HomeMy WebLinkAboutBowmen, Harryf/
aNe
AMA / ❑DREDGE & FILL A BCfD
NEPERMIT Previous permitw -Modification Complete Reissue Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources ` "V"
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
Rules attached.
r "4`
Applicant Name'# 'f ve 11 _ 9 4 /,. , Project Location: County
Address Street Address/ State Road/ Lot #(s)
� i
City _.. Statei.• ZIP t � .r
IS
Phone # ( ) � i � hf E-Mail
Authorized Agent
Affected -- CW EW PTA C ES
AEC(s): OEA - HHF - IH UBA
_ PWS:
ORW: yes / no PNA yes / no
Type of Project/ Activity
Pier (dock) length
Fixed Platform(s)
Floating Platform(s)
Finger pier(s)_
Groin length
number
Bulkhead/ Riprap length_
avg distance offshore
max distance offshorQ
Basin, channel {
cubic yards_
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
e�
Other
Shoreline Length -` ' -)
SAV: not sure yes no —
Moratorium: n/a yes no
Photos: yes no
Waiver Attached: yes no
A building permit may be required by
( Note Local Planning jurisdiction)
Notes/ Special Conditions
Agent or Applicant Printed Name
PTS
N/A
Subdivision
tl '
ZIP
City .. �
Phone # (_ ) River Basin
Adj. Wtr. Body (nat /man /unkn)
Closest Maj. Wtr. Body --
(Scale:r.�
[ See note on back regarding River Basin rules.
r
Signature Please read compliance statement on bacK of permit --
Application Fee(s) Check #
PermitO icer's Printed Name.. _,.
Signatur
Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules Other:
l' Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office (910-796-7215) for more information on howto complywith these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters
400 Commerce Ave
Morehead City, NC 28557
252-808-2808/ I-888-4RCOAST
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -
North of New River Inlet- and Pamlico
Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
http://www.nccoastalmanagement.net/
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow - South of New River Inlet -
and Pender Counties)
Revised 08/27/14
Scott D. Nafe, JD, MAI
201 Elkin Highway, Suite F
North Wilkesboro, NC 28659
336-918-0398
scottnafe@gmail.com
February 27, 2018
Mr. Ryan Davenport
CAMA
Mr. Davenport:
The Mirror Factory Industrial Center
Key City Antique Mall & Shoppes
Melody Square Mall
Carolina Heritage Cabinetry
Southern Candle Company
Revient Reclaimed Wood
Boone Custom Forest Products
This letter is to inform you that Harry Bowen, of Bowen Clam Seed, of Marionville VA has my consent to
apply for CAMA permits, and any other County or local permits necessary for their Aquaculture business
in my name as the owner of the property at 1290 Marshallberg Road in Marshallberg, NC.
Should you have any questions regarding the granting of this consent, please do not hesitate to contact
me directly for clarification.
Respectfully,
Scott D. Nafe
CERTIFIED MAIL • RETURN RECEIPT REQUESTED
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION[WAIVER FORM
Name of Property Owner: /%u ✓v�� Bowe'--'-
Address of Property: �� df7 �/� ��e/ 7 �uvs�u/��cr2 �ar
(Lot or Street #, Street or Road, City & County)
Applicant phone #: ' Mailing Address: 0i''Z
Auer,',,, /� Vc�, Z 7 yO�i
I hereby certify that I own property adjacent to the above referenced property. The individual
applying for this permit has described to me as shown on the attached drawing_the development
they are proposing. A description or drawing, with dimensions, must be provided with this letter.
1 have no objections to this proposal. I have objections to this proposal.
If you have objections to what is being proposed, you must notify the Division of Coastal Management
(DCM) in writing within 10 days of receipt of this notice. Contact information for DCM offices is
available at www.nccoastalmangement.net/contact dcm.htm or by calling 1-888-4RCOAST. No
response is considered the same as no objection if you have been noted by Certified Mail.
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, or lift must be set back a
minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to
waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
f� I do not wish to waive the 15' setback requirement.
(Property Owner Information) (Riparian Property Owner Information)
Signat Signature
/41lle5-1- aAl/ =Sous LLC
Print or T pe Name Print or Type Name ^k,
Mailing Address Mailing Address
144ec ", > 'V //. VC4
City/State/Zip
-75' 7 — 6 �1 3
Telephone Number
Date
G�1�s � ors mac, 2 7s.� y
City/State/Zip
Telephone Number
WOQ
Date
SECTION .1900 — GENERAL PERMIT TO ALLOW FOR TEMPORARY STRUCTURES WITHIN COASTAL
SHORELINES AND OCEAN HAZARD AECS
15A NCAC 07H .1901 PURPOSE
A permit under this Section shall allow for the placement of temporary structures within estuarine and public trust shorelines,
and ocean hazard AECs according to the provisions provided in Subchapter 7J A 100 and according to the rules in this
Section.
