HomeMy WebLinkAboutNCDOT - 61084CORW:..(y9/ no, PNA
Type of Project/ Activity_
yes /, no Crit'.Hab. _ yes / no ;
Closest Maj. Wtr. Body
cor
- if �.. ♦; �;,: J�.r 1. ✓_i v_s.t �. i
Pier (dock) length b
Platform(s)
1 i I I
Finger pier(s)
Groin length
number
Bulkhead/.Riprap length
ayg distance offshore {.
niax distance offshore
Basin, channel
cubic yards
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
(Scale: Ntl
SAV: not sure yes CO),
� I I I i � I �. I• I
Sandbags: not sure yes nro�
Moratorium: n/a yes Ta I
Photos: yes
Waiver Attached: yes
A building permit may be required by:r�^ rr`./ ❑ See note. on back regarding River Basin rules.
n'c/ J���'i 1 it^v.n r • r ` , r 'lr., r l,.�:
,Notes/ Special Conditions t
� ��...r' .% `:/�/�;/�._ (' w �rt � r �..�.�� r-...t f�4,r .. f"y is / ,�f"}•� r ff y;,..n /, e,+ r f
-7777
a
Agent or Applicant Printed Name Permit Officer's Signature
Signature``t�`Pleasgfeadcompliancestatement onback ofpermit Issuing Date Expiration Dat
yl'j� j.k I`s r
J%r
}
Application Fee(s) Check # Local Planning Jurisdiction Rover File Name.
a
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowners).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythatthis project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar- Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-648 [)or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office
Morehead City Headquarters
Mailing Address:
400 Commerce Ave
1638 Mail Service Center
Morehead City, NC 28557
Raleigh, NC 27699-1638
252-808-2808/ 1-888ARCOAST
Location:
Fax: 252-247-3330
2728 Capital Blvd.
(Serves: Carteret, Craven, Onslow -above
Raleigh, NC 27604
New River Inlet- and Pamlico Counties)
919-733-2293
Fax:919-733-1495
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481 _
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax:910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
• EtAAIVIA / i!?6REDGE & FILL NO. 61084
" ffew N E RAL PERMIT Previous permit #
❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC i' ~7 0 Q
A'pphcant Name'' Nw Project Location: County r "� c
p ,
Street Address/ State Road/ Lot #(s) yu f ?O /
t +" e •�f �J % cif 41 co Jr
G11 0� VIX �• n*_
City Statd %�: ZIP ���� a,s•Xt►K Y 3,3 W
zoo
Phone43q. Fax ~ 331 Subdivision %VIA
Authorized Agent r, 4Yx o �h � { I ` ,, City .PAV I rl I V G ZIP � '1`�
Affected ok
❑ Cw ❑ EW 19'1('TA ❑ ES iO4*S Phone # ( ) River Basin
"❑ OEA4 ❑ HHF ,❑ IH ❑ UBA ❑ N/A 40 T. rre_ 4" Yea
AEC(s):❑ PWS: ❑ FC: , Adj. Wtr. Body y nat ma unkn
-
ORW: ye '/ no PNA yes / no Crit.Hab. yes / no Closest Maj. Wtr. Body �O re- „
Type of Project/ Activity 6 J4rµc. 6 D" J1' 6 �-' cvri+ c c
Piatf
Fing
Groi
Bulk
Basl
Boat
Boat
Beac
Oth
';Shor.
SAV
;Sand
�Mo
iPhot
?Waive
(Scale: IV114
0=0
MEN
length
number
MOM
ME
IIIERME
—E
IN
MEN
00
M
NNE
Emmons
0
0
EMEMENNE
M
16WE'S
EMMEMEN
ME
mmm
0
ME
M
MEMEENNEME
MEMO
ON
M
MEMMENNEME
cubic yards
MIMEMI
ram
MONEMEE
M
MEN
I
E.....
OMEN
M
MEN
M
III
ME
Bulldozing
MINN
ON
00
IMME
0
MEMO
OEM
I
IMENNE
NNE
ME
I
A
a�
A building permit maybexequired by-: ❑ See note on back regarding River Basin rules.
