Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCDOT (7)
EtAMA / ❑ DREDGE & FILL 1✓ •�`;; ;'' l (k� .;a•..�C A B (C, D ENERAL PERMIT Previous permit# EN"ew ❑Modification ❑Complete Reissue (]Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources fk� J and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC O Rules attached. Applicant,Name c' M f, f Project Location: County. ; Address f �t j " Street Address/ State Road/ Lot #(s) Clty ti" 1JJ . State ZIP l.; .;t. r Phone # a f - . } a ,-, .., o ; O E-Mail ) Subdivision t 4'. Authorized Agent City a j j ZIP ❑ CW ❑ EW Q PTA D ES DOTS Phone # ( ) River, Basin Affected - ❑OEA ❑HHF ❑IH ❑UBA El N/A�.rF. s AEC(s): Adj. Wtr. Body i (nat /mar- /unkn) ORW. yes /, no, PNA bt yes / 9 Closest Maj. Wtr. Body a., Type of Project/ Activity r: (Scale: ) Pier (dock) length Fixed Platform(s) s Floating Platform(s) Finger pier(s) Groin length number — Bulkhead/ Riprap length nr : i . s- ; - — �: , — ?— avg distance offshore max distance offshore -- — — — - Basin, channel i cubic yards Boat ramp - Boathouse/ Boatlift ' Beach Bulldozing Other 1, ✓ J t Shoreline Length = '� SAV: not sure yes f not "Ho ratorium: Na yes na Photos: no no Waiver Attached: yes no A building permit may be required by: 1 ❑ See note on back regarding River Basin rules. ( Note Local Planning jurisdiction) j . Jc / cif i l .. 1 �' .c l . , � , �° . "� i J, , y'` r / / � �-' =. / •� �.t � . J f l (� , J �..--. J is as i �'. Notes Special Conditions ' -T t 4' e - 1"t „s t , 1• [' d •,f''l i.: 1..�..� lii: , r" •..'i 4� �:�_ M. i' ! -v A�r'f ���! e.%'. Agent or Applicant -Printed; ame PermitOfficer's Printed Name ' .r Signature ** Please read compliance statement on back of permit" Signature w Application Fee(s) Check # Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, c6rtify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules ❑ Other: Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888ARCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow - North of New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover, Onslow - South of New River Inlet - and Pender Counties) http://www.nccoastalmanagement.net/ Revised 08/27/14 WmoiMEMiM A ♦ a -e a ■■■■■■■mom ■NOON ■■■■■■■■■■■■■■■■■■■■■■■■■ -_ ®■■MOE®OE■■■■■■■■■Ne■■■■■■■■■■NEE■■■■■■E ■OMEN ■■MEM■EMEM■NNNE®■■■■■MMM■M■M■N■EM■N ■■■■ ®N■®�O■■■PI■■UN■■®■r Sol moll ME■■■N■ ■■■■■ ��E NO 0ummonL'g■■w 'w1mummi ■■■■■■■ '; � - = ' � _ ' ■■■®■�iN■�■■■■■■®■EN■®NOON■■■®■®■®N■■■N� ■■■■N�®■N■■NOON■®�■®�■■■®®N■�I■®®®■■■NOON !®■■■®!®■■■■■■EMENN■N®■■■■EEN®EMME■E■EEEM NOON■■■ 12 ®ice®■■M■■■■■ NM.�■NM ■ pmom■MN !EElmagn■N■■■■■■■■■ iY �[ �i P r•■■■■■■■■■■NE■■RNMEMOMEM■®MENNEMENNUME ■ ■■■N■■■O■ fe O■■O■E■E■EeN■■ONO■■■■■O■O■®■■■■■E000■■■■ ■■■■■■N■■ Emu ■■N■eMOMEME■■■■■■■■■MEMEMMEN NMEE■EEO■■M®O■■■N■■N■■M■M■N■■■wNEr�■®■MM■ ► RS 0 m®■■■N■■■■M■■■■■ONO■MEMMEMEMEMEEEO • MENNMNNE■N■ i ■NEN®NE®■M■NE■NEMENN�NN■�NNMNMMNEM MENEW■NEE■■OMEN■■■■■■■■■■■M■■■■■■■O■■■■■ -- NM®M�MEM■NNN■E■MO■NN■■NN■N■MEN■■■■N■N■MM EM■ECM®N■O■O■■EEO■■EEEEEEEO■®■■■EEO■■■■■ s ■M■®■■EN■M■N■■NON■■®NMNNMN■■N■e■■■N■■■■■ 1geriti or Applicant P n Name Permit Officers Printed Nam/e ignat a '�"�' Please omho ance s ement on back of Permit "�"` Signature . !`� �1✓•r•• ��,.6 � :'�,,,..�� ��' I-+ :. �''...� _ '. .,,�"/� '. . �/� %"rim... �^.:''1 �ppiicaUon Feels) Check # Ezplration Date Issuing Date BCAIVIA /❑ DREDGE & FILL NO 67484 �e A B. � D VEN L PERMIT Previous permit # ew ❑Modification - ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC �� d ules attached. Applicant Name �" C '� b� Project Location: County Address 6 X l`Street Address/ State Road/ Lot #(s) of —7D City Crre .vj��c State 1� �"ZIP�-'7d" =15 ���SoTr )-Z r eJ'fi A JstM(il2 �lft�t Phone # (� ) ��� �-�a4 E-Mail bj d�nr���'`c o'rl6vSubdivision Authorized Agent Taknron City / C ZIP��6 Affected O CW ❑ EW p'1156TA ❑ ES af rTFS Phone # ( ) "" River Basin ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ WA l 'f-o No /�` ❑ PWS: f Zf ✓er