Loading...
HomeMy WebLinkAboutWheeler, Dempster1"A GE & FILL A B D GENERAL PERMIT Previous permit # M _1N E:J ElComplete Reissue DPartial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC 'A attached. ules Applicant Name Project Location: County Address Street Address/ State Road/ Lot #(s) City r ZIP. State,. PhoneflO i E-Mail Subdivision 4 Authorized Agent City f ZIP Phone # Affected EJ CW E] EW E] PTA PTS River Basin 0 OEA El HHF DIH El USA 0 N/A AEC(s): Adj. Wtr. Body (nat /man /unkn El PWS: ORW: yes/ no PNA yes It, "'no Closest Maj. Wtr. Body L Type of Project/ Activity Pier (dock) length Fixed Platform(s) Floating Platforrn(s)� Finger pier(s) Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel cubic yards Boat ramp,. Boathouse/ Boatlift' Beach Bulldozing Other ...... .... Shoreline Length SAV: {not yes no Moratorium: n/a yes /'no Photos: yes if no Waiver Attached: yes no,,r A building permit may be required by: Note Local Planning jurisdiction) I - Notes/ Special Conditions Agent or,) Signature, A (Scale: See note on back regarding River. Basin rules. J1 L PermitOfficer's P i4ed Name I /0 _t1/6J, 11, Please"read compliance statement on back of permit" Signature,j Check# IssuingDate Expiration pi D Ex , atf. p, T -4, Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar -Pamlico River Basin Buffer Rules Other: Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to complywith these buffer rules. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave 943 Washington Square Mall Morehead City, NC 28557 Washington, NC 27889 252-808-2808/ I-888-4RCOAST 252-946-6481 Fax: 252-247-3330 Fax: 252-948-0478 (Serves: Carteret, Craven, Onslow - (Serves: Beaufort, Bertie, Hertford, Hyde, North of New River Inlet- and Pamlico Tyrrell and Washington Counties) Counties) Elizabeth City District Wilmington District 1367 U.S. 17 South 127 Cardinal Drive Ext. Elizabeth City, NC 27909 Wilmington, NC 28405-3845 252-264-3901 910-796-7215 Fax: 252-2643723 Fax: 910-395-3964 (Serves: Camden Chowan, Currituck, (Serves: Brunswick, New Hanover, Dare, Gates, Pasquotank and Perquimans Onslow - South of New River Inlet - Counties) and Pender Counties) http-//www.nccoastalmanagement.net/ Revised 08/27/ 14 ' AMA / El DREDG E & FILL Tql67419 4ENFRAL PERMITPrevious A B D permit # ew OModification El Complete Reissue ElPartial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NICAC -4— Applicant Name f .2Q Rules attached. [,,w Project Location: County Address— (-l""t Street Address/ State Road/ Lot #(s) G aJ city Statk(I ZIP LV T- Phone # E-Mail Subdivision Authorized Agent L4 �City ZIP -'p6w, XM PTA ES -41�PTS Phone # Affected A River Basin 0 OEA 0 HHF 0 1H 0 UIBA El N/A AEC(s): Adj. Wtr. Bo IL (n—at)/man unkn / El PWS: ORW: Closest Maj. Wtr. Body < yes /,/n--. PNA yes /0-0 Type of Prdject/ Activity 0 CKSf --)ey J oc r-,l Pier (dock) length_ .X Fixed. Platformw Floating Platform(s) Finger pier(s) Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel cubic yards Boat ramp Boathouse(Boatlii '71 Beach Bulldoz* Other I 7-a 7, 1-[i�-, Shoreline Length SAV: notsure' yes no Moratorium: n/a yes 'o-- Photos: yes no Waiver Attached: yes no (Scale: FILM! Hq ! MME 0 ENE In MMM 'a's FAFA WME FAMME NNUME M M M 0 memo EN MEN am M M M EMERN 0 No .1 M M WA EPA ION M ENE mom I Mill mom M Mi A building permit may be required by: (A Note Local Planning jurisdiction) ("I Notes/ Special Conditions O(404k ilia I- -T I I 'A A n A — 1 1. — I Nam' Permit Officer's Pri /A 4 11� 6 1 11]/,. 11 r, compliance f permit ASee note on back regarding River Basin rules. - J, '1/ .4- h 1 7Issuing .0 Date 1 NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Braxton C. Davis Governor Director BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY John E. Skvarla, III Secretary A riparian buffer authorization is required for pier, and docking facilities -a c-c-es-ways through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 0213.