HomeMy WebLinkAboutTown of Atlantic Beach (9)iew,
MA /DREDGE &FILL A g VC D
iaGERAL PERMIT Previous permit #
N❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources f /�
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC 7// A
r i ulesdattached.
Applicant Name i ` _ ? ! ` `" Project Location: County' c `< ` "' • "'`
Address_ _ :' t of Street Address/ State oad/ Lot #,(s)
City / t ` ': `) n^ State ZIP
Phone # Subdivision
O E-Mail.. t t � r
Authorized Agent r ` ( +'"1 CiZIP
❑ CW ,cftW L*TA ❑ ES ❑ PTS Phone # ( ) Ri .er Basin,
Affected ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A "
AEC(s): Adj. Wtr. Body , ,,, %�- :,..
at, man unkn
❑ PWS: t ,
ORW: yes /�no PNA yes Closest Maj. Win Body y ;` `" •'" "
Type of Project/ Activity
Pier (dock) length
Fixed Platform(s)
Floating Platform(s)
Finger pier(s)
Groin length
number
Bulkhead/ Riprap length
avg distance offshore .
max distance offshore
Basi channe
cubic yards
Boat ramp
Boathouse/ Boatlift
Beach
Other
Shoreline Length
SAV: not sure yes rl no ,
Moratorium: n/a . yes
Photos: yes
Waiver Attached: yes 4 ,,P
A building permit may be required by:
( Note Local Planning Jurisdiction)
Notes/ Special Conditions
a, � .iM'
I'l ;,t . -1 (,iI
itp 4
NaVW
dV0 Icn
Signatu 0** Please Bead compliance statement on back of permit Signature
�1 U
Appli ionFee(s) Check# Issuin
(Scale:
is a Ex. pirafion Diate :
W
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythatthis project is consistentwith the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
El Tar- Pamlico River Basin Buffer Rules ❑ Other:
0 Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters
400 Commerce Ave
Morehead City, NC 28557
252-808-2808/ 1-888-4RCOAST
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -
North of New River Inlet- and Pamlico
Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax:910-395-3964
(Serves: Brunswick, New Hanover,
Onslow - South of New River Inlet -
and Pender Counties)
http://www.nccoastalmanagement.net/
Revised 08/27/ 14
(LAF
{'DREDGE & FILL"
GERAL PERMIT Previous Permit # A B c
evModification ❑Complete Reissue ❑Partial Reissue Date.previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources %
and the Coastal Resources Commission in an area of a vironmental concern pursuant to 15A NCAC
ul attached.!
Applicant Name i �. > _( Project Location: County
Address i r `i �' qt Street Address StatePad/ Lot (s)
Ci a P `N I
ty State ZIPS
Phone # (_) E-Mail Subdivision
i
Authorized Agent c/c r City �. , _ ,: ZIP
Affected ❑ CW InIW .24TA ❑ ES ❑ PTS Phone # { _) Ri r Basin
AEC S ❑ OEA ❑ HHF ❑ IH ❑ UBA El N/A
�) Adj. Wtr. Body % .cam ,.: f a unkn
❑ PWS: ;
ORW: yes / no PNA yes / rri Closest Maj. Wtr. Body 9
Type of Project/ Activity
Pier (dock) length
Fixed Platform(s)
Floating Platform(s)
Finger piers)
Groin length
number
Bulkhead/ Ptiprap length
avg distance offshore
max distance offshore
Basi channe.
cubic yards
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
Other
Shoreline Length
r�
SAM not sure yes j no y
Moratorium: n/a yes Rio
Photos: yes o�
Waiver Attached: yes /fir o,
14
A building permit may be required by:
(Note Local Planning Jurisdiction)
Notes/ Special Conditions
NEON
Z'1212M NFAW5112 EEiq"Em I
NOR
w ❑ See
1��I�I�II�i�il�lllll'li mil.®®®
�iON MMEM MENEM
NONE Tif61`ii'MMMMEM
on
' !'...s � -� .'` . � K �j,� U /A h. 4i c �w"r j%�°v v+ •— ! � �. � ice^.'
!, �
P ease Oead compliance stater
`.�
App i tion Fees)
TOWN OF ATLANTIC BEACH
125 WEST FORT MACON ROAD
ATLANTIC BEACH, NORTH CAROLINA
June 4, 2015
Ms. Heather Styron
N C Division of Coastal Management
400 Commerce Ave
Morehead City, NC 28557
Dear Ms. Styron,
The Town of Atlantic Beach is requesting a CAMA general permit to do maintenance
dredging of the Triple S Channel that leads to multiple residential boat docks and a
commercial marina and boat ramp. The area that needs to be excavated is an area located
nearly the same as we did last year, 300 feet by 15 feet, the average depth of excavation 2
feet or approximately 333 cubic yards. Without this dredging the boating access is rapidly
becoming unusable.
The disposal site we would use is a previous authorized site located on Atlantic Beach,
commonly referred to as the Jungle Land site. All spoils material would be delivered by
truck to the disposal site.
A copy of the permit from last year's project is included in this package.
If any additional information is required please do not hesitate to contact me. I thank you
in advance.
Sincerely RECEIVED
JUN 0 8 2015
Marc S*ze`¢'"'�'E
Public Services Director
RECEIVED
JUN 0 8 2015
DCM-MHO Ciro
POST OFFICE BOX 1094 • ATLANTIC BEACH, NORTH CAROLINA 28512 • (252) 726-1366 • FAX (252) 726-4460
TOWN OF ATLANTIC BEACH
. 125 WEST FORT MACON ROAD
ATLANTIC BEACH, NORTH CAROLINA
June 9, 2014
Ms. Heather Styron
N C Division of Coastal Management
400 Commerce Ave
Morehead City, NC 28557
Dear Ms. Styron,
The Town of Atlantic Beach is requesting a CAMA general permit to do maintenance
dredging of the Triple S Channel that leads to multiple residential boat docks. The area
that needs to be excavated is an area near Day Markers 16 and 18, 250 feet by 15 feet, the
average depth of excavation 2 feet or approximately 278 cubic yards. Without this
dredging the boating access is rapidly becoming unusable.
The disposal site we would use is a previous authorized. site located on Radio Island,
commonly referred to as the Pake Construction site. All spoils material would be
delivered by barge to the disposal site.
If any additional information is required please do not hesitate to contact me. I thank you
in advance.
Sincerely,
bZjjV,4, RECEIVED
Marc Schulze
JUN 0 91015
Public Services Director W)'"Ply plm
RECEIVED
JUN 0 8 1015
DCM-MHO coy
POST OFFICE BOX 1094 • ATLANTIC BEACH, NORTH CAROLINA 28512 • (252) 726-1366 • FAX (252) 726-4460
d
I6E 5 C
%c
RECEIVED
JUN 0 9 2015
ot')�FvorlH PP
---- - �� Cu cl S RECEIVED_
JUN 0 8 2015
DCM-MHD CITY