AEC(s): Adj. Wtr. Body nat a unkn o r�i. ver' ORW. yes / no PNA yes / 0 Closest Maj. Wtr. Body Type of Project/ Activity .Zi2C%✓ 'oj 'l 1 r' . K (Scale: Wh ) Pier t r Fixes Flom Fing Groi Bulk Basli Boat Boat Bea( Othi Shor SAV Mor Phoi Wan number NENNNrUJZ n iead/ Riprap length u■��C�i� ff'VJ1rRM h. —0 avg distance offshore_ max distance offshore ■ '� ■moo■■■ ■��■� ■■o� ■ MIN MEMO 011 N M2 NENNE cubicyards-- ramp Bulldozing ��iii�i�auiie■iii�ii i�����iiiu' ■ ■■■■■■■■ENtorium: �' i��i��■■■mow■■■�■■■o �iiioaim■iai �iiii. ii■i n/a yes NEE A building permit may be required by: C e'f='fi "`-�Y 7aw� D�u-4"'tE] See note on back regarding River Basin rules. ( Note Local Planning jurisdiction) , \ ,} r ,� h Notes/ Special Conditions�N %R:� �(Q ✓ t �/ o rt. I `1 n r�fu.✓�J J't"7�-r ci --�'� 4% Agent or Applicant Printed Name J de-7— -?� � Permit0fficers Printed Name Signature "Please read compliance statement onbackofpermit" Application Fee(s) Check # Signature Issuing Date Expiration Date ■ Applicant: lU C S T G 6% Al ej Date: 7 , ) -f = if — Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat coda sheet Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or tem im acts FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount Dredge ❑ Fill ❑ Both Other ❑ O o �� D N fk Dredge El Fill❑ Both ["Other ❑ `��� Soo Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ RECEIVED APR 0 7 ilri H} mhANt) c-`fhi 252-808-2808 :: 1-888-4RCOAST :: www.necoastalmanagemoni.net revised:02115/10 M WI wwuanornr Meier Development Permit (last revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Department Of Transportation Project Name (if applicable) US 70 Pipe Replacement - WBS#: 2B.101611 Applicant 1: First Name Jay MI B. last Name Johnson Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box 1587 City Greenville State NC ZIP 278351587 Country USA Phone No. 252 - 439 - 2800 ext. FAX No. 252 - 830 - 3341 Street Address (d diffenent fnurn above) City State ZIP Email jbjohnson@ncdot.gov 2. Agent/Contractor►nformation RECEI Business Name APR 0 7 Agentl Contractor 1: First Name MI Last Name Agentl Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP Phone No. 1 - - ext. Phone No. 2 - - md. FAX No. Contractor # Street Address (if different from above) City State ZIP Email RE <Form continues on back> ED 7015 EIVED 3 2015 Dgl'"=r- EITi+ 252-808-2808 :: 1-888.4RCOAST :: www.nccoastalmanagement.not Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret US 70 Subdivision Name City State Zip Phone No. Lot No.(s) (if many, attach additional page with fist) - - ext. I I, a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Drainage Ditch c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ❑Natural ®Manmade []Unknown North River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes ®No work falls within. 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.fL) 20' N/A c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water leveq (If many lot sizes, please attach additional page with a list) 3' ❑NHW or ®NWL e. Vegetation on tract Maintained Grasses f. Man-made features and uses now on tract Asphalt Road g. Identify and describe the existing land uses adiacent to the proposed project site. Residential Property h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? N/A (Attach zoning compliance certificate, if applicable) ❑Yes []No ®NA J. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No R k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes []No ®NA MAR If yes, by whom? h+ I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ❑No ®NA National Register listed or eligible property? <Fotm continues on next page> ::EIVED 23 2015 W4D CITY 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.not Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Addidonal /nfonnation In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application► package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name David Brent Smith Phone No. Address 2502 Lennoxville Rd, Beaufort NC 28516 Name Todd S 8 Katherine A Greiss, etux Phone No. Address 238 Hoffedker Rd, Phoenixville PA 19460 Name Dallas Preston Willis Jr Phone No. Address P.O.Box 281, Beaufort NC 28516 g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, pennittee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. 1. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10). if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Cerfcation and Permission to Enter on Land I I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. 1 certify that I am authorized to grant, and do in fad grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date March 3, 2015 Print Name Jay B. Johnson Signature Please indicate application attachments pertaining to your proposed projikt. ❑DCM MP-2 Excavation and Fill Information ®DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ❑DCM MP-4 Structures Information RECEIVED APR 0 7 2015 i�aNa'+w�i�r wain,*. RECEIVED MAR 2 3 20b ry�WA A'M�lsal bll-'� 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. @ Are there wetlands on the site? ®Yes []No (ii) Are there coastal wetlands on the site? ®Yes [No (H)i If yes to either () or (ii) above, has a delineation been conducted? ®Yes []No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. WA o. Describe existing drinking water supply source. N/A p. Describe existing storm water management or treatment systems. WA 5. Activities and Impacts a. Will the project be for commercial, public, or private use? []Commercial ®PubliclGovemment ❑PrivatetCommunity b. Give a brief description of purpose, use, and daily operations of the project when complete. The existing 52' long 42" RCP will be replaced by a proposed 5Z long 42" CAAP. The proposed pipe will keep the roadway from collapsing, thus preventing possible injury and death. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Typical roadway construction equipment will be used, including but not limited to tracked excavators, dump trucks, flat-bed trucks, back -hoes and boom trucks. d. List all development activities you propose. Pipe Replacement e. Are the proposed activities maintenance of an existing project, new work, or both? Maintenance f. What is the approximate total disturbed land area resulting from the proposed project? 600 ®Sq.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ❑No ®NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. N/A I. Will wastewater or stomr water be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA RECEI If yes, attach a mitigation proposal. MAR 2 3 2015 <Fortn continues on back> paw 252-808-2808 :: 1.888-4RCOAST :: www.nccoastalmanagement.net Pore 9CY YM BRIDGES and CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. BRIDGES ®This section not applicable a. Is the proposed bridge: b. Water body to be crossed by bridge: OCommercial ❑Public/Government ❑Private/Community c. Type of bridge (construction material): e. (i)Will proposed bridge replace an existing bridge? OYes ONo If yes, (ii) Length of existing bridge: (fii) Width of existing bridge: (iv) Navigation clearance underneath existing bridge: (v) Will all, or a part of, the existing bridge be removed? (Explain) d. Water depth at the proposed crossing at NLW or NWL: f. (i) Will proposed bridge replace an existing culvert? OYes ONo If yes, (ii) Length of existing culvert: (iii) Width of existing culvert: (iv) Height of the top of the existing culvert above the NHW or NWL: (v) Will all, or a part of, the existing culvert be removed? (Explain) 9• Length of proposed bridge: h• Width of proposed bridge: 1. Will the proposed bridge affect existing water flow? []Yes ONo j. Will the proposed bridge affect navigation by reducing or If yes, explain: increasing the existing navigable opening? LJYes ONo If yes, explain: k. Navigation clearance underneath proposed bridge: I. Have you contacted the U.S. Coast Guard concerning their approval? OYes ONo If yes, explain: m. Will the proposed bridge cross wetlands containing no navigable n. Height of proposed bridge above webvm_ RECEIVED waters? OYes ONo If yes, explain: APR 0 7 yn'; MAR 2 3 2015 N`�:kAliN4 tit? 2. CULVERTS ❑This section not applicable a• Number of culverts proposed: 1 b. Water body in which the culvert is to be placed: Drainage Ditch < Form continues on back 252-808-2808 :: 1-888.4RCOAST :: www.nccoastalmananement.net revised: 10/26/06 Form DCM MP-5 (Bridges and Culverts, Page 2 of 4) c. Type of culvert (construction material): CAAP d. (i) Will proposed culvert replace an existing bridge? 