Loading...
HomeMy WebLinkAboutOsprey Oaks Marinati :_�CAMA / '—_ DREDGE & FILL A B C D GENERAL PERMIT Previous permit # New LIModification ❑Complete Reissue El Partial Reissue Date previous permit issued c. ,a As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ❑ Rules attached. Applicant Name Address City State _ ZIP Phone # ( ) E-Mail Authorized Agent~ ❑ CWW A Affected ,. ❑ OEA ❑ HHF IH AEC(s): ❑ PWS: nRW vPz / nn PNA ves / no Type of Project/ Activity Pier (dock) length `- • - "�' Fixed Platform(s)�—_ Floating Platfq (S,) ^� Finger piers) ' _ ` l Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel cubic yards -- " Boat ramp ` _ Beach Bulldozing Other ❑ ES ❑ PTS ❑ UBA ❑ N/A Project Location: County _ Street Address/ State Road/,Lot #(s) =t_ Subdivision CityZIP-- 1 Phone # ( ` , River Basin r j i Adj. Wtr. Body �' L� � s / � , 4 nat /man /unkn) j Closest Maj. Wtr. Body --� Shoreline Length a 1 i SAV: not sure yes no I Moratorium: n/a yes 114111 Photos: yes no�7 i Waiver Attached: yes no A building permit may be required by: ( Note Local Planning jurisdiction) Notes/ Special Conditions Agent or Applicant Printed Name Signature ** Please read compliance statement on back of permit ** Application Fee(s) Check # (Scale: I :. __?l ) ❑ See note on back regarding River Basin rules. Permit Officer's Printed Name Signature Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules ❑ Other: Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ I-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow - North of New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) http://www.nccoastaimanagement.net/ Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 9 10-395-3964 (Serves: Brunswick, New Hanover, Onslow - South of New River Inlet - and Pender Counties) Revised 08/27/ 14 9., 2/5/18 252 247 3330 To: NC DEQ, Morehead City Office Attn: Heather Styron From - David Livingston, NCDOT Newport Office Subject: Osprey Oaks Marina Attached should be the applicable executed Riparlan property owner statement. TOO# ZGT'OH v0:60 8TOZ/90/E0 DIVISION OF. COASTAL. MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONMIAIVER FORM Name of Property Owner:. Address of Property: or streettreet#Street or Road, ok & County) Agent. s Name #: Agent! s phone 1#-. -�ID ag1 C4 Mailing Address:(i 4- t hereby certify that I own property :adjacent to the above .referenced property:..The individual applying for this permit has described to me as shown. on the attached drawing the development they. are proposing. I have no objecdons to this proposal. I have objections .to this proposal. if you have objections to what is being proposed, you must nonthe Division of coastal Management (DCM) In wrltfng within 10 dap of receipt of this notice. Correspondence should bo mailed to 400 Commerce Ave., Morohoad City, NC, 28557. DCM rapr®sentatives can also be contacted at (252) BOB - objection if you rlotifte CertlfledNlail: WAIVER SECTION I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set back a minimum distance of IS' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must Initial the appropriate blank below.) do wish to waive the 15: setback requirement. -I do not wish to waive the 1 6' setback requirement. (Property Owner Informatio Signature Print or type Name Mailing Address �Jyy j r �70 Citylstaip o�y el ®phone Number r.� Owner Information) Print or Type Name / IL sili Address l' ��c �'L C,tyistat p Telephone Number Z /U Revised 6/10012 Z00tt N T*OH VO:60 8TOZ/90/E0 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to ' g (Name of Property owner) property located at (Address, lot, Block, R d, ) on ; in.c?lr.n.T N.O. (Water ody) (CitylTown and/or County) The applicant has described to me, as shown below, the development proposed at the above location: I have no objection to this proposal. have objections to.this proposal, •DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must flll In descriptio !low or attach a site drawing) WAIVER SECTION I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. /f I do not wish to waive the 15' setback requireme (Propert,�n► Owner'I%nf�omiati ) Date (r-t ty Owner Information) S/ Print or Type Name • Mai in?Addrs — citynfQ01Zip Date (Revised V180012) COOS ZW ON S0 60 8T0Z/S0/C0 rip rap Pptnge , V1 n r A a 9oard /BumP°r 10000 ro P,°� 5 I 2m+ 5 10. 