Loading...
HomeMy WebLinkAboutBarrett, ChrisL�CAIVIA --'DREDGE & FILL A B, ("C',' D GENERAL PERMIT Previous permit :JNew ,YModification ElComplete Reissue El Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC F7 Rules attached. Applicant Name Project Location: County Address Street Address/ State Road/ Lot #(s) City State 1�r zlpl�ii'� Phone # O E-Mail Subdivision - City ZIP Authorized Agent A C ❑ CW _NEW kTA F1 ES 0 PTS Phone# River Basin Affected [I OEA Ll HHIF Ll 1H El USA El N/A . I /unkn) AEC(s): Adj. Wtr. Body Jin ��al El IPWS: Wtr. Body A&V I .7 nRW- vp- / no PNA yes / no Closest Maj. Type of Project/ Activity -1(icalle:/ Pier (dock) length —7 Fixed Platform(s) Floating Platform(s) Finger pier(s) Groin length number 4L T_ Bulkhead/ Riprap length < avg distance offshore—,- 4- max distance offshore Basin, channel i -- — — -- — — -------- cubic yards Boat ramp Boathouse/ Boatlift Beach Bullclo7ing . . . .......... :7_+_ 0% Other . ................. A Shoreline Length SAV: not sure yes no Moratorium: n/a yes no Photos: yes no Waiver Attached: yes no A building permit may be required by: A4❑See note on back regarding River Basin rules. Note Local Planning jurisdiction) Notes/ Special Conditions Agent or, cant Printed Name Signature Please read compliance statement on back of permjt Permit Officer;s-Printed Name - Signature" Application Fee(s) Check # Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules Other: '_.1 Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888ARCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow - North of New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) http://www.nccoastalmanagement.net/ Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover, Onslow - South of New River Inlet - and Pender Counties) Revised 08/27/14 I It From: VW Edwards vic@vicedwardscpa.com Subject: RE: Barrett Project Date: Aprit 11, 2018 at 11-40 AM To: Brandi Robertson brandiprobertson@gmail.com Hi Brandi, Okay. I confirm I have received your e-mail and agree to the change to the CAMA Permit for the Mooring piling. Thanks, Vic From: Brandi Robertson [mailto:brandiprobertson@gmail.comj Sent: Wednesday, April 11. 2018 11:35 Aki To: Vic Edwards <vic@vicedwardscpa.com> Subject: Re: Barrett Project He wants to install a 30' Piling about 75' from the end of his dock's platform. It would be a mooring piling out in the river (inside his Riparian Property Lines) that would allow him to tie his boat up in the event of a storm or if the tide is too low for him to get his boat inshore to his dock. Brandi Prescott Robertson B Prescott Marine Construction. LLC 252-249-0149 brandiprobertsonna,gmail.com On Apr 11, 2018, at 11:09 AM, Vic Edwards <vic v vicedwardscpa.com> wrote: Hi Brandi, 1 just left you a message on your phone. I just want to make sure I understand what is being done. Thanks, Vic From: Brandi Robertson [mailto:brandiprobertson@gmail.com Sent: Wednesday, April 11, 2018 10:18 AM To: Vic Edwards <vic@vicedwardscpa.com> Subject: Barrett Project :fear Property Owners, Mr. Barrett would like to update his existing CAMA Permit to include a Mooring piling that would be installed approximately 75' off the end of his dock. The Piling will be marked IT , :U% with appropriate reflectors for safety. Please respond to this email confirming that you have been notified about the Mooring piling. If you have any questions please do not hesitate to contact trt6. Sincerely, Brandi Prescott Robertson B Prescott Marine Construction. LLC 252-249-0149 brandi robertson@gmail.com From: jeff Trvon tryon.jeff@gmail.com Subiect: He: tsarrett Morning Ptf+ng ' Date: April 11, 2018 at 10-31 AM To: ctranot mopertson brandiprobertson@gmail.com I have received the notification of the undated LAMA oer-ft for pnr Bey -- ,Jell 11 V11, Sent from my ftv-. On Apr 11, 2018, at 10:16 AM, Brandi Robertson <brandiprobertson@gmail.com> wrote: Dear Property Owners, Mr. Barrett would like to update his existing CAMA Permit to include a Mooring piling that would be installed approximately 75' off the end of his dock. The Piling will be marked with appropriate reflectors for safety. Please respond to this email confirming that you have been notified about the Mooring piling. If you have any questions please do not hesitate to contact me. Sincerely, Brandi Prescott Robertson B Prescott Marine Construction, LLC 252-249-0149 brandiprobertson @ gmail.com 2i