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water - Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the.conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty by DWR of up to $25,000 per day per violation. 1. Crossing is Perpendicular: Pier and docking facility access way must.cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring efforts. Pre -project site conditions: By your signature below you agree to be held responsible for meeting all of the conditions listed above a that all information provid-1 is complete and accurate. Agen or Applicant Printed Name Permit Officer's Signature e orApplicant Signature Issu Dat RECEIVED CAMA GENERAL PERMIT #:�� JAN 0 8 2015 F)CM-MHO Clly Washington Office Morehead City Office Wilmington Office 943 Washington Square Mall 400 Commerce Avenue 127 Cardinal Drive Ext. Washington, NC 27889 Morehead City, NC 28557 Wilmington, NC 28405-3845 Phone 252-946-6481 Phone 252-808-2808 Phone 910-796-1215 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper x 4' Connell, Brad From: Brandi Robertson <brandiprobertson@gmail.com> Sent: Tuesday, January 13, 2015 7:04 PM To: Connell, Brad Subject: Re: REVISED -- General Permit # 67419C Ok, will do. Thanks. On Tue, Jan 13, 2015 at 4:36 PM, Connell, Brad <brad.connell@ncdenr. oovv> wrote: Mrs. Robertson, Regarding Dempster Wheeler's permit, issued for a proposed dock at 150 Martins Creek Drive, please note that the waterbody width is 64' across at that location (as opposed to the 74' noted on the permit). Therefore, 16' waterward (and not 19') is the % limitation of the permit conditions to reflect this by saying that "tto lii�ttion�o �h� �''��at_erward of3t�i� shoreline." of this email, I am revising the Please reply confirmation that you have received and understand this revised condition of the permit. Brad Connell Field Representative NC Division of Coastal Management http://portal.ncdenr.org/web/cm/dcm-home E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 Brand! Prescott Robertson Permit Specialist B. Prescott Marine Construction, LLC 252-249-Of49 I DIVISION OF COASTAL MANAGEMENT AN&C-ENT RIPA t ERTY OVYNER NOTIFICATION FORM CERTIFIED MAIL • RETURN RECEIPT RCWEST D I hereby Certify that I own property adjacent to � .� ty- •S (Name of Property Owner) /I'I �_` (Address, Lot, Block, Road, etc.) on *- ire11'I in p Ll `t" f cl�-f CYO `I-` N.C. (Waterbody) (Cityrrown and/or County) AgerWs Name it. A1016i 'R dx Mailing Address: P-6 %k 1� Agents phone it 2Lfq -61 �JCJ He/She has described to me as shown below the development he/she is proposing at that location, and I have no objections to the proposal. DESCRIPTION ANDIOR DRAWING OF PROPOSED DEVELOPMENT (MdWual proposing development must fdl In description below or attach a site drawing) K, e, ins . Pry pa-+y provosecl 00C L L4� N)5—+1.; If -'+ jet(AYfin elut- e' Ifyouhaveobpwftns to wftgis6jj4preobsek AM mustnotify0n Mkion OfCoasfa Mwaagement (DCAI) in writing within 10 days of tuceiptof this notice. Contact Informaton for DCH offices is avai/awe at www.nccoasta/mang tne&bon&act dcrahbn or by ca0ing 14W-a?40AS?: No response is considered the same as no objection if you have bee» noted b r�Cwiitieal Mail (Property Owner Information) Signature Print or Type Name Making Address 0ty/State 0P Telephone Number Hate V-�� cdcv ( rian Property er Infomnation) So aiurel - - Crl���- RoA �raijrItt Print of TjyNam Marling Address CHVISf &OP RECEIVED JAN 0 8 2015 Facrw:ronv+p tffw Te%phone Number. Date Estimate It. PrescM Mavine ConstrucHon, LLC DATE: DECEMBER 1% 2014 PO Box 874, M-mmftt, HC 28571 Ph. 252-249-0149 Fax 252-249-0394 babby@prescatbnarinecorntnxtion.cmn TO Denqxmw Wheeler SALESPERSON JOB Bobby Prescott Dock Project DESCRIqVON UNITPRICE LOW TOTAL Concrete Walkway; 5-x110'= 550 sq ft 1 Concrete Platform: 5*x48*= 