Loading...
HomeMy WebLinkAboutNorris, Robert & Jay`CdCAINIA F rui I DREDGE & FILL GENERAL PERMIT Previous permit # QI�New ElModification El Complete Reissue ElPartial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources CIL) and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC 'Dil Rules attached. Applicant Name... Project Location: County -Address Street Address/ State Road/ Lot #(s) City t ti State kJ ZIP )I t ,Phone # Fax # (=) Subdivision uthorized Agent�-- City ZIP Affected 0 CW 'LIW 'n*TA El ES El PTS Phone # C-'L' —1), River Basin k AEC(s): I] OEA 0 HHF D 1H 0 UBA 0 WAAdj. Wtr. Body I Lat /man /unkn) El PWS: DFQ Closest Maj. Wtr. Body ORW: yes PNA yes no Crit.Hab. yes no Type of Project/ Activity I , k f 4 V Pier'dock l len h— Plad Fing Gro! Bulkt Basi Boat Boat Beac Oth Sho SAV-.1 Sand mopr. �Pho �Waj�� (Scale: 0 NEW :r pier(s) MOMEMEMEM i length number MEN WOMEW102 WOMMEMENNEMEMSEEMEAMMOMM ead/ Riprap length avg distance offshore IN 0 No 00—m—, 1111111111111M El 141 11101M max distance offshore, ME ME ,channel cubic yards MEMO MMEMEME111 mill MEMMONEME MEMMOMEMEM MEN ramp- MEMEMEMEMEM 0 MMMMMXMMMMM Milo Bulldozing M �aiiiiiaii��� pLength MEMENUM MEM OMEN ii I MEOMM NN —MMMI MMMEMMW NNIMMIMMMOMMEMMIN MOMME -!Iine -W.-w NNE NNOMMEN ME No NUMMENEME MEMEMMMOMM not sure yes no ONES MEMEN MMEN bags: not sure yes no MEMO NEEMEM torium: n/a yes no s: yes kn WMMMNMMMMMMEMMM ar Attached: Vpq A building permit may be required by: Notes/ Special Conditions ,ent or Applicant Printed Name f. 0 See note on back regarding River Basin rules. PermitOfficer's Signature pignature -7 r lease read compliance statement on back ot permit issuing Date Expiration Date i Apphca I Fee(s) Check # Local Planningjurisdi&ion Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that [)prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythat this project is consistentwith the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 Morehead City Headquarters. 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888ARCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT hereby certify that I own property adjacent to 's (Name of Property Owner property located at (Address, Lot, Block, Road, etc.) on �ii/(Q , in �� , N.C. body) (City/Town and/or County) The applicant has described to me, as shown below, the development proposed at the above location. I have no objection to this proposal. have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT lndwidual proposing development must fill in description below or attach_a site drawing) -- S I- t- i < <4c-f i9i2 - you '9C. 'cF'�F � o WAIVER SECTION ,� sjp�v 1 understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or Urbp must be set back a minimum distance of 15' from my area of riparian access unless waived b9- me. (If you wish to waive the setback, you must initial the appropriate blank below.) do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Property Owner Information) A G Signure o Type Name Mailing Addr ss City/Sta11� /QC Telephone Number/email address -)�2— e-!:T8—c7I c')C Date 11// C1 //T *Valid for one calendar year after signature` (Adjacent Property Owner Information) RECEIVED Signature* NOV 2 6 2014 �')71 S L= W /S OCM-MHD CUY Print or Type Name Mailing Address City/State2ip Telephone Number/email address Date yJ (Revised Aug. 2014) C:\BG4TLIFT\BOATLIFT.TXT 11/19/2014 10:38AM r a <- Existing Dock Structure -> <- Proposed Dock Structure —> 0 0-------- 0 0 0 0-------- 0 0 I I I I boat I I boat boat I I boat slip I I lift lift I I lift I I I 0 0 I I o 0 I I o o l l 0 o l l I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Diagram on left shows existing dock structure with boat lift on right and boat slip on left. This project involves replacing the existing boat slip on the left with a boat lift as shown in the diagram on the right. Pilings for proposed boat slip would be no further from dock than current bloat slip pilings and bottom pilings would actually be closer to top pilings so new boat lift would take up smaller foot print than current boat slip. ?r o RECENED Nov 2 6 7014 br-KA nHD effy Page: 1 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT hereby certify that I own property adjacent to 's (Name of Property Owner) property located at &-,,r (Address, Lot, Block, Road, etc.) on &C54-0L/ W;1" 1/4 , in &At4 4!041— , N.C. (Waterbody) (City/Town and/or County) The applicant has described to me, as shown below, the development proposed at the above location. I have no objection to this proposal. have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (►ndwidual proposingzdevelopmegt must fill; Wdescription below or attach a site drawing) WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groivPF must be set back a minimum distance of 15' from my area of riparian access unless waiv,04by C,*,2, me. (If you wish to waive the setback, you must initial the appropriate blank below.) Ip do wish to waive the 15' setback requirement. �l- I do not wish to waive the 15' setback requirement. (Property Owner Information) Sign ure I' IT-&) I - AlO U17-c Print or Type Name Mailing Address cir 6.r. /lZip C- Telephone Number/email address 2J 2- e3 a,— C>/ d F Date 4111//,� (Adjacent Property Ow:formation) Sim ature Print or Type Name Mailing Address City/State/Zip Telephone Number/email address RECEIVED Nnv 2 6 2014 oCM=Mfld Htf Date* (Revised Aug. 2014) *Valid for one calendar year after signature* C:\BOTgLIfT\BOATLIFT.TXT 11/19/2014 10:37AM <- Existing Dock Structure -> 0 0-------- 0 0 I I boat I I boat slip I I lift I I I I o 0 I I 0 o I I I I I I I I I I I I I I I I I I II I I I I I I <- Proposed Dock Structure -> 0 0-------- 0 0 I I boat I I boat lift I I lift I I I I o 0 0 o I I I I I I I I I I I I I I I I I I I I I I I I I I I I Diagram on left shows existing dock structure with boat lift on right and boat slip on left. This project involves replacing the existing boat slip on the left with a boat lift as shown in the diagram on the right. Pilings for proposed boat slip would be no further from dock than current bloat slip pilings and bottom pilings would actually be closer to top pilings so new boat lift would take up smaller foot print than current boat slip. �o OC RECEIVED NnV 2 6 2014 6c -MIAPJ t-,111Y Page: 1 C:\BOATLIF,T\BOATLIFT.TXT 11/20/2014 11:09AM 4 4 1 <- Existing Dock Structure -> 0 0-------- 0 0 I I boat I I boat slip I I lift I I I I 0 0 I I 0 o I I I I i I I i I I I I I I I I I I I I I I I I I I <- Proposed Dock Structure -> 0 0-------- 0 0 I I boat I I boat lift I I lift I I I I o 0 0 o I I I I I I I t I I I I I I I I I I I I I I I I I I I I Diagram on left shows existing dock structure with boat lift on right and boat slip on left. This project involves replacing the existing boat slip on the left with a boat lift as shown in the diagram on the right. Pilings for proposed boat slip would be no further from dock than current bloat slip pilings and bottom pilings would actually be closer to top pilings so new boat lift would take up smaller foot print than current boat slip. C� RECEIVED Nnv 2 g 2014 DCM-MHD CITY Page: 1