0Yes ®No If yes, (ii) Length of existing bridge: (Ili) Width of existing bridge: (iv) Navigation clearance underneath existing bridge: _ (v) Will all, or a part of, the existing bridge be removed? (Explain) f• Length of proposed culvert: 52' h. Height of the top of the proposed culvert above the NHW or NWL. 1' j. Will the proposed culvert affect navigation by reducing or Increasing the existing navigable opening? E]Yes ®No If yes, explain: e. (1) Will proposed culvert replace an existing culvert? ®Yes []No If yes, (i) Length of existing culvert(s): 52' (III) Width of existing cutvert(s): 42" (iv) Height of the top of the existing culvert above the NHW or NWL: 1' (v) Will all, or a part of, the existing culvert be removed? (Explain) All of the existing culvert will be replaced. 9• Width of proposed culvert: 42" I. Depth of culvert to be buried below existing bottom contour. 1' k. Will the proposed culvert affect existing water flow? (]Yes ®No If yes, explain: 3. EXCAVATION and FILL ❑This section not applicable a. (i) Will the placement of the proposed bridge or culvert require any excavation below the NHW or NWL? ®Yes ❑No If yes, () Avg. length of area to be excavated: 5' on each end (ii) Avg. width of area to be excavated: 10' (iv) Avg. depth of area to be excavated: V (v) Amount of material to be excavated in cubic yards: 3_7 b. (i) Will the placement of the proposed bridge or culvert require any excavation within coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. OCW OSAV 0S13 [1WL ®None (i) Describe the purpose of the excavation in these areas: a (i) Will the placement of the proposed bridge or culvert require any high -ground excavation? ®Yes ❑No If yes, (ii) Avg. length of area to be excavated: 50' (ii) Avg. width of area to be excavated: 10' RECEIVED (iv) Avg. depth of area to be excavated: 1' 1�15 (v) Amount of material to be excavated in cubic yards: 18.5 BAR 2 fie. PITY 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanogement.net revised: 10/26/06 Form DCM MP-5 (Bridges and Culverts, Page 3 of 4) d. If the placement of the bridge or culvert involves any excavation, please complete the following: (i) Location of the spoil disposal area: Excavated material will be reused on site, any left over will be taken back to maintenance area. (ii) Dimensions of the spoil disposal area: N/A (iii) Do you claim title to the disposal area? ®Yes []No (If no, attach a letter granting permission from the owner.) (iv) Will the disposal area be available for future maintenance? ❑Yes ®No (v) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAVs), other wetlands (WL), or shell bottom (SB)? ❑CW ❑SAV OWL ❑SB ®None If any boxes are checked, give dimensions if different from (ii) above. (vi) Does the disposal area include any area below the NHW or NWL? ? ❑Yes ®No If yes, give dimensions if different from (ii) above. e. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed below NHW or NWL? ❑Yes ®No If yes, (ii) Avg. length of area to be filled: (iii) Avg. width of area to be filled: (N) Purpose of fill: (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed within coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? if any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (i7 Describe the purpose of the excavation in these areas: g. