HomeMy WebLinkAboutDaniels, MikePhone#
Fax #
Authorized rized Agent
Affected EiCW VIEW � PTA ❑ ES 0 PTS
AEC(s): 0 OEA D HHF 011H E] UBA 0 N/A
0 PWS: 13FC:
ORW: ('yes ?)no PNA yes J.'no, Crit.Hab. yes no
Type of Project/ Activity r tx
&
Pier (dock) length I `'/ b I
Platform(s) C"K
Finger pier(s)
Groin length
number
Bulkhead/ Riprap, length
avg distance offshore
max distance offshore
Basin, channel
cubic yards
Boat ramp
eoathouiZI, B;atlift
Beach Bulldozing
Other
Subdivision
I- -)
;/'; I elf. �,-( J f
0 / zip I
Phone# River Basin
Adj. Wtr. Body nat /man /unkn)
Closest Maj. Wtr. Body—
V) e-. :/ A (;-ij eo
(Scale: r )
P.M. ==IIwww=I=III
Room 0
MEMMUNNEEMENON
NEENEENEEN I EMEENNEN
J El See note on back regarding River Basin rules.
PermitOticer s t Sign re
a
Issuing Datd
E4irationDate
Local Planning Jurisdiction
Rover File Name. .
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythat this project is consistentwith the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules F-1 Other:
0 Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office
Morehead City Headquarters
Mailing Address:
400'Commerce Ave
1638 Mail Service Center
Morehead City, NC 28557
Raleigh, NC 27699-1638
252-808-2808/ 1-888-4RCOAST
Location:
Fax: 252-247-3330
2728 Capital Blvd. '
(Serves: Carteret, Craven, Onslow -above
Raleigh, NC 27604
New River Inlet- and Pamlico Counties)
919-733-2293
Fax: 919-733-1495
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
---�----------
� t
`�
�
f
I 16'
2 piling side
lift
Platform
5'x10' 5'x10'
platform
(01
Dock
Dock To
Sewall
Dock 200ft Long
14' x 28'
Platform
5'x10' (392sgft)
0 Boathouse 0
Top to be installed at later date
]1) 5' x 10'
platform
C•�
0 0
n
oV
Center piling to be installed s� )
To winch boat on at low tied.
RECENED
JUN 0 2 2014
L
DCM-1I mc1, I
ConnectGIS Feature Report
Page i of 1
CONNECTGIS
WEB HOSTING
Carteret2
Printed May 29, 2014
See Below for Disclaimer
Parcels - Updated 02-20-2014
El
Centerlines
County Boundary
Other County
<all othervalues>
Cart
PIN
Acreage
Parcel Dimensions
Lot Number
Ike
1
-16131
4Q�9 9 RECEPiTr
6Jk 08: -- :.w�� .� I r.JUN 0 2 2014
DCM--MHD C"
Total Length. 3' 2.04 Feet
a " 9774.94 Sq. Feet
or.22 :;ores
W E or Sq. Miles
S ' 68 Feet I
he information displayed by this website is prepared for the inventory of real property found within this jurisdiction and is compiled from recorded deeds, plats, and other
ublic records and data. Users of this information are hereby notified that the aforementioned public primary information sources should be consulted for verification o
he information contained on this site. Carteret County assumes no legal responsibility for the information contained on this site. Carteret County does not guarantee that
he data and map services will be available to users without interruption or error. Furthermore, Carteret County may modify or remove map services and access methods a
m
http://carteret2.connectgis.comIDownloadFile.ashx?i= ags_mapec2l8lO83aaa49edb5c24c... 5/29/2014
SECTION .1200 - GENERAL PERMIT FOR CONSTRUCTION OF PIERS AND DOCKING
FACILITIES: IN ESTUARINE AND PUBLIC TRUST WATERS AND OCEAN HAZARD
AREAS
15A NCAC 07H .1201 PURPOSE
A permit under this Section shall allow the construction of new piers and docking facilities (including pile supported or
floating) in the estuarine and public trust waters AECs and construction of new piers and docks within coastal wetlands AECs
according to the authority provided in Subchapter 07J .1100 and according to the Rules in this Section. This permit shall not
apply to oceanfront shorelines or to waters and shorelines adjacent to the Ocean Hazard AEC with the exception of those
shorelines that feature characteristics of the Estuarine Shoreline AEC. Such features include the presence of wetland
vegetation, lower wave energy, and lower erosion rates than the adjacent Ocean Erodible Area.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff.' March 1, 1984;
Amended Eff. July 1, 2009, April 1, 2003.
