HomeMy WebLinkAbout72144_7H.1200 Dock_2018053114
,�SCAMA /: ❑DREDGE &-FILL N�T2 '721 � �! .� 1� _ ln� 'C . D ,
GENERAL PERMIT Previous permit#�47
New, ❑Modification ❑Complete Reissue El Partial Reissue Date previous peri—ndissued ly
As authorized by the State of North Carolina, Department of Environmental Quality 11/��
and the Coastal Resources Co mission in an area of environmental concern pursuant to 15A NCAC �/
[Rule . attached. "
Applicant NameProject Location: County ! �G
Address 0?0 Ge, Street Address/ State Road/ Lot #(s) p �f�%1✓a2�
City GAG f7l'l �_ _ State& ZIP 100446;
Phone # (� ,13� E-M it Subdivisio
Authorized Agent City l/`ZIP
❑ CW- �EW ,PTA ❑ ES ❑ PTS Phone # ( ) River Basin ;
Affected 0 OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A !�
AEC(s): Adj. Wtr. Body nat.` rian� unkn '
❑ PWS:
ORW: yes / PNA yes / o Closest Maj. Wtr. Body
Type of Project/ Activi ty
• .. i;
■■■
■■MEN
■■�■■■■■■■■■■■
■
■■■■■■■
MEN
MEN
■...■...■■NOMMEA.■■■MEMEM
M■■■■■■■■O■■■■
EMEMM■■■■■■■■■■M■■
. ■■M■■MM■■■MM■MMMM
M.
■■r:Mi%■■■■■■■■■M��i
rr��w Mlq■E■M■■MM■
DER
■■ri■r■■■■■■■i�mrnnrrri■mr■r��■■■O■FA■■■
■M■■M■■■►�
now
■■ �(il■IlMO20FIE■
• Ei■
MO■■■ ■■■■■■■■■■
■■■ ■■■■■ MEN
0•..�■
�...■■....■■..��..■.■■.■■MEMO
ISI
Signature* Pease read�m fiance statement on back of permit
Fee(s) /" ' Check#
2
Q®�����IT RIEARIAN P�Cc P��3`1� ® VTR 3 A��61ia�6�l`n
I hereby certify that I own property adjacent to ,s
(Name of property Owner)
property located at
(Address, Lot, 8Iock, Load, etc.)
• in , N.C.
on (Waterbody) ptylTown andlorr County
The applicant has described to me, as shown below, the development proposed at the above
I have no objection to this proposal.
i,
I have objections to this proposal. f .
DESCRIPTION ANDI R DRAWING OF PROPOSE® DEVELOPMENT
(Bat:dividuti proposing dedeiopsent mugg rgii in descrriptlon hslow or ach a side dlraWing) f. .
@iWlAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my area of riparian access unless waived by .
me. (If you wish to waive the setback, you must InKIal the appropriate blank below.) _
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Owner Infformation) (Adjacent Props Owner Owner information)
Signature S �ture*
Print or Type Name
Mailing Address
CWState-&ip
Telephone !.Number/ email address
Dare
"Valid for one calendar year after signature°
Dare's
(Revised Aug. 2014)
I
ADJACENT RO PAROAM PROPER ®��1� Z STAT1I�ENT 1
I hereby certify that I own property adjacent to ('s '
lala®� �ae fPr@pe�s�9 ®per➢
property located at
QAddreas, Lot, [Mock, loads etc.)
on , in , Iv.ii.
�a ITovm and/or County/) .
Q@�elterbody) Q . ��
The applicant has described to me, as shown below, the development proposed -at the above
c I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION ANDi®R DRAWING OF PROPOSED DEvE O Phy ENT
padividual prroposing development must fii/ in deserripdon WOW or 898c a ske 'o7rraw/n�
KA8VER SECTION
I- understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 16 from my area of riparian access unless waived by
me. (If you wish to waive the setback, you must Initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Omer Information)
adjacent Propeny Owner Information)
Signature
a rep`
a
Print or Type Name
Prim or Type Dame
qwq 3a3.?z Hwy Z Y
Mailing Address
MaNn Address
��u.�a� r� G
04MateMp
City/state2ip 2 -7 0 0
Telephone Number/emall address
Dare
"Valid for one calendar year after signature
Telephone Number/email address
725 L- Z 0
Date* sJ111 1 9
(Revised Aug. 2014)
Coastal Management
ENVIRONMENTAL QUALITY
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
ROY COOPER
Governor.
MICHAEL S. REGAN
Secretary
BRAXTON DAVIS
Director
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 026.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the -property owner and the party, (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
i. Crossing is Perpendicular: Pier and docking facility access way must cross the50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment shall minimize the removal- of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
• Pre -project site conditions:
By your signature below you agree to be held responsible for meeting all of the � n i ed abov a verify
that all inform 'on provi ed is complete and accurate.
/e�nt or A licant ri ted N e
PIOffice is Signate
��G��
Agent or Applicant S gn re Issue Date
CAMA GENERAL PERMIT #: Z 114 _�>
State of North -Carolina I Environmental Quaitty I Coastal Management
Washington -Office 1943 Washington Square Mall Washington, NC 27889 1252-946-6481
Wilmington"Office 1 127 tardinal Drive Ext. W11mington, NC 28405-3845;1 910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead'City, NC 28557 1 252-808-2808
NC Division of Coastal Mgt. Habitat Impact Computer Sheet
Applicant:�,G /v
Date: J?r ARy2'�'(p
General Permit #: RoZ 11V-13
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts)
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount
Dredge ❑ Fill ❑ Both ❑ Other
&,V
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised:02/03/10