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed on high -ground? ❑Yes ®No If yes, (ii) Avg. length of area to be filled: (iii) Avg. width of area to be filled: RECEIVED (iv) Purpose of fill: APR 0 7 2015 MtN-MHD CITY a. Will the proposed project require the relocation of any existing b. Will the proposed project require the construction of any temporary utility lines? ❑Yes ®No detour structures? ❑Yes ®No If yes, explain: If yes, explain: If this portion of the proposed project has already received RECEIVED approval from local authorities, please attach a copy of the approval or certification. MAR 2 3 2015 < Form continues on bacic> D�A4-R"�' t�l+ 252-808.2808 :: 1-888.4RCOAST :: www.nccoastalmonagement.net revised: 10/26/06 Form OCM MP-5 (Bridges and Culverts, Page 4 of 4) c. Will the proposed project require any work channels? ❑Yes ®No if yes, complete Form DCM-MP-2. d. How will excavated or fill material be kept on site and erosion controlled? Use BMP's e. What type of construction equipment will be used (for example, f. Will wetlands be crossed in transporting equipment to project site? dragline, backhoe, or hydraulic dredge)? ❑Yes ®No Typical roadway construction equipment will be used, If yes, explain steps that will be taken to avoid or minimize including but not limited to tracked excavators, dump environmental impacts. trucks, flat-bed trucks, back -hoes and boom trucks. g. Will the placement of the proposed bridge or advert require any shoreline stabilization? ❑Yes ®No !f yes, complete form MP-2, Section 3 for Shoreline Stabilization only. March 3, 2015 Date US 70 Pipe Replacement Project Name Jay B. Johnson Applicant Name 06� Applicant Signatu f i RECEIVED MAR 2 8 10b 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalman2nement.net revised: 10/26/06 Pipe Pipe Replacement US 70 Replacement US 70 — OVER DRAINAGE DITCH CORE CREEK USGS QUAD MAP BOGUE-CORE SOUNDS 03020106 NORTH RIVER SA; HQW WHITE OAK RIVER BASIN ii WBS ELEMENT NUMBER 2B.101611 MARCH 3, 2015 r� 1n9�a� Ftd . 1 d Cow �� _ •Q - �— .� ,�- -'%'.. ' to a of Farm " "SR123 �► S - 41 r Neptune L Pipe Replacement g N 34.759474 W 76.630440 ,� _a u rise Dr =_ o _ 4�. - - .: - Marsh He" Pant . `vx � 4-•per _�. = .0 � u I XB 1 ,Rir c sRr % 2,000 1,000 0 2,000 Feet RECEIVED MAR 2 3 1015 aofw-MA,q" �.r, Pipe Replacement \n9ram Rd ,d Co`N t-n SR14�a66 Taylor Farm Rd 4a Rd 0 U 2 2,000 1,000 0 2,000 Feet SR1238 Neptune Ln SR1466 Jy I 0 D Cedar Pipe Replacement US 70 US 70 OVER DRAINAGE DITCH CORE CREEK USGS QUAD MAP BOGUE-CORE SOUNDS 03020106 NORTH RIVER SA; HQW WHITE OAK RIVER BASIN WBS ELEMENT NUMBER 2B.101611 MARCH 3, 2015 Dr unrise Dr Dr nr30' q Rd 17No 0 w S\4jRy N � Pipe Replacement N 34.759474 W 76.630440 RECEIVED APR 07 RECEIVED MAR 2 3 2015 DCtut-► HD CITY UNITED STATES POSTAL SERVICE First -Class Mail Postage & Fees Paid USPS Permit No. G-10 • Sender: Please print your name, address, and ZIP+4® in this box• NC Department of Transportation Division of Highway po,tvx 7 Greenville NC 27835 :4 • Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. • Print your name and address on the reverse so that we can return the card to you. • Attach this card to the back of the mailpieCe, or on the front if space permits. 1. Article Addressed to: 1)ClLO;d BrC04 3/rl`7:'A a 6-0 a I-Clle) DEC 0', Ile h/ a e- au. �v /t)C 128 1� A. Signature X A4 0 Agent 13 Addressee B. —4LivrMy (Printej;rName) C. Date Delivery D. Is delivery address different from item I? Uyes If YES, enter delivery address below: 13 No 3. Service Type 1% Certified Mail® 13 Priority Mail Express'" 13 Registered E3 Return Receipt for Merchandise 13 Insured Mail E3 Collect on Delivery 4. Restricted Delivery? (Extra Fee) 13 Yes 2. Article Number 7013, 109GAM 1009; 51305 (Transfer-.'froffi r 'ab.el ) . sp y1ce -1 : PS Form 3811, July 2013 Domestic Returni Receipt UNITED STATE First -Class Mail VA 291Postage &Fees Paid USPS Permit No. G-10 • Sender: Please print your name, address, and ZIP+4® in this box* NC Department of Transportation Division of Highway PO Box i-587 Greenville NC 27835 IIII?II!1111I)IIIile111+1f IIII'sII&I 21 ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: TDd d .s �-k G Aer./t' a A- Gre tZ eky p / P h D e l.,v- 11 e, {844. 