HomeMy WebLinkAboutNorris, Robert & Jay`CdCAINIA F rui
I DREDGE & FILL
GENERAL PERMIT
Previous permit #
QI�New ElModification El Complete Reissue ElPartial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources CIL)
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC
'Dil Rules attached.
Applicant Name... Project Location: County
-Address Street Address/ State Road/ Lot #(s)
City t ti State kJ ZIP )I t
,Phone # Fax # (=) Subdivision
uthorized Agent�--
City ZIP
Affected 0 CW 'LIW 'n*TA El ES El PTS Phone # C-'L' —1), River Basin k
AEC(s): I] OEA 0 HHF D 1H 0 UBA 0 WAAdj. Wtr. Body I Lat /man /unkn)
El PWS: DFQ
Closest Maj. Wtr. Body
ORW: yes PNA yes no Crit.Hab. yes no
Type of Project/ Activity I , k f 4 V
Pier'dock l len h—
Plad
Fing
Gro!
Bulkt
Basi
Boat
Boat
Beac
Oth
Sho
SAV-.1
Sand
mopr.
�Pho
�Waj��
(Scale:
0
NEW
:r pier(s)
MOMEMEMEM
i length
number
MEN
WOMEW102
WOMMEMENNEMEMSEEMEAMMOMM
ead/ Riprap length
avg distance offshore
IN
0
No
00—m—,
1111111111111M
El
141
11101M
max distance offshore,
ME
ME
,channel
cubic yards
MEMO
MMEMEME111
mill
MEMMONEME
MEMMOMEMEM
MEN
ramp-
MEMEMEMEMEM
0
MMMMMXMMMMM
Milo
Bulldozing
M
�aiiiiiaii���
pLength
MEMENUM
MEM
OMEN
ii
I
MEOMM
NN
—MMMI
MMMEMMW
NNIMMIMMMOMMEMMIN
MOMME
-!Iine -W.-w
NNE
NNOMMEN
ME
No
NUMMENEME
MEMEMMMOMM
not sure yes no
ONES
MEMEN
MMEN
bags: not sure yes no
MEMO
NEEMEM
torium: n/a yes no
s: yes
kn
WMMMNMMMMMMEMMM
ar Attached: Vpq
A building permit may be required by:
Notes/ Special Conditions
,ent or Applicant Printed Name
f.
0 See note on back regarding River Basin rules.
PermitOfficer's Signature
pignature -7 r lease read compliance statement on back ot permit issuing Date Expiration Date i
Apphca I Fee(s) Check # Local Planningjurisdi&ion Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that [)prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythat this project is consistentwith the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office
Mailing Address:
1638 Mail Service Center
Raleigh, NC 27699-1638
Location:
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
Morehead City Headquarters.
400 Commerce Ave
Morehead City, NC 28557
252-808-2808/ 1-888ARCOAST
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax:910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
hereby certify that I own property adjacent to 's
(Name of Property Owner
property located at
(Address, Lot, Block, Road, etc.)
on �ii/(Q , in �� , N.C.
body) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
location.
I have no objection to this proposal.
have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
lndwidual proposing development must fill in description below or attach_a site drawing)
-- S I- t- i < <4c-f i9i2 -
you '9C.
'cF'�F
� o
WAIVER SECTION ,� sjp�v
1 understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or Urbp
must be set back a minimum distance of 15' from my area of riparian access unless waived b9-
me. (If you wish to waive the setback, you must initial the appropriate blank below.)
do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Owner Information)
A
G
Signure
o Type Name
Mailing Addr ss
City/Sta11�
/QC
Telephone Number/email address
-)�2— e-!:T8—c7I c')C
Date 11// C1 //T
*Valid for one calendar year after signature`
(Adjacent Property Owner Information)
RECEIVED
Signature* NOV 2 6 2014
�')71 S L= W /S OCM-MHD CUY
Print or Type Name
Mailing Address
City/State2ip
Telephone Number/email address
Date yJ
(Revised Aug. 2014)
C:\BG4TLIFT\BOATLIFT.TXT 11/19/2014 10:38AM
r
a
<- Existing Dock Structure -> <- Proposed Dock Structure —>
0 0-------- 0 0 0 0-------- 0 0
I I I I
boat I I boat boat I I boat
slip I I lift lift I I lift
I
I I 0 0 I I o 0
I I o o l l
0 o l l I I
I I I I
I I I I
I I I I
I I I I
I I I I
I I I I
I I I I
I I I I
I I I I
I I I I
I I I I
I I I I
Diagram on left shows existing dock structure with boat lift on right and
boat slip on left.
