HomeMy WebLinkAboutBarrett, ChrisL�CAIVIA --'DREDGE & FILL A B, ("C',' D
GENERAL PERMIT Previous permit
:JNew ,YModification ElComplete Reissue El Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC F7 Rules attached.
Applicant Name Project Location: County
Address Street Address/ State Road/ Lot #(s)
City
State 1�r zlpl�ii'�
Phone # O E-Mail Subdivision -
City ZIP
Authorized Agent A C
❑ CW _NEW kTA F1 ES 0 PTS Phone# River Basin
Affected [I OEA Ll HHIF Ll 1H El USA El N/A . I /unkn)
AEC(s): Adj. Wtr. Body Jin ��al
El IPWS:
Wtr. Body A&V I .7
nRW- vp- / no PNA yes / no Closest Maj.
Type of Project/ Activity
-1(icalle:/
Pier (dock) length
—7
Fixed Platform(s)
Floating Platform(s)
Finger pier(s)
Groin length
number
4L
T_
Bulkhead/ Riprap length <
avg distance offshore—,-
4-
max distance offshore
Basin, channel i
-- — — -- — — --------
cubic yards
Boat ramp
Boathouse/ Boatlift
Beach Bullclo7ing . . . .......... :7_+_
0%
Other . .................
A
Shoreline Length
SAV: not sure yes no
Moratorium: n/a yes no
Photos: yes no
Waiver Attached: yes no
A building permit may be required by:
A4❑See
note on back regarding River Basin rules.
Note Local Planning jurisdiction)
Notes/ Special Conditions
Agent or, cant Printed Name
Signature Please read compliance statement on back of permjt
Permit Officer;s-Printed Name -
Signature"
Application Fee(s) Check # Issuing Date
Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules Other:
'_.1 Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters
400 Commerce Ave
Morehead City, NC 28557
252-808-2808/ 1-888ARCOAST
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -
North of New River Inlet- and Pamlico
Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
http://www.nccoastalmanagement.net/
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow - South of New River Inlet -
and Pender Counties)
Revised 08/27/14
I It
From: VW Edwards vic@vicedwardscpa.com
Subject: RE: Barrett Project
Date: Aprit 11, 2018 at 11-40 AM
To: Brandi Robertson brandiprobertson@gmail.com
Hi Brandi,
Okay. I confirm I have received your e-mail and agree to the change to the CAMA Permit for
the Mooring piling.
Thanks,
Vic
From: Brandi Robertson [mailto:brandiprobertson@gmail.comj
Sent: Wednesday, April 11. 2018 11:35 Aki
To: Vic Edwards <vic@vicedwardscpa.com>
Subject: Re: Barrett Project
He wants to install a 30' Piling about 75' from the end of his dock's platform. It would be a
mooring piling out in the river (inside his Riparian Property Lines) that would allow him to tie his
boat up in the event of a storm or if the tide is too low for him to get his boat inshore to his dock.
Brandi Prescott Robertson
B Prescott Marine Construction. LLC
252-249-0149
brandiprobertsonna,gmail.com
On Apr 11, 2018, at 11:09 AM, Vic Edwards <vic v vicedwardscpa.com> wrote:
Hi Brandi,
1 just left you a message on your phone. I just want to make sure I understand
what is being done.
Thanks,
Vic
From: Brandi Robertson [mailto:brandiprobertson@gmail.com
Sent: Wednesday, April 11, 2018 10:18 AM
To: Vic Edwards <vic@vicedwardscpa.com>
Subject: Barrett Project
:fear Property Owners,
Mr. Barrett would like to update his existing CAMA Permit to include a Mooring piling that
would be installed approximately 75' off the end of his dock. The Piling will be marked
IT , :U%
with appropriate reflectors for safety. Please respond to this email confirming that you
have been notified about the Mooring piling.
If you have any questions please do not hesitate to contact trt6.
Sincerely,
Brandi Prescott Robertson
B Prescott Marine Construction. LLC
252-249-0149
brandi robertson@gmail.com
From: jeff Trvon tryon.jeff@gmail.com
Subiect: He: tsarrett Morning Ptf+ng '
Date: April 11, 2018 at 10-31 AM
To: ctranot mopertson brandiprobertson@gmail.com
I have received the notification of the undated LAMA oer-ft for pnr Bey --
,Jell 11 V11,
Sent from my ftv-.
On Apr 11, 2018, at 10:16 AM, Brandi Robertson <brandiprobertson@gmail.com> wrote:
Dear Property Owners,
Mr. Barrett would like to update his existing CAMA Permit to include a Mooring piling that would be installed approximately 75' off the end of
his dock. The Piling will be marked with appropriate reflectors for safety. Please respond to this email confirming that you have been
notified about the Mooring piling.
If you have any questions please do not hesitate to contact me.
Sincerely,
Brandi Prescott Robertson
B Prescott Marine Construction, LLC
252-249-0149
brandiprobertson @ gmail.com
2i