Notes/ Special Conditions (D, •r 41 J�- _A . cz /nf AiM Hw, t Zt� b �6`^' nor'--,
f'�'/ r• 1K.( p�e,,ic•i-ton. ,?,,,-LI Pk c,,, )wt taut o4kr,�.c,.�ur��,-�.II h� rw�rlLr+z..�iaa¢
iN a.cc.r,Qa�c*t y�I ¢ M, . r.
gnature','*Pleasereadcompliancestatementonbackofpermit ,
Issuing Date.
pplication Pees}
Check #/
Local Planning jurisdiction
r
AZA4jL*)
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Pat McCrory Braxton C. Davis
Governor Director
I
May 16, 2013
NCDOT
Attn: Jay Johnson
P.O. Box '1587
Greenville, N.C. 27835-1587
Dear Sir or Madam:
John E. Skvarla, III
Secretary
Attached is General Permit # 61084 to construct a 60" 'X 62' culvert to replace a failing culvert at US 70,
approximately 2300' west of Davis Lane, Davis, North Carolina.
In order to validate this permit, please sign the permit as indicated. Retain the white copy for your files and
return the signed yellow and pink copies to us in the enclosed, self-addressed envelope. If the signed permit
copies are not returned to this office before the initiation of development, youwill be working without
authorization and will be subject to a Notice of Violation and subsequent civil penalties.
We appreciate your early attention to this matter.
Sincerely,
Stephen Lane
Coastal Management Representative
SL/rcb
Enclosures
400 Commerce Ave., Morehead City, NC 28557
Phone: 252-808-28081 FAX: 252-247-3330 Internet: www..nccoastalmanagement.net
An Equal Opportunity %Affirmative Action Employer
Applicant:
��paT GAG o��F
Date:
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts)
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount
�✓�
Dredge [" Fill [Both [Other ❑
' be'
I D d'
l� lu
Dred e Fill _/
g [[("[�eoth [,y Other ❑
J—O
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Othe7E]
252-308-2803 :: 1-B234RCDAST :: revised: 02115/10
Ben UP-1
APPLICATION for
Major Development Permit
(last revised 12/27/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicand Landowner Information
Business Name
Department Of Transportation
Project Name (if applicable)
Emergency Pipe Replacement US 70 WBS# 2B.102511
Applicant 1: First Name
Jay
MI
B
Last Name
Johnson
Applicant 2: First Name
MI
Last Name
ff additional applicants, please attach an additional page(s) with names listed.
Mailing Address
PO Box
1587
City
Greenville
State
NC
ZIP
278351587
Country
USA
Phone No.
252 - 439 - 2800 ext.
FAX No.
252 - 830 - 3341
Street Address (lf different from above)
City
State
ZIP
Email
jbjohnson@ncdot.gov
2. Agent(Contractor Information
Business Name
Agent/ Contractor 1: First Name
MI
Last Name
Agent/ Contractor 2: First Name
MI
Last Name
Mailing Address
PO Box
City
State
ZIP
Phone No. 1
- ext.
Phone No. 2
- ext.
FAX No.
Contractor #
Street Address (lf different from above)
City
State
ZIP
Email
<Form continues on baclo MAY 15 2013
252-808-2808 .. 1-888-4RCOAST .: www.nccoastal managoment.ncDCA1.yMCffy
f
Form DCM MP-1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple)
Street Address
State Rd. #
Carteret
US 70
Subdivision Name
City
State
Zip
Phone No.
Lot No.(s) (if many, attach additional page with list)
- - ext.
, I , ,
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
White Oak
Jarrett Bay
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural []Manmade []Unknown
Jarrett Bay
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
[]Yes ®No
work falls within.
4. Site Description
a. Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
18,
558
c. Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
NW L (normal water level)
(If many lot sizes, please attach additional page with a list)
1' ❑ NHW or ®NW L
e. Vegetation on tract
Coastal Marsh
f. Man-made features and uses now on tract
US 70
g. Identify and describe the existing land uses adjacent to the proposed project site.
