Loading...
HomeMy WebLinkAboutTown of Atlantic Beach (9)iew, MA /DREDGE &FILL A g VC D iaGERAL PERMIT Previous permit # N❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources f /� and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC 7// A r i ulesdattached. Applicant Name i ` _ ? ! ` `" Project Location: County' c `< ` "' • "'` Address_ _ :' t of Street Address/ State oad/ Lot #,(s) City / t ` ': `) n^ State ZIP Phone # Subdivision O E-Mail.. t t � r Authorized Agent r ` ( +'"1 CiZIP ❑ CW ,cftW L*TA ❑ ES ❑ PTS Phone # ( ) Ri .er Basin, Affected ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A " AEC(s): Adj. Wtr. Body , ,,, %�- :,.. at, man unkn ❑ PWS: t , ORW: yes /�no PNA yes Closest Maj. Win Body y ;` `" •'" " Type of Project/ Activity Pier (dock) length Fixed Platform(s) Floating Platform(s) Finger pier(s) Groin length number Bulkhead/ Riprap length avg distance offshore . max distance offshore Basi channe cubic yards Boat ramp Boathouse/ Boatlift Beach Other Shoreline Length SAV: not sure yes rl no , Moratorium: n/a . yes Photos: yes Waiver Attached: yes 4 ,,P A building permit may be required by: ( Note Local Planning Jurisdiction) Notes/ Special Conditions a, � .iM' I'l ;,t . -1 (,iI itp 4 NaVW dV0 Icn Signatu 0** Please Bead compliance statement on back of permit Signature �1 U Appli ionFee(s) Check# Issuin (Scale: is a Ex. pirafion Diate : W Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythatthis project is consistentwith the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: El Tar- Pamlico River Basin Buffer Rules ❑ Other: 0 Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow - North of New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow - South of New River Inlet - and Pender Counties) http://www.nccoastalmanagement.net/ Revised 08/27/ 14 (LAF {'DREDGE & FILL" GERAL PERMIT Previous Permit # A B c evModification ❑Complete Reissue ❑Partial Reissue Date.previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources % and the Coastal Resources Commission in an area of a vironmental concern pursuant to 15A NCAC ul attached.! Applicant Name i �. > _( Project Location: County Address i r `i �' qt Street Address StatePad/ Lot (s) Ci a P `N I ty State ZIPS Phone # (_) E-Mail Subdivision i Authorized Agent c/c r City �. , _ ,: ZIP Affected ❑ CW InIW .24TA ❑ ES ❑ PTS Phone # { _) Ri r Basin AEC S ❑ OEA ❑ HHF ❑ IH ❑ UBA El N/A �) Adj. Wtr. Body % .cam ,.: f a unkn ❑ PWS: ; ORW: yes / no PNA yes / rri Closest Maj. Wtr. Body 9 Type of Project/ Activity Pier (dock) length Fixed Platform(s) Floating Platform(s) Finger piers) Groin length number Bulkhead/ Ptiprap length avg distance offshore max distance offshore Basi channe. cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other Shoreline Length r� SAM not sure yes j no y Moratorium: n/a yes Rio Photos: yes o� Waiver Attached: yes /fir o, 14 A building permit may be required by: (Note Local Planning Jurisdiction) Notes/ Special Conditions NEON Z'1212M NFAW5112 EEiq"Em I NOR w ❑ See 1��I�I�II�i�il�lllll'li mil.®®® �iON MMEM MENEM NONE Tif61`ii'MMMMEM on ' !'...s � -� .'` . � K �j,� U /A h. 4i c �w"r j%�°v v+ •— ! � �. � ice^.' !, � P ease Oead compliance stater `.� App i tion Fees) TOWN OF ATLANTIC BEACH 125 WEST FORT MACON ROAD ATLANTIC BEACH, NORTH CAROLINA June 4, 2015 Ms. Heather Styron N C Division of Coastal Management 400 Commerce Ave Morehead City, NC 28557 Dear Ms. Styron, The Town of Atlantic Beach is requesting a CAMA general permit to do maintenance dredging of the Triple S Channel that leads to multiple residential boat docks and a commercial marina and boat ramp. The area that needs to be excavated is an area located nearly the same as we did last year, 300 feet by 15 feet, the average depth of excavation 2 feet or approximately 333 cubic yards. Without this dredging the boating access is rapidly becoming unusable. The disposal site we would use is a previous authorized site located on Atlantic Beach, commonly referred to as the Jungle Land site. All spoils material would be delivered by truck to the disposal site. A copy of the permit from last year's project is included in this package. If any additional information is required please do not hesitate to contact me. I thank you in advance. Sincerely RECEIVED JUN 0 8 2015 Marc S*ze`¢'"'�'E Public Services Director RECEIVED JUN 0 8 2015 DCM-MHO Ciro POST OFFICE BOX 1094 • ATLANTIC BEACH, NORTH CAROLINA 28512 • (252) 726-1366 • FAX (252) 726-4460 TOWN OF ATLANTIC BEACH . 125 WEST FORT MACON ROAD ATLANTIC BEACH, NORTH CAROLINA June 9, 2014 Ms. Heather Styron N C Division of Coastal Management 400 Commerce Ave Morehead City, NC 28557 Dear Ms. Styron, The Town of Atlantic Beach is requesting a CAMA general permit to do maintenance dredging of the Triple S Channel that leads to multiple residential boat docks. The area that needs to be excavated is an area near Day Markers 16 and 18, 250 feet by 15 feet, the average depth of excavation 2 feet or approximately 278 cubic yards. Without this dredging the boating access is rapidly becoming unusable. The disposal site we would use is a previous authorized. site located on Radio Island, commonly referred to as the Pake Construction site. All spoils material would be delivered by barge to the disposal site. If any additional information is required please do not hesitate to contact me. I thank you in advance. Sincerely, bZjjV,4, RECEIVED Marc Schulze JUN 0 91015 Public Services Director W)'"Ply plm RECEIVED JUN 0 8 1015 DCM-MHO coy POST OFFICE BOX 1094 • ATLANTIC BEACH, NORTH CAROLINA 28512 • (252) 726-1366 • FAX (252) 726-4460 d I6E 5 C %c RECEIVED JUN 0 9 2015 ot')�FvorlH PP ---- - �� Cu cl S RECEIVED_ JUN 0 8 2015 DCM-MHD CITY