History Note: AuthorityG.S. 113-229(cl); 113A-107(a)(b); 113A-113(b); 113A-118.1;
Eff. March 1, 1989;
Amended Eff. August 1, 2000.
15A NCAC 07H .1902 APPROVAL PROCEDURES
(a) The applicant must contact the Division of Coastal Management and complete a general permit application form
requesting approval for development. Applicants shall provide information on site location, dimensions.of the project area,
proposed activity, name, address, and telephone number.
(b) The applicant must provide:
(1) 'confirmation that a written statement has been obtained signed by the adjacent riparian property owners
indicating that they have no objections to the proposed work; or
(2) confirmation that the adjacent riparian property owners -have been notified by certified mail of the proposed
work. Such notice should instruct adjacent property owners to provide any comments on the proposed development
in writing for consideration by permitting officials to the Division of Coastal Management within ten days of receipt
of the notice, and, indicate that no response will be interpreted as no objection. DCM staff will review all comments
and determine, based on their relevance to the potential impacts of the proposed project, if the proposed project can
be approved by a General Permit. If DCM staff finds that the comments are worthy of more in-depth review, the
applicant will be notified that he must submit an application for a major development permit.
(c) No work shall begin until an onsite meeting is held with the applicant and a Division of Coastal Management
representative to inspect and mark the site of construction of the proposed development. Written authorization to proceed
with the proposed development may be issued by the Division during this visit. All work must be completed and the structure
removed within 180 days following the day written authorization is issued.
History Note: Authority G.S. 113-229(cl); 113A-107(a)(b); 113A-113(b); 113A-118.1;
Eff. March 1, 1989;
Amended Eff. January 1, 1990.
15A NCAC 07H .1903 PERMIT FEE
The applicant shall pay a permit fee of two hundred dollars ($200.00) by check or money order payable to the Department.
History Note: Authority G.S. 113-229(cl); 113A-107; 113A-113(b); 113A-118.1; 113A-119; 113A-119.1;
Eff. March 1, 1989;
Amended Eff. September 1, 2006, August 1, 2000; March 1, 1991.
15A NCAC 07H .1904 GENERAL CONDITIONS
(a) Temporary structures for the purpose of this general permit are those which are constructed within the ocean hazard or
estuarine system AECs and because of dimensions or functions do not meet the criteria of the existing general permits (i.e. are
not a bulkhead, pier, rip -rap, groin, etc.).
(b) There shall be no encroachment oceanward of the first line of stable vegetation within the ocean hazard AEC except for
the placement of auxiliary structures such as signs, fences, posts, pilings, etc.
(c) There shall be no fill activity below the plane of mean high water associated with the structure.
(d) This permit will not be applicable to proposed construction where the Department has determined, based on an initial
review of the application, that notice and review pursuant to G.S. 113A-119 is necessary because there are unresolved
questions concerning the proposed activity's impact on adjoining properties or on water quality; air quality; coastal wetlands;
cultural or historic sites; wildlife; fisheries resources; or public trust rights.
(e) Individuals shall allow authorized representatives of the Department of Environment and Natural Resources to make
periodic inspections at any time necessary to ensure that the activity being performed under authority of this general permit is
in accordance with the terms and conditions prescribed herein.
(f) This permit does not eliminate the need to obtain any other state, local or federal authorization, nor, to abide by
regulations adopted by any federal, state, or local agency.
M
(g) Development carried out under this permit must be consistent with all local requirements, and local land use plans current
at the time of authorization.
History Note: Authority G.S. 113-229(cl); 113A-107(a)(b); 113A-113(b); 113A-118.1;
Eff. March 1, 1989;
Amended Eff. May 1, 1990; March 1, 1990;
RRC Objection dace to ambiguity Eff. May 19, 1994;
Amended Eff. August 1,1998; July 1, 1994.
15A NCAC 07H .1905 SPECIFIC CONDITIONS
Proposed temporary structures must meet each of the following specific conditions to be eligible for authorization by the
general permit:
(1) All aspects of. the structure shall be removed and the site returned to pre -project conditions at the
termination of this general permit.
(2) There shall be no work within any productive shellfish beds.
(3) The proposed project shall not involve the disturbance of any marsh, submerged aquatic vegetation, or
other wetlands including excavation and/or filling of these areas.
(4) The proposed activity shall not involve the disruption of normal navigation and transportation channels and
shall be properly marked to prevent being a hazard to navigation.
(5) The proposed project shall not serve as a habitable place of residence.
(6) There shall be no adverse disturbance of existing dune structures.
(7) Development carried out under this permit shall not exceed one acre in size in accordance with 15A NCAC
2H .1.002(1) and 15A NCAC 2H .1003(a)(1).
(8) No sewage disposal system will be allowed without a permit authorized by either the Division of
Environmental Health or the Division of Environmental Management.
History Note: Authority G.S. 113-229(cl); 113A-107(a)(b); 113A-113(b); 113A-118.1;
Eff. March 1, 1989;
Amended Eff. May 1, 1990.
62
/OL/C 12
41
ry
a/n� yV