Coastal Marsh
h. How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
N/A
(Attach zoning compliance certificate, if applicable)
❑Yes []No ®NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes []No ®NA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes []No ®NA
National Register listed or eligible property?
<Form continues on next page> RECEIVED
MAY 15 2013
252-808-2808 :: 1-888-4RCOAST :: www.nccoastal management.not
DCM MHD CITY
Form DCM MP-1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? ❑Yes ®No
(ii) Are there coastal wetlands on the site? ❑Yes ®No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? []Yes ❑No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
N/A
o. Describe existing drinking water supply source.
N/A
p. Describe existing storm water management or treatment systems.
N/A
5. Activities and Impacts
a. Will the project be for commercial, public, or private use?
[]Commercial ®Public/Government
❑Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
The existing 48" x 62' corrugated metal pipe is failing and will be replaced with a proposed 60" x 62' corrugated metal pipe.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Typical roadway construction equipment will be used, including but not limited to tracked excavators, dump trucks, flat-bed
trucks, back -hoes and boom trucks.
d. List all development activities you propose.
Pipe Replacement
e. Are the proposed activities maintenance of an existing project, new work, or both?
Maintenance
f. What is the approximate total disturbed land area resulting from the proposed project?
558 ®Sq.Ft or ❑Acres
g. Will the proposed project encroach on any public easement, public accessway or other area
®Yes ❑ No ❑NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
N/A
I. Will wastewater or stormwater be discharged into a wetland?
❑Yes ❑No ®NA
If yes, will this discharged water be of the same salinity as the receiving water?
[]Yes ❑No ❑NA
j. Is there any mitigation proposed?
❑Yes ®No ❑NA
If yes, attach a mitigation proposal.
<Form continues on back>
RECEIVED
MAY 15 2013
252-808-2808 :: 1-888-4RCOA5T :. www.nccoastal management MHDCY
Form DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additional Information
In addition to this completed application form, (UP-1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (i) are ahvays applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items -below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the
proposed project is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name George L. Wainwright Jr. et al Phone No.
Address 5206 Driftwood Ln. Morehead City NC 28557
Name Phone No.
Address
Name Phone No,
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and Issuing dates.
h. Signed consultant or agent authorization form, if applicable.
I. Welland delineation, If necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Ad.
1 7. Cerfirication and Permission to Enter on Land l
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date May 10, 2013 Print Name Jay B. Johnson
Signature l
Please indicate application attachments pertaining to your prop d project.
®DCM MP-2 Excavation and Fill Information ®DCM MP-5 Bridges and Culverts
❑DCM MP-3 Upland Development
❑DCM MP-4 Structures Information RECEIVED
MAY 15 2013
262-600-2606 .. 1-088.411COAST :. www.nccoastalmonagemoEjlo1� CITY
Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
Access
Other
Channel
Canal
Boat Basin
Boat Ramp
Rock Groin
Rock
(excluding
(NLW or
Breakwater
shoreline
NWL)
stabilization
Length
Width
Avg. Existing
NA
NA
Depth
Final Project
NA
NA
Depth
1.: EXCAVATION ® This section not applicable
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated.
cubic yards.
c. (i) Does the area to be excavated include coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (W L)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL []None
(ii) Describe the purpose of the excavation in these areas:
d. High -ground excavation in cubic yards.
2. 'DISPOSAL OF EXCAVATED MATERIAL ® This section not applicable
a. Location of disposal area. b. Dimensions of disposal area.
c. (i) Do you claim title to disposal area?
[]Yes ❑No ❑NA
(ii) If no, attach a letter granting permission from the owner.
e. (i) Does the disposal area include any coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (W L)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
❑WL []None
(ii) Describe the purpose of disposal in these areas:
d. (i) W ill a disposal area be available for future maintenance?