74 6 B •. --- ---_ JI' 28.E .—� — /�I °p \\` ,• ,\, �� � � ��yl N go do C—A In9 \\ G Ul — / $ taps e ev. � 0 - l 26' t o r Y ;l n e 5 me fr9 ',u' 1 b edge of ulkhead ldln�9q,aqy "Opt a °� i S ' tank '' bui te0s f II.9 `� / s F' F .2' i . V. io P6^,'�� 9.6' / c lets elev. n�_, flnDeer l�concrete �.•�� r—� j�i,j f� Vk 6rorY bank2. o tEt elev. 00 bUl Id tg 5 i eptic conorg 12•o rank t 0 62, 2 `'i \;\\ k wo "`\c deck; g 40°46'23E I2. (Y 17. 98' 9 elev. 8.3' s + .� elev. ' \ `eaJstin; E flnDer Plers 0 �. 7. I a t ramp i3+ \`` . J E 65 33 0 Pot n t �.. 6.9' e t b a ! ,/ '� `\� 22 tJ t a 10.2' +' e/ev. for 5 elev. V 31 9' ° e1Bv. /.•' e/ev. + e/ev. �� \ C. wooden ! 32' 00 05T %. *vent jjj —.;Iv,. _ y 6 F: 3 _1_.__ j ° // et a e/ev. got v 5 \x oerg 20' I J �of' A (o ov V existing e iron stake on I ine it bulkhead ; r 59 02 5 / a l 3/8/2018 USPS.com@ - USPS Tracking@ Results @ FAQs > (http://faq.usps.com/?articleld=220900) USPS Tracking Track Another Package + Tracking Number: 70173040000061580785 Remove X Your item was delivered at 9:01 am on March 6, 2018 in SWANSBORO, NC 28584. TM U.S. Postal Service CERTIFIED MAIL@ RECEIPT OV Delivered Lr) cc r- Domestic Mail Only M S ' WCP V' i' March 6, 2018 at 9:01 am co Ln Certified Mail Fee Delivered $ SWANSBORO, NC 28584 Extra Services & Fees (check box, add fee as to) El Return Receipt (hardcopy) $ C3 r-3 0 Return Receipt (electronic) $ Postmark Get Updates C3 El Certified Mail Restricted DaDelivery$ y Here Ej [I Adult Signature Required $ [3Aduft Signature Restricted Delivery $ r3 Postage $ C3 M Total Postage and F 27 -7 0 15 Text & Email Updates r'- Sent To C3- ----------------------------------------------------- r- CityState. --------------------------------------------------------------------- Tracking History Product Information See Less ^ Can't find what you're looking for? Go to our FAQs section to find answers to your tracking questions. FAQs (http://faq.usps.com/?articleld=220900) https://tools.usps.com/go/-FrackConfirmAction?tLabels=70173040000061580785 1/3 3/8/2018 uSPS.com@ - USPS Tracking@ Results The easiest tracking number is the one you don't have to know. With Informed Delivery®, you never have to type in another tracking number. Sign up to: • See images* of incoming mail. • Automatically track the packages you're expecting. • Set up email and text alerts so you don't need to enter tracking numbers. • Enter USPS Delivery InstructionsTM for your mail carrier. Sign Up (https://reg.usps.com/entreg/Reg istrationAction_input? *NOTE: Black and white (grayscale) images show the outside, front of letter -sized envelopes and mailpieces that are processed4pit�-.l�€Wpgi§&gd-O&�pK4* %2F%2Ftools.usps.com%2Fgc (https://www.usps.com/) https://tools.usps.com/go/TrackConfirmAction?tLabels=70173040000061580785 2/3 3/8/2018 USPS.com® - USPS Tracking® Results HELPFUL LINKS ON ABOUT.USPS.COM OTHER USPS SITES LEGAL INFORMATION Contact Us , About USPS Home Business Customer Gateway Privacy Policy (https://www.usps.Com/help/welc4M out.usps.com� (https://gateway.usps.com/) (http://about.usps.com/who-we- Site Index Newsroom Postal Inspectors are/privacy-policy/privacy-policy- (https://www.usps.com/globals/sit(Mtp://about.usps.com/news/welco ttpiTV#Wostalinspectors.uspis.go%mghIights.htm) index.htm) USPS Service Updates Inspector General Terms of Use FAQs (http://faq.usps.com/) (http://about.usps.com/news/servi"p://www.uspsoig.gov/) (http://about.usps.com/termsofuse.htm. alerts/welcome.htm) Postal Explorer FOIA Forms & Publications (http://pe.usps.gov/) (http://about.usps.com/who-we- (http://about.usps.com/forms- National Postal Museum are/foia/welcome.htm) publications/welcome.htm) (http://www.postaimuseum.si.edu44o FEAR Act EEO Data Government Services Resources for Developers (http://about.usps.com/who-we- (https://www.usps.com/gov- (https://www.usps.com/webtools/wB4bmmNtebtra�t/welcome.htm) services/gov-services.htm) Careers (http://about.usps.com/careers/welcome.htm) Copyright © 2018 USPS. All Rights Reserved. (https://www.facebook.com/USPS?rf=l 08501355848630) (https://twitter.com/usps) 0j (http://www.pinterest.com/uspsstamps/) Q(https://www.youtube.com/usps) https://tools.usps.com/go/TrackConfirmAction?tLabels=70173040000061580785 3/3