HomeMy WebLinkAboutBrandywine Marina Association, Inc.
March 16, 2015
Ms. Heather Styron
Division of Coastal Management
400 Commerce Avenue
Morehead City, NC 28557
Dear Ms. Styron:
Please accept this as our request for an exemption for the Brandywine Marina Association's
breakwater repair project. As per our previous discussions and your request, I am enclosing
drawings/specifications of the maintenance to be performed. 1 trust that you will find the
specifications to be in line with discussions at our last meeting on the marina site. We propose
to install approximately 448 L. F. of vinyl sheet pile, representing 50% of the structure's total
length. Also, as discussed, we will be installing approximately fifty five (55) 8" vertical/batted
pilings to replace decayed existing pilings. The contract for these repairs has been awarded to
Bogue Banks Marine Construction, Inc. (Derek Smith). He has a crew that will be available for
our project within the next seven to ten days and is therefore anxious to mobilize and begin
placing needed materials on site. Any consideration that you are able to give for a prompt
response will be very much appreciated.
Please let me know if you should have any questions or need additional information.
Sincerely,
Az da-,� 7
Jack L. Ashley, President
Brandywine Marina Association, Inc
Enclosures
Contact Numbers:
Cell: 252-717-6347
Home: 252-726-5911
RECEIVED
MAR 18 1015
RECEIVED
MAR 17 1015
DCM-MHt) C)IY
POINT A
LIvs7-,9 4 00 L-r. or VINYL 5tic--�� /sic
6N W1_5_ 32nA_KWg i c 77A
N��JL - c,?mac iZB_�G_ J�rLI/✓t�5
o
r� LGb.trr2gc �-'�,Z
� L'o.vsi��Tit�•v
RECEIVED
MAR 18 2015
Wa►�-WPP PITY
MBoiLE
G�yG/Z ! flC E
RECEIVED
RIM /nlq
MAR 17 2015
DCM-MHD CITY
Al
I
i
P�.o
II �t
ILI✓y-S ,
RECEIVED
MAR 18 2015
RECEIVED
MAR 17 2015
DCM-MHD CITY