❑Yes LJNo ❑NA
(ii) If yes, where?
f. (i) Does the disposal include any area in the water?
[]Yes []No ❑NA
(ii) If yes, how much water area is affected?
RECEIVED
MAY 15 2013
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimana-ement.net D U * 12/26/06
t: orili DCM NIP-2 (Excavation and Fill, Pago 2 of 2)
3. SHORELINE STABILIZATION ❑This section not applicable
(if development is a wood groin, use MP-4 — Structures)
a. Type of snoreiine stabilization: b. Length: 6ZZ'
❑Bulkhead ®Riprap ❑Breakwater/Sill ❑Other. Width: 9'
c. Average distance waterward of NHW or NWL: 6' NWL d. Maximum distance waterward of NHW or NWL: 10' NWL
e. Type of stabilization material:
Marl or Granite MpRap
g. Number of square feet of fill to be placed below water level.
Bulkhead barkfill Riprap 108
Breakwater/Sill Other
1. Source of fill material.
f. (i) Has there been shoreline erosion during preceding 12
months?
❑Yes ❑No ®NA
(i) If yes, state amount of erosion and source of erosion amount
information.
h. Type of fill material.
Sand
4. OTHER FILL ACTIVITIES ®This section not applicable
(Excluding Shoreline Stabilization)
a. () Will fill material be brought to the site? []Yes []No []NA b. (i) Will fill material be placed in coastal wetiandshnarsh (CW).
If yes,
(ii) Amount of material to be placed in the water
(ii) Dimensions of fill area
(iv) Purpose of fill
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL []None
(ii) Describe the purpose of the fill in these areas:
5. GENERAL
a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline,
controlled? backhoe, or hydraulic dredge)?
NCDOT BMP's Backhoe, Dump Trucks, Excavator
c. (i) Will navigational aids be required as a result of the project?
❑Yes ®No ❑NA
(ii) If yes, explain what type and how they will be implemented.
d. (i) Will wetlands be crossed in transporting equipment to project
site? ❑Yes ®No ❑NA
(i) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
May 10, 2013 Jay B. Johnson
Date
Emergency Pipe Replacement US 70
Project Name
Applicant N
2
Applicant S" tur RECENED
MAY 15 2013
252-608-2800 :: 1-088-4;'4CQA5T :: m tw.nccoq .tatman3_gvmr rtt.not DCNI-MHD 'it*': 12J2ea OEM
FormocMMr-s
BRIDGES and CULVERTS
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
f. BRIDGES ® This section not applicable
a. Is the proposed bridge:
❑Commercial ❑Public/Government ❑Private/Community
c. Type of bridge (construction material):
e. (i) Will proposed bridge replace an existing bridge? ❑Yes ❑No
If yes,
(ii) Length of existing bridge:
(iii) Width of existing bridge:
(iv) Navigation clearance underneath existing bridge:
(v) Will all, or a part of, the existing bridge be removed?
(Explain)
g. Length of proposed bridge:
i. Will the proposed bridge affect existing water flow? ❑Yes ❑No
If yes, explain:
k. Navigation clearance underneath proposed bridge:
b. Water body to be crossed by bridge:
d. Water depth at the proposed crossing at NLW or NWL:
f. (i) Will proposed bridge replace an existing culvert? ❑Yes ❑No
If yes,
(ii) Length of existing culvert:
(iii) Width of existing culvert:
(iv) Height of the top of the existing culvert above the NHW or
NW L-
(v) Will all, or a part of, the existing culvert be removed?
(Explain)
h. Width of proposed bridge:
j. Will the proposed bridge affect navigation by reducing or
increasing the existing navigable opening? LJYes ❑No
If yes, explain:
I. Have you contacted the U.S. Coast Guard concerning their
approval? ❑Yes []No
If yes, explain:
m. Will the proposed bridge cross wetlands containing no navigable n. Height of proposed bridge above wetlands:
waters? ❑Yes ❑No
If yes, explain:
2. CULVERTS [I This section not applicable
a. Number of culverts proposed: 1
b. Water body in which the culvert is to be placed:
Unamed Tributary of Jarrett Bay
< Form continues on back>
RECEIVED
MAY 15 2013
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmananement.net
revised: 10/26/06
DCM-MAD CrM
Form DCM MP-5 (Bridges and Culverts, Page 2 of 4)
c. Type of culvert (construction material):
Corrugated Metal
d. (i) Will proposed culvert replace an existing bridge? e. (i) Will proposed culvert replace an existing culvert?
