HomeMy WebLinkAboutLeibel, Kevin & AnnV6
.........
�
LA
MA 0 DREDGE & FILL
lu
A B C D
GENERAL PERMIT Previous permit #
New ElModification El Complete Reissue ElPartial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern p rsuant to I SA NCAC
E] Rules attached,
11 1.4 Project Location: County
Applicant Name
Address 1 Street Address/ State , Road/.,Lot #(s)
Ci State /L21P -W
ty,
Phone # Subdivision
tt
E-Mail
Authorized Agent A"- C City ZIP
b;CW 'Illy "tC� TA DES 0 PTS Phone # River Basin
Affected
0 OEA CIHHF El 1H 0 UBA DK/A T 1(nat /man /un!on
AEC(s): Adj. Wtr. Body
--es Closest Maj. Wtr. Body
OIRW.
QY IPNA y,' no
Type of Project/ Activity -4 1
(Scale:
Pier (dock) lengtfr—fi]k ,
Fixed Platform(s) fr--,� X! !31 -lman
Floating Platform(s)—
Finger pler(s)---:�!�■■v■■
awMMA
Wmw
11111111111W■No
MA
Emomolmomomme■0
Emmmm
MMMME
0
■■■EO■■■■a■■■■
Groin length
number
Bulkhead/ Riprap length
avg distance offshore --
max distance offshore-_
Basin, channel -, -,,
NMI
a
0
MEN
MOMMENEEMEMMUME
IIIIIIIIHNI
■®®■■■■■.■■■1Cmaic■ir■■■■■■■■
l
I'll
1111i1■■■■■�■■■M
cubic yards
Boat ramp
a
MINSIONEEN
EMMEMMM
MEMMEEMEMEME
Boathouse/ Boatlifi'
MEMMENEMEMENS
■■■.
am
I
U■■■■■■
■■■■
111111101111111!m
a
MVIEM
Beach Bulldozing
•
%
MEMNWMMMM■OMEN
MEN
a
MEN■0
I
am
EUS
MEN
■...■....■.■■■■■■■■■Ilv.....'INN
INN
N
Im
No
MEN
Shoreline Length
SAV: not sure no
Moratorium: n/a yes % 10■
Photos: yes ')
r
%th�,prA-wr�Ad- Vpq I z tT-�V
NNE
No
No
0
MEN
W
11
NEON
■a
Now
mMOWIK1mmM1IKU
01111111111111
MEN
:a■
MENEM
M�
NEON
0
a
MENNEEM
OMEN
MOM
MEMO
0
OMEN
ME
A building permit may be required by:
E]See note on back regarding River Basin rules.
Note Local Planning jurisdiction)-\
Notes/ Sp9cial Conditions
A V J
le
1
rl,
(J
i 4..
.. ( t'.r
C
ent or Applicant Printed Name'
Si7ature Please read compliance statement on back of permit "
._) .,./.1
VA
Application Fee(s)
Check#
Permit Officer's Plied Name
Signature
Issuing Date Expiration Date .
I
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the- Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar- Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office (910-796-7215) for more information on how to complywith these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters
Washington District
400 Commerce Ave
943 Washington Square Mall
Morehead City, NC 28557
Washington, NC 27889
252-808-2808/ 1-888-411COAST
252-946-6481 -
Fax: 252-247-3330
Fax: 252-948-0478
(Serves: Carteret, Craven, Onslow -
(Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet- and Pamlico
Tyrrell and Washington Counties)
Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow - South of New River Inlet -
and Pender Counties)
http-//www.nccoastaimanagement.net/
Revised 08/27/ 14
` Eric Ellis
Marine Construction
• DOCKS _ SEAWALLS -BOAT LIFTS
DECKS & REPAIRS
Phone & Fax: 252.726.6775
Cell: 252.342.6775
205 Nottingham Lane Morehead City, NC 28557
m■ IM■es
M■ _ - 90000110
-■ f _■-®
�■ MEMO
M■ MEMO
M■ MIN��
M■ IM■Sm
M■ . ®■MM
M■ .mom�
e■ RIM■Om
-■- IM■om
M■ AM
M■ ®mom
M■ MI■■■M
Y
Styron, Heather M.
From: Jasa Ellis <jasa5@ec.rr.com>
Sent: Thursday, June 18, 2015 6:36 AM
To: Styron, Heather M.
Subject: Fwd: dock construction for the Leibels on Lola Lane MHC NC
Begin forwarded message:
From: "Holt Faircloth" <holt@faircloth.us>
Date: June 1, 2015 8:21:00 AM EDT
To: "'Jasa Ellis"' <jasa5@ec.rr.com>
Subject: RE: dock construction for the Leibels on Lola Lane MHC NC
Reply -To: <holt@faircloth.us>
I have no objection to the below described dock an d platform.
Holt Faircloth
Owner 141 Lola Lane
-----Original Message -----
From: Jasa Ellis [mailto:jasa5@ec.rr.com�
Sent: Monday, June 1, 2015 6:30 AM
To: holt@faircloth.us
Subject: dock construction for the Leibels on Lola Lane MHC NC
Hey Mr Faircloth, It was nice talking to you the other day. As we discussed
, The Leibels are planning on having a 100' dock built with a 10'x20'
platform. If you would email me back saying that you have no objections to
this, we certainly would appreciate it. It will be placed in the center of
their property. Not within 15' of property line.
Thank you, Eric Ellis 252 342 6775
No virus found in this message.
• RECEIVED
Checked by AVG - www.avg.com
Version: 2015.0.5941 / Virus Database: 4354/9913 - Release Date: 05/31/15 JUN 2 3 2015
1? F�J-N1�1u Poµ
Page 1 of 1
We have no issues. Bob & Sue
Sent from my iPad
On May 28, 2015, at 3:01 PM, Cecelia Ellis <cadixon(a.)ec.rr.com> wrote:
From: rayvote
Date. 5/28/2015 9:22:52 AM
To: Cecelia Ellis
Subject. Re: Notification of Leibels dock construction
Eric ask me to forward to you as his a=mail would not go through. CeCe
Original Message
From: Jasa Ellis
Date: 5/28/2015 7:21:27 AM
To: Cecelia Ellis
Subject. Fwd: Notification of Leibels dock construction
RECEIVED
Begin forwarded message:
JUN 2 31015
From: Jasa Ellis <jasa5 _ec.rr.com> Fa-�y�aG_
Date: May 28, 2015 7:15:24 AM EDT
To: rag rote[a)_earthlink.net, 2buns -earthlink.net
Subject: Notification of Leibels dock construction
Hey ya'II, Hope your having fun in Italy.
Kevin and Ann Leibel have decided to go ahead and build a dock. I need for you to respond back to
me
saying that you have no objections to them doing so.
The dock will extend out from the center of their lot 100' out with a 10'x15' platform. It will not be
within 15'
from your property line. If you will send an email back to me saying that you have no problems with
this,l
will proceed with obtaining their permit. Have fun and be safe. Thanks. Eric
This email has been checked for viruses by Avast antivirus software.
<•�-� rii 91/clstf
www.avast.com
file:///C:/Users/Cecelia/AppData/LocallIMIRuntimelMessage/%7B016056CF-24AA-45B2... 5/28/2015
_ ,.
r' -
,:�
�; �