19 4,0 A. SignA(ure X ❑ (�� ❑_Agent Addressee B. Received by (Printed Name) C. Date of Delivery D. Is delivery address different from item 1? ❑ Yes If YES, enter delivery address below: ❑ No 3. Service Type OUCertified Mail® ❑ Priority Mail Express- ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ Collect on Delivery 4. Restricted Delivery? (Extra Fee) ❑ Yes z. Article Number 7013 1090 0001 1009 6750 (transfer from service /abeq : PS Form 3811, July 2013 Domestic Return Receipt UNITED STATES POSTAL SERVICE First -Class Mail Postage & Fees Paid USPS Permit No. G-10 • Sender: Please print your name, address, and ZIP+4® in this box" NC Department of Transportation Division of Highway PO Box 1587 Greenville NC 27835 1'1111111"1111111111,1i11111,ISi:1fill 1111111,I'I ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. tdt 11. Article Addressed to: 13 C' IF a u �o#1111 NGfS/� A. zv;�� XJV-a B. Received by (Printed Na e) C. Date f Delivery o r� l is /� D. Is delivery address different from item 1? © Yes If YES, enter delivery address below: ❑ No 3. Service Type I .Certified Mail® ❑ Priority Mail Express- © Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ Collect on Delivery 4. Restricted Delivery? (Extra Fee) E3 Yes 2. (rtnsferfrom e 7013 1090 0001 1009 6743 (transfer from service label) PS Form 3811, July 2013 Domestic Return Receipt CERTIFIED MAIL RETURN RECEIPT REQUESTED March 3, 2015 Dallas Preston Willis Jr To Whom It May Concern: This correspondence is to notify you as an adjacent riparian landowner that the North Carolina Department of Transportation has determined that the existing 52' long 42" Reinforced Concrete Pipe crossing US 70 at a drainage ditch adjacent to Sunrise Drive is up for replacement. North Carolina Department of Transportation plans to remove the existing pipes and replace with a 52' long 42" Corrugated Aluminum Alloy Pipe. Should you have objections to the proposed construction, please check the appropriate statement below, sign, date, and return as soon as possible to: Mr. Stephen Lane, Field Representative N.C. Dept. of Environment and Natural Resources Division of Coastal Management Morehead City District 400 Commerce Avenue Morehead City, City N.C. 28557 Written comments must be received by the Division of Coastal Management within 10 days of receipt of this notice. NO RESPONSE WITHIN 10 DAYS of receipt of the correspondence will be INTERPRETED AS NO OBJECTION. Sincerely, 1� I have no objection to the proposed project as described in this correspondence. I have objection to the project as presently proposed and have enclosed comments. (Signature) (Date) RECEIVED APR 0 7 2n, RECEIVED MAR .13 1015 " " -140 R. fW! "t* .-d....► Alif HCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor March 26, 2015 NCDOT. Attn: Jay Johnson P.O. Box 1587 Greenville, N.C. 27835 Dear Sir or Madam: Donald R. van der Vaart Secretary Attached is General Permit #67484 to construct a 42" X 52' culvert to replace the existing culvert at US70, approximately 20' west of Sunrise Drive, Beaufort, North Carolina. In order to validate this permit, please sign the permit as indicated. Retain the white copy for your files and return the signed yellow and pink copies to us in the enclosed, self-addressed envelope. If the signed permit copies are not returned to this office before the initiation of development, you will be working without authorization and will be subject to a Notice of Violation and subsequent civil penalties. We appreciate your early attention to this matter. Sincerely, 4 Stephen Lane Coastal Management Representative SL/rcb Enclosures RECEIVED APR 0 7 2015 ( A"("r!:"R!7rraeat'wax 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX 252-247-3330 \ Internet: www.nccoastalmanagement.net An Equal Opportunity / Affirmative Action Employer