Loading...
HomeMy WebLinkAboutWO-04-13_Reeves, Jr, Veldon_20130402Jim Jennings, AICP Director 04/02/13 Veldon Reeves Jr. 610 Gantwood Lane Whitsett, NC 27377 CARTERET CO WESTERN OFFICE No.3506 P. 2 Carteret County Department of Planning and Development Main Office: Western Office: 302 Courthouse Square 701 Cedar Point Blvd. Beaufort, NC 28516-6709 Cedar Point, NC 28584-8013 Tel: (252) 728-8497or 728-8545 Tel: (252) 393-3204 Fax: (252) 728-6643 Fax: (252) 393-3205 Exemption Number — WO-0443 RE: EXEMPTED PROJECT - ACCESSORY USES --115A NCAC 7K .0209(b)y PROJECT ADDRESS —168 Live Oak Rd. Newport, NC AREA OF ENVIRONMENTAL CONCERN — Estuarine Shoreline ORW Dear Mr. Reeves: have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. After making a site Inspection on 04/02/13, 1 have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with your site drawing dated 04/01113, and meet the conditions specified below. Your project consists of constructing a 12x16 storage shed. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. Accessory Uses that are directly related to the existing dominant use and require no plumbing, electrical or other service connections are exempt from the CAMA minor development permit requirement If they meet the criteria set out below. 1. The development must not disturb a land area greater than 200 square feet. 2: The development must not involve removal, damage, or destruction of threatened or endangered animal or plant species. 3. The development must not alter naturally or artificially created surface drainage channels. 4. The development must not alter the landform or vegetation of a frontal dune. 5. The development must not be within 30 feet of normal high water level. 6. The development must be consistent with all applicable use standards and local land use plans.ln effect at the time the exemption Is granted. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization. This exemption expires 90 days from the date of the letter. Sincerely, Jim Stlpe, LIDO Carteret County Western Office Cc: Heather Styron, DCM w U CV : M M . a CV ' - - � �r�- -�+�✓ Sfi�cr�cLs . APPR DA= 4 f 13 PLANS FOR -HIS JO8 MUST 8E p(y JOB AT ALL TIMES, LL FEDERAL, STATE AND CITY CODESF ORDINANCES? AND REGULATIONS Ll VV- &L 'TC- SHALL E CONSMERE, AS PART OF SHALL T,�tCF. P. ��_ T;:lS lLDING AND "E LREhCE 0 VARt Srq' 0ESC:'tYEp Op fti4pLIED WHERE NG VARlAA'CES OCCUR, 11VFfERE S" CARTE} T couNTY B NSP 'S OFFICE .