Loading...
HomeMy WebLinkAboutHanna, EdwardEl DREDGE & FILL A B D GENERAL PERMIT Previous permit # bNew ElModification E]Complete Reissue El Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC E] Rules attached. Applicant Name -, ! :1 i,-I' , � 1-1 , , I w ,, I L Project Location: County Address Street Address/ State Road/ Lot #(s) 7- - City State)�!' zip Phone # E-Mail Subdivision - o 1 -J, Authorized Agent city ZIP 0 Cw [3 Ewe [3 PTA [3 ES -,OPTS Phone# River,,B.asin Affected E3 OEA 0 HHF 01H 0 UBA 0 WA AEC(s): Adj. Wtr. Body I'll I ` man /unkn 0 0 PWS: PNA Closest Maj. Wtr. Body - 01RW: yes yes no) Type of Project/ Activity ­7 (Scale: ' r Ze Float Fing. Groff Bulkl% Basin �I Boat Boat Beac otJ Sho SAV Mor, Phot Wain �� a of ONE ell �� length COMMON number,.--- NIMENNEMENIVE EMEMEMEME EMMEMME ead/ Riprap length-' k, avg distance offshore MEMEN 99EM1 EMEMEM EME O a�° vIMo NJ cubic yards NNE ME M MEN ramp ELM 0 M —MEN �,ouse/ Boatlift MMM­w__MMMM M MOWN a MEN I M ME MUM ON MOSINEE NOME M 0 Bulldozing MINE MEMO NEENINE Boom, MEMMEMEM Length " not sure yes no n/a yes Fs: yes IMMEME no no: A building permit may be required by: Note Local Planning jurisdiction),, Notes/ Special Conditions or 1-1 1 V -ESee note on back regarding River Basin rules. 0V (I rf Permit Printed Sigpature Please read compliance statementon backof permit Signature Ap plication Fee(s) Check# Issuing Date .,Expiration Date Li Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules ❑ Other: Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 1 ) or the Wilmington Regional Office (910-796-7215) for more information on howto complywith these buffer rules. Division of Coastal Management Offices Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ ,1-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow - North of New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow - South of New River Inlet - and Pender Counties) http://www.nccoastalmanagement.netl Revised 08/27/14 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to Edward and Janie Hanna's (Name of Property Owner) property located at 752 Sandy Point Drive (Address, Lot, Block, Road, etc.) on Neuse River, in Carteret County, N.C. (Waterbody) (City/Town and/or County) The applicant has described to me, as shown below, the development proposed at the above location. 1 have no objection to this proposal. I have objections to this proposal. 1, ' . DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (individual proposing development must rill in description below or attach a site drawing) Extension of the existing riprap 50 feet to the east as shown on enclosed google earth picture 8 ej L UL — RECEIVED DEC 0 2 2015 DCM- MHD CITY WAIVER SECTION I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. Property Owner Information) . Q•,..-�s� Signature Edward and Janie Hanna Print or Type Name 752 Sandy Point Drive Mailing Address Beaufort City/State/Zip Beaufort, NC 28516 Telephone Number 252-515-2602 Date (Adjacent and 7106 Angel Falls Mailing Address Missouri City, TX 77459 City/State/Zip Telephone N mbe Y?�� t Date October28,2015 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT. I hereby certify that I own property adjacent to Edward and Janie Hanna's (Name of Property Owner); property located at 752 Sandy Point Drive (Address, Lot, Block, Road, etc.) on Neuse River, in Carteret County, N.C. (Waterbody) (City/Town and/or County) The applicant has described to me, as shown below, the. development proposed at the above location. I have no objection to this proposal.. I.have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (individual proposing development must sill in description below or attach a site drawing) Extension of the existing riprap '50 feet to the east as shown on enclosed google earth picture RECEIVED DEC 0 2 2015 DCM- MHD CITY WAIVER SECTION I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set back a minimum distance. of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement:. I do not wish to waive the 15' setback requirement. (Property Owner Information) (Adj ent Pr a Owner Information) Signature Signal= Edward and Janie Hanna WilliamRushton Print or Type Name Print or Type Name 752.Sandy Point Drive Mailing Address Beaufort CitylSfate2ip Beaufort, NC 28516 Telephone Number 252-515-2602 Date October28,2015 Mailing Address l °"' 7"//� c. s�c�lt Cr A1066,' n/C Z 7S o 2 City/Sfate2ip 91 9 — z-t' --cs &9 0 Telephone Number J0/z9J., Date. • . < �'�� RECEIVE® NC®ENR North Carolina Department of Environment and Natural Resources DEC 0 2 2015 Division of Coastal Management Beverly Eaves Perdue James H. Gregson DCM- MR Governor Director e y BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins per Division of wa►er Quality (DWQ)°regulations 15A NCAC 02B.0259 & 0233.-The"Division of Coastal'Management (DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. 1... Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either the waters edge or the coastal wetland line and extends 30.feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading; Clearing and grading of Zone 2 (begins at the landward edge of Zone 1. and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. • 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in.order to provide for structural stability. 5.. Site Restoration: At minimum, pre -project site conditions must be,re-established. A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re- established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would remove understory vegetation is allowed Pre- rt on . v o c� - - • ojecsite cdi ons: - J9 S a na (II)II U is 5 s. Project brawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating, the, location. of the shoreline stabilization structure and any associated clearing, grading, and construction corridors. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting. all of the above listed conditions and verify that at information is complete and accurate. LJ 19. 0192 Agent or plic t P nted Name Permit ffIc i}s ignature 1 Agent or Applicant Signature issue Dat CAMA GENERAL PERMIT #: Washington Office Morehead City Office 943 Washington Square Mall 400 Commerce Avenue Washington, NC 27889 Morehead City, NC .28557 Nonl hCarolina Phone 252.946-6481 Phone 252-808-2808 An Equal Opportunity/Affumafive Action Employer— 50% Recycled/10% Post Consumer Paper X& MAY Version 5, 092009