15A NCAC 07H .1202 APPROVAL PROCEDURES
(a) An applicant for a General Permit under this Subchapter shall contact the Division of Coastal Management and request
approval for development. The applicant shall provide information on site location, dimensions of the project area, and his
name and address.
(b) The applicant shall provide:
(1) confirmation that a written statement has been obtained signed by the adjacent riparian property owners
indicating that they have no objections to the proposed work; or
(2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed
work. The notice shall instruct adjacent property owners to provide any comments on the proposed
development in writing for consideration by permitting officials to the Division of Coastal Management within
10 days of receipt of the notice, and, indicate that no response will be interpreted as no objection. DCM staff
shall review all comments and determine, based on their relevance to the potential impacts of the proposed
project, if the proposed project can be approved by a General Permit. If DCM staff finds that the comments are
worthy of more in-depth review, DCM shall notify the applicant that he must submit an application for a major
development permit.
(c) No work shall begin until an on -site meeting is held with the applicant and a Division of Coastal Management
representative to review the proposed development. Written authorization to proceed with the proposed development shall be
issued if the Division representative finds that the application meets all the requirements of this Subchapter. Construction
shall be completed within 120 days of the issuance of the general authorization or the authorization shall expire and it shall be
necessary to re-examine the proposed development to determine if the general authorization may be reissued.
(d) Any modification or addition to the authorized project shall require prior approval from the Division of Coastal
Management.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. October 1, 2007, August 1, 1998; January 1, 1990.
15A NCAC 07H .1203 PERMIT FEE
The applicant shall pay a permit fee of two hundred dollars ($200.00) by check or money order payable to the Department.
History Note: Authority G.S. 113A-107, 113A-113(b); 113A-118.1; 113A-119, 113-119.1; 113A-124;
Eff. March 1, 1984,
Amended Eff. September 1, 2006, August 1, 2000; March 1, 1991.. RECEIVED
r
JUN 0 2 2014
15A NCAC 07H .1204 GENERAL CONDITIONS
DCM-MHD CITY
(a) Piers and docking facilities authorized by this general permit shall be for the exclusive use of the land owner, or occupant
and shall not be leased or rented or used for any commercial purpose. Except in the cases of shared piers as described in 7H
.1205, piers and docking facilities designed to provide docking space for more than two boats shall, because of their greater
49
potential for adverse impacts, be reviewed through the major permitting process and, therefore, are not authorized by this
general permit.
(b) Individuals shall allow authorized representatives of the Department of Environment and Natural Resources to make
periodic inspections at any time deemed necessary in order to be sure that the activity being performed under the authority of
this general permit is in accordance with the terms and conditions prescribed herein.
(c) There shall be no interference with navigation or use of the waters by the public by the existence of piers and -docking
facilities.
(d) This permit shall not be applicable to proposed construction where the Department determines that the proposed activity
will endanger adjoining properties or significantly affect historic, cultural, scenic, conservation or recreation values, identified
in G.S. 113A-102 and G.S. 113A-113(b)(4).
(e) This permit does not eliminate the need to obtain any other required state, local, or federal authorization.
(f) Development carried out under this permit shall be consistent with all local requirements, AEC Guidelines, and local land
use plans current at the time of authorization.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984,
Amended Eff. May], 1990;
RRC Objection due to ambiguity Eff. May 19, 1994,
Amended Eff. July 1, 2009, August 1, 1998; July 1, 1994.
15A NCAC 0711.1205 SPECIFIC CONDITIONS
(a) Piers and docking facilities may extend or be located up to a maximum of 400 feet waterward from the normal high water
line or the normal water. level, whichever is applicable.
(b) Piers and docking facilities shall not extend beyond the established pier length along the same shoreline for similar use.
