Loading...
HomeMy WebLinkAbout692-13_Baker, Mack_2013042005/06/2013 MON 9e 07 FAX -+-b-. LAMA U001/002 Carteret Countv Local Government CAMA MINOR DEVELOPMENT PERMIT 692.13 Permit Number as authorized by the State or North Carolina, Department of Environment, and Natural Resources and the Coastal Reoeureea Commission for development In an area of environment concern pursuant to Section 113A-118 of the General Statutes, "Coastal Area MmnegamenV Issued to Mack Baker, authorizing development in the Estuarine Shoreline - ORW (AEC) at Davis' Midge at end of Community Rd., In Davis, as requested In the permittee's application, dated April 1, 2013, This permit, Issued on April 20, 2013, Is subject to compliance with the application and site drawing (where consistent with the permit), all applicable regulations and special conditions and notes set forth below, Any violation of these terms may subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void. This permit authorizes: The construction of a walkway. (1) All proposed development and associated construction must be done in accordance with the permitted work plat drawings(s) dated received on April 1, 2013. (2) All construction must conform to the N.C. Building Code requirements and all other local, State and Federal regulations, applicable local ordinances and FEMA Flood Regulations. (3) Any change or changes in the plans for development, construction, or land use activities will require a re-evaluation and modification of this permit. (4) A copy of this permit shall be posted or available on site. Contact this office at 262-728-8545 for a final inspection at completion of work. (5) Pursuant to 15A NCAC, Subchapter 7J.0406 (b), this permit may not be assigned, transferred, sold or otherwise disposed of to a third -party. (Additional Permit Conditions on Page 2) This permit acfton may be appealed by the perrnlitee or other qualified persons within twenty (20) days of the Issuing date. From the date of an appeal, any work oonducted under this permit must cease until the appeal is resolved. This permll must be on the proled alte and accessible to the permit offleer when the praect is Inspected for compliance. Any maintenance work or project modificaflon not oovered under this permlt, require further written permit approval, All work must cease when this permit expires on: DECEMBER 31, 2016 In Issuing this permit It Is agreed that this project Is consistent with the local Land Use Plan and all applicable ordinances. This permit mey not be transferred to another parry without the written approval of the Division of Coastal Management J.D. O'Neal CAMA LOCAL PERMIT OFFICIAL 402 Broad Street Beaufort, NC 28516 PERMITTEE (Signature required if conditions above apply, to permit) 05/96/2013 MON 9! 08 FAX -4 -+ CAMA U002/002 Name: Mack Baker Minor Penult # 692.13 Date: April 20, 2013 Page 2 (6) The amount of impervious surface shall not exceed 25% of the lot area within 575 feet of Normal High Water (Estuarine Shoreline - ORW Area of Environmental Concern), In this case,12,632,400 square feet is authorized, (7) Unless specifically allowed in 15A NCAC 07H. 0209(d)(10), and shown on the permitted plan drawing, all development/construction shall be located a distance of 30 feet landward of Normal High Water. No portion of the roof overhang shall encroach into the 30 ft. buffer, (8) All unconsolidated material resulting from associated grading and landscaping shall be retained on site by effective sedimentation and erosion control measures. Prior to any land -disturbing activities, a barrier line of filter cloth must be installed between the land disturbing actIvlty and the adjacent marsh or water areas, until such time as the area has been property stabilized with a vegetative cover. (9) Any proposed for grading within the 39 buffer from the Normal High Water must be contoured to prevent additional stormwater runoff to the adjacent marsh. This area shall be immediately vegetatively stabilized, and must remain in a vegetated state. (10) All other disturbed areas shall be vegetatively stabilized (planted and mulched) withln 14 days of construction completion. (11) Prior to any development, silt fence shall be properly installed between all planned land disturbance and the adjacent marsh and open water areas; the silt fence shall be properly maintained throughout the construction period, Silt fence shall be Installed such that ft Is properly toed -In to the soli, (12) This permit does not authorize development within any wetlands or open water areas. SIGNATURE:.Z&,W&k DATE: PERMITrEE THff S PAGE WAS MIERT ED BY ��� � e � ��� l P� ( I II► ��> � I� l l e l� ��► I I I I ��� o� u FOLLOWING DOCUMENT(S) ARE OO OR QUALITY EVERY REASONABLE ATTEMPT WAS MADE TO IMPROVE THE QUALITY OF THE DOCUMENT(S) .... . ..... Iv 11 P A i A ail P) I r. m :_.. .. ,,....,,lL ! f-., 4 "r A "�. i�'ir„� LFll;i',. t�lli, tai�:4..�. ",.e r., n i!7N �f �. ague �r.. ra ..`; ". {.'d � ?y. •i� n U003/004 04/03/2013 WED 7: 16 FAX ' -.-b-b CAHA I i •�• may. PF tN n 04/03/2013 WED 7:16 FAX CAMA U004/004 •CAMA PROJECT CKTNG ET- CARTERET COMM Applicant's Name: (f� a r� � & � e & Date submitted: Property Address; `��� ti c.p PIN #: 3 r U Phone #; _ a'� l ZD4 Area of parcel in AEC:.0/'S1Q9-i &60— square feet acres Proposed Impervious area: square feet Total impervious area allowed:_ Oj k$o Iftsquare feet 575' OR ; 75' AEC T EXEMPTION 42 - f 3 Riparian Rights Statements / Certified Letters in fleXES4—Np to of Site Visits! — 0ZL5 &PPlication considered accurate and complete for processing Date:�—A- 24 (3 LPO(initi Application returned for the following reasons: Date Returned: The following site -specific observations have been made: 1 The following conditions are to be included on the permit (in addition to standard conditions): (Circle condition number) 1.-4 0 a) 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 E) 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 . 59 Other Note LP 4 lJ Date: .. z 0 Follow-up date visits: 1 Project determined to be in compliance with permit Final Inspection Date: 3 Project determined to be out of compliance with permit Action taken to bring project in compliance with CAMA: LPO: Date: