HomeMy WebLinkAboutEx-15-35_Creviston, Steven_20151009October 9, 2015 Exemption Number —15-35
STEVEN CREVISTON
EMEK&LD ISLE 3420OWLSROOST RD
\4YR S H CAR01.ENA GREENSBORO, NC 27410
Nlce Mattersl
RE: EXEMPTED PROJECT (Statutory Exclusion) - MAINTENANCE AND REPAIR OF
Emerald Isle EXISTING STRUCTURES - [G.S.113-103(5)(B)(5) and [15A NCAC 7K,0103(a)]
Planning and Inspections
ld Drive PROJECT ADDRESS — 8707 OCEAN VIEW DR.
7500 Emerald Emerald Islet 28594 AREA OF ENVIRONMENTAL CONCERN — OCEAN HAZARD
252-354-8548 voice
252-354-5068 fax Dear MR. CREVISTON:
4vww,emera1disle-nc,or I have reviewed the information submitted to this office in your inquiry concerning the
necessary filing of an application for a minor development permit under the Coastal
j Area Management Act. After making a site inspection on OCTOBER 9, 2015„ 1 have
Town Planner determined that the activity you propose is exempt from needing a minor development
Josh Edmondson I permit as long as it remains consistent with your site drawing and materials list
edmondsonPemeraldisle-nc,ore submitted on OCTOBER 1, 2015, and meets the conditions specified below. If your plans
should change and your project will no longer meet these conditions, please contact me
before proceeding.
MAINTENANCE AND REPAIR — [G.S.113-103(5)(B)(5) and 15A NCAC 7K.0103(a)] -
Maintenance and repairs (excluding replacement) necessary to repair damage to
structures caused by the elements are specifically excluded from the definition of
ti 4 ( development under the conditions and in the circumstances set out in G.S.
113A-103(5)(b)(5). Individuals required to take such measures within an AEC shall
contact the local CAMA representative for consultation and advice before beginning
work.
Structures may be repaired in a similar manner, size and location as the original
structure. No expansions or additions are permissible. The repairs are limited to 50% of
the market value of the existing structure and the following specific conditions.
1. The project consists of the repair of Decking, as shown on the attached drawing and
materials list.
2. The proposed repairs shall be consistent with all other applicable local ordinances and
North Carolina Building Code standards.
This exemption to CAMA permit requirements does not alleviate the necessity of your
obtaining any other State, Federal or Local authorization and N.C. Building Permits, This
exemption expires 90 days from the date of the letter.
i
PSH EDMONDSON, LPO
EMERALD ISLE
I 7500 EMERALD DR
fEMERALD ISLE,. NC 28594