River Basin
Adj. Wtr. Body Ul.-_!c CCCY nat man unkn
Closest Maj. Wtr. Body 42- ram
(Scale:
■■■■■■■■■■■■■■■■■■■■■■■�■■■■■■■■■■■■■■■■
ng Platform(s)
■■■■■■■■■■■■■■■■■■■■�rlr.�■■�■■a�.■■■■■■■■
r pier(s)
length
■■■■■■■■■■■■■■■�i��i�����■���■■■■
■■■■■
■■■■■
■■■■■
■■■��■■�■
■■■■■■■M■■■■■■
number
■■■■■■■■■■■■■■■■■■fA■■■■■■■■■■ram■t!�■■■■■■
■■■■®■■■■■■■■r�rc�ri■■■■■■■■■■■■■ra■■■■■■■■■■
avg'diftance offshore'
max distance offshore
■■■■■■■■■■■ia�i�iii■■�■■■■■■■■e■■■■■■
■■■■■■■■■■.T»■■■ni■■sE■■■■■■■■R■■■■■■■■■■
cu.bic yards
■■■■■■■■■■■■■■i■■■■■■■�■■■■■■■�r■■■■■■■■■■
■■■■■■■■■■■■■tit
1■■■[�■■■■■■■■I`,■■■■■■■■■
■■■ir
If/���■
■■■■i■i
■�■■■:�■■■■
■■■■■■■■■■■■■■■
■■■■■��■ca■■■f■i�■■■■■■■■■■■■■■■■■■■■■■■
line Length -L-1zey?
not sure �►
■■■�f■■■ll■■il■■■�ia�i�i�L�■■L������1��..�ll��.
■r�r�■■fl■■■■■■■■e■■■■■■■■■■■■�.■■■■■■■rr�
yes
•
■.���■■.1■■■■ll��■■■■■■■�I�f%■■■■■■■�iitIl�■
•
�
�C�
71
y1■■■■■dillld■■�
�/■■■►:
RIAM■■"J.■■■■FAM
■■■
A building permit may be required by: %��/�;///f� i'% / T_7 WSee
( Note Local Planning Jurisdiction)
Notes/ SpeciaJ Conditions
Agene?r Applicant Printed Name V
.Signature . Please read compliance statement on back of permit
�plication Fee(s) Check # -
,r
B on back regarding/River Basin rules.
PermitOfficee's Printed Name
Signature '
Issuing Date Expiration Date
J
Coastal /Gfangemerct
tutd a§&r McWAL dUAUTY
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
ROY COOPER
Governor
MICHAEL S. REGAN
secrerdry
BRAXTON DAVIS
Director
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. -Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor), performing the,
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall betaken to ensure the access way is made of pervious
materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
• Pre -project site conditions:
By your signature below you agree to be held responsible for meeting all of the conditi"Ii above an v rify
that all i orm`at' n provided is complete and accurate.
Agent or Applica rioted Name Permit Office s Signature
Agent or
re
CAMA GENERAL PERMIT #:
Issue Date
State of North Carolina I Environmental Quality j Coastal Management
Washington Office 1943 Washington Square MaR Washington. NC27889 f 252-946-6481
Wilmington office 1 127 Cardinal Drive Ext. Wilmington, NC 2mo5-388 1910-796-7lis
Morehead City Office 1400 Commerce Avenue Morehead City, NC 28557 1 252-808-2808
I, Jerol Selby Jr. give permission for Bobby Thompson to construct a pier adjacent to my property.
7/16/2018 Print Window
Subject: Pier Construction
From: rpaulcp3339@gmail.com
To: jerolselby@yahoo.com
Date: Monday, July 16, 2018, 5:05:01 PM EDT
I, Nancy N. Paul give permission for Bobby Thompson to construct a pier adjacent to my property.
Sent from my !Phone
1/1
Trowell, Steve
From: The Selby Co <theselbyco@gotricounty.com>
Sent: Thursday, July 19, 2018 2:23 PM
To: Trowell, Steve
Subject: [External] Bobby Thompson Pier
The Selby's have no objections to Bobby Thompson's Pier.
Jerol Selby
NC Division of Coastal Mgt. habitat impact Computer Sheet
Applicant:
Date:
General Permit #:
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts)
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount
Q
Dredge ❑ Fill ❑ Both ❑ Other
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanaaement.net revised: 02/03/10