❑Yes ®No ®Yes ❑No
If yes,
(ii) Length of existing bridge:
(iii) Width of existing bridge:
(iv) Navigation clearance underneath existing bridge: _
(v) Will all, or a part of, the existing bridge be removed?
(Explain)
f. Length of proposed culvert: 62'
h. Height of the top of the proposed culvert above the NHW or NW L.
1'
j. Will the proposed culvert affect navigation by reduci�ngg or
increasing the existing navigable opening? E Yes ®No
If yes, explain:
If yes,
(ii) Length of existing culvert(s): 62'
(iii) Width of existing culvert(s): 48"
(iv) Height of the top of the existing culvert above the NHW or
NW L• 1'
(v) Will all, or a part of, the existing culvert be removed?
(Explain) All of the culvert will be removed and
replaced with a 62' x 60" Corrugated Metal Pipe.
g. Width of proposed culvert: 60"
I. Depth of culvert to be buried below existing bottom contour.
1'
k. Will the proposed culvert affect existing water flow?
[]Yes ®No
If yes, explain:
3. EXCAVATION and FILL ; ❑ This section not applicable
a. (i) Will the placement of the proposed bridge or culvert require any
excavation below the NHW or NW L? ®Yes ❑No
If yes,
(ii) Avg. length of area to be excavated: 12'
(iii) Avg. width of area to be excavated: 9'
(iv) Avg. depth of area to be excavated: 1'
(v) Amount of material to be excavated in cubic yards: 4
b. (i) Will the placement of the proposed bridge or culvert require any
excavation within coastal wetlands/marsh (CW), submerged
aquatic vegetation (SAV), shell bottom (SB), or other wetlands
(W L)? If any boxes are checked, provide the number of square
feet affected.
❑CW ❑SAV ❑SB
OWL ®None
(ii) Describe the purpose of the excavation in these areas:
c. (i) Will the placement of the proposed bridge or culvert require any
high -ground excavation? ®Yes []No
If yes,
(ii) Avg. length of area to be excavated: 12'
(iii) Avg. width of area to be excavated: 9'
(iv) Avg. depth of area to be excavated: 1' RECEIVED
(v) Amount of material to be excavated in cubic yards: 4
MAY 15 2013
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanaaement.net reviseif:10/26/06
. Form DCM MP-5 (Bridges and Culverts, Page 3 of 4)
d. If the placement of the bridge or culvert involves any excavation, please complete the following:
(i) Location of the spoil disposal area: Excavated material will be reused on sites, any left over will be taken back to maintenance
area.
(ii) Dimensions of the spoil disposal area: N/A
(iii) Do you claim title to the disposal area? ®Yes ❑No (If no, attach a letter granting permission from the owner.)
(iv) Will the disposal area be available for future maintenance? ❑Yes ENo
(v) Does the disposal area include any coastal wetlandstmarsh (CW), submerged aquatic vegetation (SAVs), other wetlands (WL), or shell
bottom (SB)?
❑CW ❑SAV ❑WL ❑SB ENone
If any boxes are checked, give dimensions if different from (ii) above.
(vi) Does the disposal area include any area below the NHW or NWL? ? ❑Yes ENo
If yes, give dimensions if different from (ii) above.
e. (i) Will the placement of the proposed bridge or culvert result in any
fill (other than excavated material described in Item d above) to
be placed below NHW or NWL? EYes LJNo
If yes,
(ii) Avg, length of area to be filled: 6'
(iii) Avg. width of area to be filled: 9'
(iv) Purpose of fill: RipRap at end of pipes
f. (i) Will the placement of the proposed bridge or culvert result in any
fill (other than excavated material described in Item d above) to
be placed within coastal wetlands/marsh (CW), submerged
aquatic vegetation (SAV), shell bottom (SB), or other wetlands
(W L)? If any boxes are checked, provide the number of square
feet affected.