This restriction shall not apply to piers and docking facilities 100 feet or less in length unless necessary to avoid interference .
with navigation or other uses of the waters by the public such as blocking established navigation routes or interfering with
access to adjoining properties. The length of piers and docking facilities shall be measured from the waterward edge of any
wetlands that border the water body.
(c) Piers and docking facilities longer than 200 feet shall be permitted only if the proposed length gives access to deeper
water at a rate of at least one foot at each 100 foot increment of pier length longer than 200 feet, or if the additional length is
necessary to span some obstruction to navigation. Measurements to determine pier and docking -facility lengths shall be made
from the waterward edge of any coastal wetland vegetation, which borders the water body.
(d) Piers shall be no wider than six feet and shall be elevated at least three feet above any coastal wetland substrate as
measured from the bottom of the decking.
(e) The total square footage of shaded impact for docks and mooring facilities (excluding the pier) allowed shall be 8 square
feet per linear foot of shoreline with a maximum of 800 square feet. In calculating the shaded impact, uncovered open water
slips shall not be counted in the total.
(f) The maximum size of any individual component of the docking facility authorized by this General Permit shall not exceed
400 square feet.
(g) Docking facilities shall not be constructed in a designated Primary Nursery Area with less than two feet of water at
normal low water level or normal water level (whichever is applicable) under this permit without prior approval from the
Division of Marine Fisheries or the Wildlife Resources Commission (whichever is applicable).
(h) Piers and docking facilities located over shellfish beds or submerged aquatic vegetation (as defined by the Marine
Fisheries Commission) may be constructed without prior consultation from the Division of Marine Fisheries or the Wildlife
Resources Commission (whichever is applicable) if the following two conditions are met:
(1) Water depth at the docking facility location is equal to or greater than two feet of water at normal low
water level or normal water level (whichever is applicable).
(2) The pier and docking facility is located to minimize the area of submerged aquatic vegetation or shellfish
beds under the structure.
(i) Floating piers and floating docking facilities located in PNAs, over shellfish beds, or over submerged aquatic vegetation
shall be allowed if the water depth between the bottom of the proposed structure and the substrate is at least 18 inches at
normal low water level or normal water level, whichever is applicable.
0) Docking facilities shall have no more than six feet of any dimension extending over coastal wetlands and shall be elevated
at least three feet above any coastal wetland substrate as measured from the bottom of the decking.
(k) The width requirements established in Paragraphs (d), (e), (f), (g), (h), (i), and 0), of this Rule shall not apply to pier
structures in existence on or before July 1, 2001 when structural modifications are needed to prevent or minimize storm
damage. In these cases, pilings and cross bracing may be used to provide structural support as long as they do not extend
more than of two feet on either side of the principal structure. These modifications shall not be used to expand the floor
decking of platforms and piers.
(1) Boathouses shall not exceed a combined total of 400 square feet and shall have sides extending no further than one-half
the height of the walls as measured in a downward direction from the top wall plate or header and only covering the top half
50
of the walls. Measurements of square footage shall betaken of the greatest exterior dimensions. Boathouses shall not be
allowed on lots with less than 75 linear feet of shoreline.
(m) The area enclosed by a boat lift shall not exceed 400 square feet.
(n) Piers and docking facilities shall be single story. They may be roofed but shall not allow second story use.
(o) Pier and docking facility alignments along federally maintained channels shall also meet Corps of Engineers regulations
for construction pursuant to Section 10 of the Rivers and Harbors Act.
(p) Piers and docking facilities shall in no case extend more than 1/4 the width of a natural water body, human -made canal or
basin. Measurements to determine widths of the water body, human -made canals or basins shall be made from the waterward
edge of any coastal wetland vegetation which borders the water body. The 1/4 length limitation shall not apply when the
proposed pier and docking facility is located between longer structures within 200 feet of the applicant's property. However,
the proposed pier and docking facility shall not be longer than the pier head line established by the adjacent piers and docking
facilities nor longer than 1/3 the width of the water body.