This project involves replacing the existing boat slip on the left with a
boat lift as shown in the diagram on the right. Pilings for proposed boat
slip would be no further from dock than current bloat slip pilings and
bottom pilings would actually be closer to top pilings so new boat lift
would take up smaller foot print than current boat slip.
?r o
RECENED
Nov 2 6 7014
br-KA nHD effy
Page: 1
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
hereby certify that I own property adjacent to 's
(Name of Property Owner)
property located at &-,,r
(Address, Lot, Block, Road, etc.)
on &C54-0L/ W;1" 1/4 , in &At4 4!041— , N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
location.
I have no objection to this proposal.
have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(►ndwidual proposingzdevelopmegt must fill; Wdescription below or attach a site drawing)
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groivPF
must be set back a minimum distance of 15' from my area of riparian access unless waiv,04by C,*,2,
me. (If you wish to waive the setback, you must initial the appropriate blank below.)
Ip
do wish to waive the 15' setback requirement.
�l-
I do not wish to waive the 15' setback requirement.
(Property Owner Information)
Sign ure I'
IT-&) I - AlO U17-c
Print or Type Name
Mailing Address
cir 6.r.
/lZip
C-
Telephone Number/email address
2J 2- e3 a,— C>/ d F
Date 4111//,�
(Adjacent Property Ow:formation)
Sim ature
Print or Type Name
Mailing Address
City/State/Zip
Telephone Number/email address
RECEIVED
Nnv 2 6 2014
oCM=Mfld Htf
Date*
(Revised Aug. 2014)
*Valid for one calendar year after signature*
C:\BOTgLIfT\BOATLIFT.TXT
11/19/2014 10:37AM
<- Existing Dock Structure ->
0 0-------- 0 0
I I
boat I I boat
slip I I lift
I I
I I o 0
I I
0 o I I
I I
I I
I I
I I
I I
I I
I I
I I
II
I I
I I
I I
<- Proposed Dock Structure ->
0 0-------- 0 0
I I
boat I I boat
lift I I lift
I I
I I o 0
0 o I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
Diagram on left shows existing dock structure with boat lift on right and
boat slip on left.
This project involves replacing the existing boat slip on the left with a
boat lift as shown in the diagram on the right. Pilings for proposed boat
slip would be no further from dock than current bloat slip pilings and
bottom pilings would actually be closer to top pilings so new boat lift
would take up smaller foot print than current boat slip.
�o
OC
RECEIVED
NnV 2 6 2014
6c -MIAPJ t-,111Y
Page: 1
C:\BOATLIF,T\BOATLIFT.TXT
11/20/2014 11:09AM
4 4 1
<- Existing Dock Structure ->
0 0-------- 0 0
I I
boat I I boat
slip I I lift
I I
I I 0 0
I I
0 o I I
I I
i I
I i
I I
I I
I I
I I
I I
I I
I I
I I
I I
<- Proposed Dock Structure ->
0 0-------- 0 0
I I
boat I I boat
lift I I lift
I I
I I o 0
0 o I I
I I
I I
I t
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
Diagram on left shows existing dock structure with boat lift on right and
boat slip on left.
This project involves replacing the existing boat slip on the left with a
boat lift as shown in the diagram on the right. Pilings for proposed boat
slip would be no further from dock than current bloat slip pilings and
bottom pilings would actually be closer to top pilings so new boat lift
would take up smaller foot print than current boat slip.
C�
RECEIVED
Nnv 2 g 2014
DCM-MHD CITY
Page: 1