Loading...
HomeMy WebLinkAboutEX-2016-01_Jeremy Mason Construction, LLC._20160309March 9, 2016 Jeremy Mason Construction, LLC PO Box 2043 Morehead City, North Carolina 28557 Post 01fice Bo,',, 10; Ati ,;nti c Bae0i, 'N0 285 - (252) 7 26 -4- pax I"' 52 726-70 4 3 Michelle Grace Shreve Exemption Number — EX-2016-01 RE: EXEMPTED PROJECT (Statutory Exclusion) - MAINTENANCE AND REPAIR OF EXISTING STRUCTURES - [G.S.113- 103(5)(B)(5) and [15A NCAC 7K.0103(a)] PROJECT ADDRESS — 8 % Marina, Unit 151 Atlantic Beach, North Carolina 28512 AREA OF ENVIRONMENTAL CONCERN — Estuarine Shoreline Dear Jeremy: I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. After making a site inspection on March 6, 2016,1 have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with your site drawing and materials list submitted on March 5, 2016, and meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. MAINTENANCE AND REPAIR — [G.S.113.103(5)(B)(5) and 15A NCAC 7K.0103(a)] - Maintenance and repairs (excluding replacement) necessary to repair damage to structures caused by the elements are specifically excluded from the definition of development underthe conditions and in the circumstances set out in G.S. 113A-103(5)(b)(5). Individuals required to take such measures within an AEC shall contact the local CAMA representative for consultation and advice before beginning work. Structures may be repaired in a similar manner, size and location as the original structure. No expansions or additions are permissible. The repairs are limited to 60% of the market value of the existing structure and the following specific conditions. 1. The project consists of the repair of existing deck, as shown on the attached drawing and materials list. 2. The proposed repairs shall be consistent with all other applicable local ordinances and North Carolina Building Code standards. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization and N.C. Building Permits. This exemption expires 90 days from the date of the letter. Sincerely, i Michelle Grace Shreve, LPO Town of Atlantic Beach PO Box 10 Atlantic Beach, North Carolina 28512