(q) Piers and docking facilities shall not interfere with the access to any riparian property, and shall have a minimum setback
of 15 feet between any part of the pier and docking facility and the adjacent property lines extended into the water at the
points that they intersect the shoreline. The minimum setbacks provided in the rule may be waived by the written agreement
of the adjacent riparian owner(s), or when two adjoining riparian owners are co -applicants. Should the adjacent property be
sold before construction of the pier commences, the applicant shall obtain a written agreement with the new owner waiving
the minimum setback and submit it to the Division of Coastal Management prior to initiating any development of the pier or
docking facility. The line of division of areas of riparian access shall be established by drawing a line along the channel or
deep water in front of the property, then drawing a line perpendicular to the line of the channel so that it intersects with the
shore at the point the upland property line meets the water's edge. Application of this Rule may be aided by reference to the
approved diagram in Paragraph (t) of this Rule illustrating the rule as applied to various shoreline configurations. Copies of
the diagram may be obtained from the Division of Coastal Management. When shoreline configuration is such that a
perpendicular alignment cannot be achieved, the pier or docking facility shall be aligned to meet the intent of this Rule to the
maximum extent practicable.
(r) Piers and docking facilities shall be designed to provide docking space for no more than two boats.
(s) Applicants for authorization to construct a pier or docking facility shall provide notice of the permit application to the
owner of any part of a shellfish franchise or lease over which the proposed pier or docking facility would extend. The
applicant shall allow the lease holder the opportunity to mark a navigation route from the pier to the edge of the lease.
(t) The diagram shown below illustrates various shoreline configurations:
,F.
JUN 0 2 2014
DCM-MHD CITY
51
(u) Shared piers or docking facilities shall be allowed and encouraged provided that in addition to complying with
(a) through (t) of this rule the following shall also apply:
(1) The shared pier or docking facility shall be confined to two adjacent riparian property owners and the
landward point of origination of the structure shall overlap the shared property line.
(2) Shared piers and docking facilities shall be designed to provide docking space for no more than four boats.
(3) The total square footage of shaded impact for docks and mooring facilities shall be calculated using (e) of
this rule and in addition shall allow for combined shoreline of both properties.
(4) The property owners ofthe shared pier shall not be required to obtain a 15-foot waiver from each other as
described in subparagraph (q) of this rule as is applies to the shared riparian line for any work associated
with the shared pier, provided that the title owners of both. properties have executed a shared pier
agreement that has become a part of the permit file.
(5) The construction of a second access pier or docking facility not associated with the shared pier shall require
authorization through the CAMA Major full review permit process.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124,
Eff. March 1, 1984;
Amended Eff. December 1, 1991; May 1, 1990; March 1, 1990;
RRC Objection due to ambiguity Eff. March 18, 1993;
Amended Eff. August], 1998; April 23, 1993;
Temporary Amendment Eff. December 20, 2001;
Amended Eff. July 1, 2009; April 1, 2003.
52
E Lee,*.Permit Number
OeeanlTrtasd Es"kcSbatlipa 'O1tW3horelne Public TimtSibaelbu Other
(Forp�kw air on(y)
('J�' .1tAi.1}VAOILMATIOPt
LAND OWNER
Name Michoot mid Patsy Drdets
Addrm 1410 Emoraid Drive
City Enward Isle ate kc yip 2781S Phone Bt W99S.82SS
Finait danvil0010hoirml.cm,
AVI`HORtZED AGENT
Name 1-n S-w1rer
Address
City State Zip Pbmv
Email
LOCATION OF PROACT: (Address, sheet name anUor directions to site. Ifoot ocsonfiont, afire is the name oftht
arlfaret tvattrbotJy;)Bwpus 5outd
DESCRIPTION OF PROJECT: (List all proposed construction and Lad disturbance.) Dock and Boat House
SIZE OF LOT/PARCTA. square feet acres
PROPOSED USE: Residential ® (Si ngledamrly M Mutd-family El) . Commorcial/1"dustri,113 Other
COMPLETE EITHER (I) OR (3) BELOW (Con laayowleeWPmmNod m#)P a wrrwats:me roArktAECeA,W&s
b)an�aroleaq):
(1) OMANBAZARDAECt:TOTALFLOORAREA OFPROPOSEDSTRUCTURE: square fact (includes
air conditioned living space, parking tkwAcd above ground level, non -conditioned apace elevated above ground level but
excluding no -load -bearing attic epece)_........ _
(2) COASTALSHORKIZm AEG1: SIZE OFBuxDiNG FOOTPRINrAND OTHER IMPERVIOUS ORBUILT
UPON SURFACES: _ agrrore feet (roc ides the restof the roof/drip line of all building; driveways, covered socks,
concrete astronomy patios, etc, that we within the applicable AEC Attach you edcmlatioc s with the project drw*&)
STATE STORAdWATER MANAGF,MF.NT PFJMIT: Is the project located in so area wNed to a State Stonmwater
Mmag^ tNpermt issued by the NC Divisiom of Water Quality?