240 sq ft Step Down- 5'x8'= 40 sq ft Dock House Raw- 5'x2W= 100 sq it Total Square Footage = 930 sq ft S25 per sq it $23,250.OD Catwalk: 26' x 2W= 70 sq ft $23 per sq ft $1,610-00 7,000lb, Boat Uft $6,159-47 $6,159-47 4 Boat Lift Pelkw 9.x30' - cost at Instalb tion $"S each $1,780.00 Lift Installation Fee $450 S450-00 CAMA Permitting Fee $200 S200.00 0 All final Invoices will be based an 'AS BUILT' dimensi ons- 0 Tree Removal - TBD- Tree removal professional any Willnot be able to determine until we are an site wil )e required_ h equipment - TOTAL Quotation prepared by- RECI To accept this quotation, sign here and retum JAN 0 DMAIL-4i 811TACHEO w-'4,40 WMK YOU V6R I IOM NWHESSI WED 8 20153 -!n CITY ■ C,omplete Items-1, 2, and 3. Also complete ifem 4 if Restricted Delivery is desired. • Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: 2. Article Number (Transfer from service label) PS Form 3811, February 2004 A. � /?gent ddressee B. Received by (Printed Name) C. Date of Delivery i� nt -t c-1 .c.c.s 1s=rs D. Is delivery address different from item 1? ❑ Yes If YES, enter delivery address below: ❑ No 3. Service Type Certified Mail ❑ Express Mail ❑ Registered ❑ Retum Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 7011 0470 0003 2516 7686 Domestic Retum Receipt /.. UNITED STATES POSTAL SERVICE �.,= ,,, A ',ice • Sender: Please print your name, address, and ZCP", Itf this box B PRESCOTT MARINE 7STRUCTION, LLC po BOX 874 ORIENTAL, NC 26571 Brownlow, Roy From: Brownlow, Roy Sent: Friday, January 16, 2015 3:02 PM To: 'ncannon @ ec.rr.com' Cc: Davis, Braxton C (Braxton. Davis@NCDENR.Gov); Connell, Brad; Willis, Angela; Goebel, Christine; 'brandiprobertson @gmail.com' Subject: CAMA General Permit 6714-C Attachments: thirdparty.doc; wheeler gp-01162015143745.pdf Mr. Gary Cannon, Hope this finds you doing well and thank you for your concerns about coastal resources. Per your request On 1/16/2015, please find below information pertaining to your rights to appeal State Permit (CAMA General Permit ) #67419-C issued to Dempster Wheeler on 01/16/2015 for a pier, fixed platform, floating platform, finger pier, boatlift and one boat slip. A copy of the permit is attached to this message. Information about third party appeals is described below. The Third Party Hearing Request form is attached to this message. Should you decide to appeal this permit determination, please submit your completed application to Angela Willis in the Morehead City Headquarters, 400 Commerce Avenue, Morehead City, NC 28557. Please feel free to contact me or Angela Willis at the Morehead City District Office if you have any questions. Roy Brownlow NC Division of Coastal Management District Manager, Morehead City District Office & Compliance Coordinator NCDENR NC Division of Coastal Management 400 Commerce Ave Morehead City, NC 28557 (252) 808-2808 Extension 217 Rov.Brownlow @ ncdenr.aov www.nccoastalmanagement.net Please visit www.nccoastaimanaciement.net to subscribe to Coastal Management's quarterly newsletter, the CAMAgram. E-mail correspondence to and from this address maybe subject to the North Carolina Public Records law and may be disclosed to third parties. THIRD PARTY APPEALS Other directly affected people, such as neighbors or other affected parties, may request a hearing on the permit decision. This petition for a third -party hearing must be received by the director of DCM within 20 days of the permit decision. Within 15 days of receiving the request, the chairman of the CRC will decide if a petitioner is entitled to a third -party hearing. To get a hearing, a petitioner must [113A 121.1(b)]: • Allege that the permit decision is contrary to a statute or rule. • Show that the petitioner is directly affected by the permit decision. Demonstrate that the appeal is not frivolous. If the CRC chairman grants a hearing, you may file a Petition for