❑CW ❑SAV ❑SB
❑WL ENone
(ii) Describe the purpose of the excavation in these areas:
g. (i) Will the placement of the proposed bridge or culvert result in any
fill (other than excavated material described in Item d above) to
be placed on high -ground? EYes ❑No
If yes,
(ii) Avg. length of area to be filled: 12'
(iii) Avg. width of area to be filled: 9'
(iv) Purpose of fill: 1'
a. Will the proposed project require the relocation of any existing b. Will the proposed project require the construction of any temporary
utility lines? []Yes ENo detour structures? Yes ENo
If yes, explain: If yes, explain:
If this portion of the proposed project has already received
approval from local authorities, please attach a copy of the
approval or certification.
RECEIVED
< Form continues on back>
MAY 15 2013
252-808-2808 :: 1-888-4RCOAST :: www.necoastaimanaaement.net DG1fiA$e11:CQ)96/06
11
Form VCM MP-5 (Bridges and Culverts, Page 4 of 4)
c. Will the proposed project require any work channels?
[]Yes ®No
If yes, complete Form DCM-MP-2.
d. How will excavated or fill material be kept on site and erosion
controlled?
Use BMP's
e. What type of construction equipment will be used (for example, f. Will wetlands be crossed In transporting equipment to project site?
dragline, badkhoe, or hydraulic dredge)? ❑Yes ®No
Typical roadway construction equipment will be used, if yes, explain steps that will be taken to avoid or minimize
including but not limited to tracked excavators, dump environmental impacts.
trucks, flat-bed trucks, back -hoes and boom trucks.
g. Will the placement of the proposed bridge or culvert require any
shoreline stabilization? ❑Yes ❑No
if yes, complete form MP-2, Section 3 for Shoreline
Stabilization only.
May 10, 2013
Date
Emergency Pipe Replacement US 70
Project Name
Jay B.Johnson
Applicant N e
Applipnt n re
RECEIVED
MAY 15 2013
DCM MHD CITY
252-808-2808 : 1-80&At`iCOAST :. www ncra stalm n-agg!ncAt,r Wt rvvizat3: 10i�26166
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
April 10, 2013
George L. Wainwright et al
To Whom It May Concern:
This correspondence is to notify you as an adjacent riparian landowner that the North Carolina Department of Transportation
has determined that the existing 62' long 48" Corrugated Metal Pipe crossing US 70 at an unamed tributary of Jarrett Bay is
failing. North Carolina Department of Transportation plans to remove the existing pipe and replace with 62' x 60" Corrugated
Metal Pipe.
Should you have objections to the proposed construction, please check the appropriate statement below, sign, date, and
return as soon as possible to:
Mr. Stephen Lane, Field Representative
N.C. Dept. of Environment and Natural Resources
Division of Coastal Management
Morehead City District
400 Commerce Avenue
Morehead City, City N.C. 28557
Written comments must be received by the Division of Coastal Management within 10 days of receipt of this notice.
NO RESPONSE WITHIN 10 DAYS of receipt of the correspondence will be INTERPRETED AS NO OBJECTION.
Sincerely,
I have no objection to the proposed project as described in this correspondence.
I have objection t the project as presently proposed and have enclosed comments.
(Signature)
'� (Date)
—a N . r �
CO
E" P. W-MIMM
f1J O o�
m 1
r�
0 Postage $
Er
Certified Fee £ ge e
r�ardk
Q Return Receipt Fee /9 P Here
� (Endorsement Required) a 55 �!