YES
Ifytter, list the totalC=built upon rtatmperyiouasurface allowed foryoorlot orpored: square Ito.
OTHER PERMITS MAYBE REQUIRED: "t activity you are planing may requirepermits other thin the LAMA
minor development perm it, including. but not limited to: Drinking Water Well, Septic Tank (orother sanitary waste
trcstmeat system). Building, idedrisad, Phuabiag Heseng atdAirGoaditionng,lnwlation audEnergy t oaservatioa, FIA
Certification, Sand Dune. Sediment Control, Subdivision Apptovel, Mobile Home, Park Approval. Highway Conned ion, and
others. Check with your Local Permit OfIcerfor more nformotiat
STATEMENT OF 014NERSIIIP:
1, the undersigned, an applicant for a CAMA minor development permit, being eitherthe owner of property in an AEC or a
person authorized to act to an agent for purposes of applying for aCAMA minor development permit certify that the person
listed so landowner on this application has a significant interest in the real pro" described therein. This interest can be
described as: (check one)
0. owner or record Mt.Ttle is vested in MiChale and Patsy Daniels : see Deed Book
page ' is the Comity Registry of Deeds.
Don ownerby virtue ofinhetitmca Applicant is an heirto me estate of
probate was in County.
E317other interest, such as written contract or least, expLn below or ace a separate shoat A attach to this application.
NOTIFICATION OFAD]ACENT PROPFRTY OWNERS:
I furthermore certify that the fallowing persons arc owners ofptoperties adjoining this peopeay. I afli m that I have given
ACfUALNOTICE to each oftbtao concerning my intent to develop this property and to apply for a CAMA permit.
dame) (Addrer}
(1) Richard B►oadweil U08 Emerald Drive. Emerald Isle, NC 28594
(_) George Grand 1412 Emerald Drive. Emerald Isis, NC 28594
(3) ,2-)n g ram" SIC v U
AC 1aiOWGEDGrAffNTS:
1, the undersigned, acknowledge that the hand owner is swan that the proposed dcvelopmant is planed far an open which
may be susceptible to tro3ion andfordoodio& I acknowledge thin the Local Permit Officer has explained tome the portico-
Lrbazsmd problems associated with this lent Ibis cVl msdkn was occompanitd by ncommendntions cmet min& stabiliza-
don and 800dpwofing teehnigaes.
I furthermore certify that I am authorized to grant, and do in fed gmmt, ptrmiosian to Division of Coastal Management staff;
the Local Permit Officer and thsir oge sts to eater ore the aforementioned lands in connection with evaluating inrormation
related to this permit agplicatimn...
Thi,the 22nd dwfApnilzo is
anL downer srpersoa a8hoized to act as his/her agent torpor" of Sling a CAMA permit application
ndr gWSmotms AsetaCer gowral informhon (thaformA a site &awrna as desexnbed on the hxk ofthisa*u+ottorr, the
ow►.ershtp statwnrd, the C�vtn Ha=nfAEClklin where nave wy, a check for 810a 00 maidepVabir m the lxality, and
any Infinnabon as pray be provided orally by the Appnoant The darnels ofthe axgohcatitrt err doer rn8ed hr thane sourcwane
1neorporated WAaadt Nftmac 1n w W peir which nay be tssr¢d Ltaviation front tlusr ddsils will cpanrttute a pnalatu n of
anypernu.! Any perscnt dawlcping to an AEC wahadtprmut a subjectM civtL cnnunal and admmtsirattva action.
RECETVM
�3 M,a
JUN 0 2 2014
nrM MT-�j CITY
,l,r•tiR�:tutlt'*1Ttt