HomeMy WebLinkAboutHanna, EdwardEl DREDGE & FILL
A B
D
GENERAL PERMIT
Previous permit #
bNew ElModification E]Complete Reissue El Partial Reissue
Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant
to 15A NCAC
E] Rules attached.
Applicant Name -, ! :1 i,-I' , � 1-1 , , I w ,, I
L
Project Location: County
Address
Street Address/
State Road/ Lot #(s)
7-
- City State)�!' zip
Phone # E-Mail
Subdivision -
o 1 -J,
Authorized Agent
city
ZIP
0 Cw [3 Ewe [3 PTA [3 ES -,OPTS
Phone#
River,,B.asin
Affected
E3 OEA 0 HHF 01H 0 UBA 0 WA
AEC(s):
Adj. Wtr. Body
I'll I `
man /unkn
0
0 PWS:
PNA
Closest Maj. Wtr. Body -
01RW: yes yes no)
Type of Project/ Activity
7
(Scale:
' r Ze
Float
Fing.
Groff
Bulkl%
Basin
�I
Boat
Boat
Beac
otJ
Sho
SAV
Mor,
Phot
Wain
��
a
of
ONE
ell
��
length
COMMON
number,.---
NIMENNEMENIVE
EMEMEMEME
EMMEMME
ead/ Riprap length-'
k,
avg distance offshore
MEMEN
99EM1
EMEMEM
EME
O
a�°
vIMo
NJ
cubic yards
NNE
ME
M
MEN
ramp
ELM
0
M
—MEN
�,ouse/ Boatlift
MMMw__MMMM
M
MOWN
a
MEN
I
M
ME
MUM
ON
MOSINEE
NOME
M
0
Bulldozing
MINE
MEMO
NEENINE
Boom,
MEMMEMEM
Length
"
not sure yes no
n/a yes
Fs: yes
IMMEME
no
no:
A building permit may be required by:
Note Local Planning jurisdiction),,
Notes/ Special Conditions
or
1-1 1 V -ESee note on back regarding River Basin rules.
0V (I rf
Permit
Printed
Sigpature Please read compliance statementon backof permit Signature
Ap plication Fee(s) Check# Issuing Date
.,Expiration Date
Li
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules ❑ Other:
Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 1 ) or the
Wilmington Regional Office (910-796-7215) for more information on howto complywith these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters
400 Commerce Ave
Morehead City, NC 28557
252-808-2808/ ,1-888-4RCOAST
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -
North of New River Inlet- and Pamlico
Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax:910-395-3964
(Serves: Brunswick, New Hanover,
Onslow - South of New River Inlet -
and Pender Counties)
http://www.nccoastalmanagement.netl
Revised 08/27/14
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to Edward and Janie Hanna's
(Name of Property Owner)
property located at 752 Sandy Point Drive
(Address, Lot, Block, Road, etc.)
on Neuse River, in Carteret County, N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
location.
1 have no objection to this proposal.
I have objections to this proposal.
1, ' . DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(individual proposing development must rill in description below or attach a site drawing)
Extension of the existing riprap 50 feet to the east as shown on enclosed google earth picture
8 ej L UL —
RECEIVED
DEC 0 2 2015
DCM- MHD CITY
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set
back a minimum distance of 15' from my area of riparian access unless waived by me. (If you
wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
Property Owner Information) .
Q•,..-�s�
Signature
Edward and Janie Hanna
Print or Type Name
752 Sandy Point Drive
Mailing Address
Beaufort
City/State/Zip
Beaufort, NC 28516
Telephone Number
252-515-2602
Date
(Adjacent
and
7106 Angel Falls
Mailing Address
Missouri City, TX 77459
City/State/Zip
Telephone N mbe
Y?�� t
Date
October28,2015
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT.
I hereby certify that I own property adjacent to Edward and Janie Hanna's
(Name of Property Owner);
property located at 752 Sandy Point Drive
(Address, Lot, Block, Road, etc.)
on Neuse River, in Carteret County, N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the. development proposed at the above
location.
I have no objection to this proposal..
I.have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(individual proposing development must sill in description below or attach a site drawing)
Extension of the existing riprap '50 feet to the east as shown on enclosed google earth picture
RECEIVED
DEC 0 2 2015
DCM- MHD CITY
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set
back a minimum distance. of 15' from my area of riparian access unless waived by me. (If you
wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement:.
I do not wish to waive the 15' setback requirement.
(Property Owner Information) (Adj ent Pr a Owner Information)
Signature Signal=
Edward and Janie Hanna WilliamRushton
Print or Type Name Print or Type Name
752.Sandy Point Drive
Mailing Address
Beaufort
CitylSfate2ip
Beaufort, NC 28516
Telephone Number
252-515-2602
Date
October28,2015
Mailing Address l °"' 7"//� c. s�c�lt Cr
A1066,' n/C Z 7S o 2
City/Sfate2ip
91 9 — z-t' --cs &9 0
Telephone Number
J0/z9J.,
Date.
• . < �'�� RECEIVE®
NC®ENR
North Carolina Department of Environment and Natural Resources DEC 0 2 2015
Division of Coastal Management
Beverly Eaves Perdue James H. Gregson DCM- MR
Governor Director e y
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of wa►er Quality (DWQ)°regulations 15A NCAC 02B.0259 & 0233.-The"Division of Coastal'Management
(DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project
proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical
alternatives" determination per those regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor
land clearing to a civil penalty of up to $25,000 per day per violation.
1... Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30.feet landward) shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
2. Clearing & Grading; Clearing and grading of Zone 2 (begins at the landward edge of Zone 1. and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
• 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in.order to provide for structural stability.
5.. Site Restoration: At minimum, pre -project site conditions must be,re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re-
established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would
remove understory vegetation is allowed
Pre- rt on .
v o c�
- - • ojecsite cdi ons: -
J9 S a na (II)II U is 5
s. Project brawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating, the, location. of the shoreline stabilization structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting. all of the above listed conditions and verify that at
information is complete and accurate.
LJ 19. 0192
Agent or plic t P nted Name Permit ffIc i}s ignature
1
Agent or Applicant Signature issue Dat
CAMA GENERAL PERMIT #:
Washington Office Morehead City Office
943 Washington Square Mall 400 Commerce Avenue
Washington, NC 27889 Morehead City, NC .28557 Nonl hCarolina
Phone 252.946-6481 Phone 252-808-2808
An Equal Opportunity/Affumafive Action Employer— 50% Recycled/10% Post Consumer Paper X& MAY
Version 5, 092009