I= Restricted Delivery Fee 0 Q
(Endorsement Required) O 013
Qom' Total Postage & Fees s f . I
rL n, _
Sent To
r
� — .; � ore �--- I.(�AINrcJ�2/6f1T1
Street Apt No�J
or PO Box No. ^ -52Q-
�Q - ---a� =-'rxDODL
. ---^ ; -
c ty state. ztP+a ------- 0 0 ";4 LAD C! 7 Y, /VC a 955-7
v S 7c) �W DA,,z(-s
RECEIVED
MAY 15 2013
DC.M MHD CITY
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
April 10, 2013
George L. Wainwright et al
To Whom It May Concern:
This correspondence is to notify you as an adjacent riparian landowner that the North Carolina Department of Transportation
has determined that the existing 62' long 48" Corrugated Metal Pipe crossing US 70 at an unamed tributary of Jarrett Bay is
failing. North Carolina Department of Transportation plans to remove the existing pipe and replace with 62' x 60" Corrugated
Metal Pipe.
Should you have objections to the proposed construction, please check the appropriate statement below, sign, date, and
return as soon as possible to:
Mr. Stephen Lane, Field Representative
N.C. Dept. of Environment and Natural Resources
Division of Coastal Management
Morehead City District
400 Commerce Avenue
Morehead City, City N.C. 28557
Written comments must be received by the Division of Coastal Management within 10 days of receipt of this notice.
NO RESPONSE WITHIN 10 DAYS of receipt of the correspondence will be INTERPRETED AS NO OBJECTION.
Sincerely,
'�&b 914-4-41--
I have no objection to the proposed project as described in this correspondence.
I have objection to the project as presently proposed and have enclosed comments.
(Signature)
(Date) RECEIVED
MAY 15 2013
DCM-MxD CITY
� TncxrCfe.e
Bay
C/
rE�7E��C-
REPLACEMENTENCY PIPE
salve)
CARTERET COUNTY �;a. sound
U 5-70
Cape Lookout
National
Seashore
101
A
W
N
nt
nd
Cr
w
m
Morehead Freedom
City
Q�
Beaufort ' Park
41anbc
Beach
rr„e, C�rarne.r'H^"'�u
Fort Macon '
State Park
neck Sour>d
taakc���
-
-
-410-
Brev
�' '�
- ti
Bay
EMERGENCY PIPE
..•
REPLACEMENT
x
CARTERET COUNTY
US-70
Paint
ISland,
Point 4e
Qde
Faf The Spit
World
Goo e
C) Island
RECEIVED
MAY 15 2013
DCM-MffD Cffy
24770
WAINWRIGHT,GEORGE L.
JR ETAL
5206 DRIFTWOOD LANE
MOREHEAD CITY,NC 28557
DBKe1386,Pge76
PIPZ_ ��PL 14Cz /_M6-/VT
TURBIDITY
CURTAIN
------------------------------
72 SQ.FTe
, TinAl 11rrAI I A I a - r-r-% �9 nnnnncrn nln n n n
�— """ —� VI CIV YYHILI\ �
FLOW IMPACTS 8'
I I\VI VJLU I\II I\HI
I
-------------------
EXISTING: 1@48,I X62,ICORRUGATED
METAL PIPE
I I
PROPOSED: 1@60"X62' CORRUGATED
METAL PIPE
--------------------------
1.0 MILE SE TO SR-1363 --�
0
zC Cn CT 4'
EXIST R/W
EDGE OF CANAL
EXISTING SHLDR.
EDGE OF PVMNT.
CL/US-70
EDGE OF PVMNT.
EXISTING SHLDR.
TIDAL � OPEN WATER g ' /PROPOSED RIP —RAP
FLOW IMPACTSEDGE OF CANAL
--------------------------------------------------------------------- EXIST R/W
24770
TURBIDITY WAINWRIGHT,GEORGE L.
CURTAIN JR ETAL
5206 DRIFTWOOD LANE
MOREHEAD CITY,NC 28557
RECEIVED DBKe1386,Pgo76
MAY 15 2013
DUM-MfMCITY NOTE -.NOT TO SCALE
FOR PERMIT USE ONLY