a Contested Case Hearing in the Office of Administrative Hearings. You must carefully follow detailed procedures and forms required by the state Administrative Procedure Act. Further information on filing appeals is available from the Office of Administrative Hearings or DCM. Parties to the hearing may be represented by attorneys, or may represent themselves. After the hearing, the judge issues a decision. Contested cases that commence after Jan.1, 2012 will no longer be returned to the CRC for a final agency decision. The Administrative Law Judge's decision will be.the final decision. You may appeal the Administrative Law Judge's final decision to Superior Court within 30 days of the decision. Note: The CRC is not allowed to discuss specific appeals or other contested cases before it makes a decision. Do not attempt to contact CRC members to discuss your case. Third -party hearing request Word format (right -click on the file to save it to your computer) PDF format (requires the free Adobe Acrobat Reader) Appeals form for Office of Administrative Hearings (PDF format) Office of Administrative Hearings Website NCDENR - Variances & Appeals Connell, Brad From: GSuesslel@aol.com Sent: Tuesday, January 20, 2015 11:47 AM To: Connell, Brad Subject: Fwd: dock and boat lift on Martin Creek Dear Mr Connell, I do hope that you received this e-mail below upon your return to the office today. I am not sure whether your receive messages if an automatic response is sent out that you are not in the office, so just to make sure as I feel it is very important. I do apologize if you did receive it upon opening your e-mails. Speaking with Bobby Smith, he said that he would be in contact with you today. I hope that this can be resolved amicably. Dear Mr. Connell, This note is in reference to the dock and boat lift that Dempster Wheeler at 150 Martin Creek Drive Beaufort is planning on having constructed in Martin Creek. I know that you have spoken to Gary Cannon who is VERY concerned. We did receive a letter dated January 5th and I, as well as several other members of the Association did NOT give our approval to this project as we feel that it will have a negative impact on some people on the other side of the Creek. These people did not receive anv letter informing them of the proposed construction It is a narrow creek and some have fishing boats and sailboats that would have a difficult time being able to turn around in these waters. These families have been in the Community a long time (many 50+ years) and we as newcomers have a responsibility to respect them and their livelihoods. After all many benefit from what they do as we are fortunate to have excellent seafood. I respectfully urge you to revisit the situation and greatly involve all parties that are affected Thank you for caring about not only the environment but people who depend on our waters Good Health & God's Blessing, Gladys Suessle :) (252) 728.2118 U Connell, Brad From: searchIightnt@aol.com Sent: Tuesday, January 20, 2015 10:25 AM To: Connell, Brad Subject: South River -Martin Creek dock Brad, I have learned that a permit has been issued for a dock across from my property in South River, NC. This is at a narrow channel with limited depth. I am concerned that I won't be able to transit the area with our boats. I am on jury duty the first week of February. How can I participate in the appeal? Can you send me a nautical chart that shows accessibility after the proposed project? Thank you in advance. Nancy Tatum W Connell, Brad From: bobby smith <rlsmith61361@gmail.com> Sent: Sunday, January 18, 2015 9:47 PM To: Connell, Brad Subject: Inquire about new dock at Martin Creek PLEASE RESPOND TIME SENSITIVE [I REALLY NEED FOR YOU TO CONTACT ME BY PHONE IF POSSIBLE BEFORE MONDAY AT NOOMWILL BE UP TONIGHT UNTIL 11:00 919-658-2704 THANKS BOBBY SMITH MT. OLIVE NC [SMITH CHAPEL]