Loading...
HomeMy WebLinkAboutWO 03-16 Midgette, Timpthy and Cynthia1 Carteret County WO.03.16 Local Government Permit Number' CAMA MINOR DEVELOPMENT PERMIT c. k as authorized by the State of North Carolina, Department of Environment, inanareaal Resources and, the Coastal of environment concern pursuant to Section 113An 18for development 113A-118 of the General Statutes, "Coastal Area Management" Issued;. to Timothy and Cynthia Midgette, authorizing development in the Estuarine Shoreline - ORW (AEC) at 107 Cape Point Blvd. Lot 4 Cape Point S/D, in Cape .Carteret, NC, as requested in the permittee's application, dated 01/07/16. This permit, issued on 01/22/16, is subject to compliance with the application and site drawing (where consistent with the permit), all applicable regulations and special conditions. and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void. This permit authorizes: Tree removal, fill dirt in areas where trees are to be removed and site prep for future construction (1) All proposed development and associated construction must be done in accordance with the permitted work plat drawings(s) dated received on 01108/16. (2) All construction must conform to the N.C. Building Code requirements and all other local, State and Federal regulations, applicable local ordinances and FEMA Flood Regulations. (3) Any change or changes in the plans for development, construction, or land use activities will require a re-evaluation and modification of this permit (4) A copy of this permit shall be posted or available on site. Contact this office at 252-222-5833 for a final inspection at completion of work. (Additional Permit Conditions on Page 2) This permit action may be appealed by the permittee or other` qualified persons - within twenty (20) days of the issuing date, This permit must be on the project�� site and accessible to the permit officer when the project is inspected for Onrya) compliance. Any maintenance work or project modification not covered under this permit, require further written permit approval. All work must cease when this: ris .tones permit expires on: CAMA LOCAL PERMIT OFFICIAL DECEMBER 31, 2019 701 Cedar P int Blvd. In issuing this permit it is agreed that this project is consistent with the local land Cedar Poi , Use Plan and all applicable ordinances. This permit may not be transferred to another party without- the written approval of the Division of Coastal Management.: PERMITT E (Signatute required if conditions above apply to permit) ,, J Name: Timothy and Cynthia Midgette Minor Permit # WO.03.16 Date: 01/22/16 Page 2 (5) Unless specifically allowed in 15A NCAC 07H.,0209(d)(10), and shown on the permitted plan drawing, all development/construction shall be located a distance of 30 feet landward of Normal High Water. (6) All unconsolidated material resulting from associated grading and landscaping shall be retained on site by effective sedimentation and erosion control measures. Prior to any land -disturbing activities, a barrier line of filter cloth must be installed between the land disturbing activity and the adjacent marsh or water areas, until such time as the area has been properly stabilized with a vegetative cover. (7) Any proposed for grading within the 30' buffer from the Normal High Water must be contoured to prevent additional stormwater, runoff to the adjacent marsh. This area shall be immediately vegetatively stabilized, and must remain in a vegetated state. '(8) All other disturbed areas shall be vegetatively stabilized (planted and mulched) within 14 days of construction completion. w Timmy and Cindy Midgette 106 Queens Rd Hubert, NC 28539 (910) 358-41.26 December 18, 2015 Mr. Smoke Betts Cape Point HOA 125 Cape Point Blvd Cape Carteret, NC 28584 Subject: Tree removal for lots 3 & 4 Mr. Betts, We have roughly 15-20 dead trees on our lots that continually litter the ground with dead branches. At this time, we would like to take down those trees and remove the debris/stumps. We have contacted a tree removal company and walked down the lots with them so that they understand exactly what we want. While there, we are also going to remove the pine trees from the lot, leaving the oak trees undisturbed. We want to leave the lots as natural as possible so we are leaving everything we can. Should we need to bring in any fill dirt, it will be minimal and it's purpose will be to backfill holes. We are not starting the grading portion at this time. We are reviewing house plans but still haven't decided on a final layout. Once we finalize our plans, we will present it to the committee for review. At this time, our goal is to remove the dead trees and pine trees, while leaving the lots clean and presentable. Sincerely, Timmy Midgette Cindy Midgette ACKNOWLEI the undersign may be suscept +asyr rr u4A This'Ya\13jplic,, ownership any informc arc >e of filing a is planned for an area which as explained to me the'particu adations concerning stabilize-' n of Coastal Management staff, with evaluating information