HomeMy WebLinkAbout263-05_Skinner, Robert_2005011101/06/2005 18:03 3933205 WESTERN OFF PAGE 01
�1
Katrina F. Marshall, AICP
Director
CARTERET COUNTY
DEPARTMENT OF
PLANNING & DEVELOPMENT
Main Office:
Courthouse Square
Beaufort, NC 28516-1898
Tel: (252) 728-8497
(252) 728-8545
Fax: (252) 728-6643
LAMA PUBLIC NOTIQE
Western Office:
701 Cedar Point Blvd.
Cedar Point, NC 28584-8013
Tel: (252) 393-3204
Fax: (252) 393-3205
Pursuant to NCGS 113A-119(b) , Carteret County, a locality authorized to issue
CAMA perm its in area s of env iromrnental conce rn, hereby gives notice that on January 6,
2005, John W. Dudlcy, , dba Dudley's Marina, applied f or a CAMA Minor Perm it to
replace existing fuel lines, install flea piping and sump sen sons on his property located at
106 Cedar Point Boulevard, Cedar Point, N-C.
The applicat ion may be inspect ed at the address below. Public comments
received by January 17, 2005 will be considered up to the time of pe rmiit decision.
Project modifications may occur based on further review and upon comments. Notice of
the pe rmit decision in this matter will be provided upon written re quest.
Tracy Barnes
CAMA Local Permit Officer
Cart ere t County
Western Pe rmit Office
701 Cedar Point Boulev and
Cedar Point, NC 28584
Please publish on:
Sunday, January 9, 2005
Req ucs t to return Affidavit of Publicat ion
as soon as possible.
01/11/2005
18:51 2527286643
CARTERET CTY P I
PAGE 01 lta
Katrina F. Marshall, AICP
Director
DATE:
NAM
CARTERET COUNTY
DEPARTMENT OF
PLANNING & DEVELOPMENT
Main Office;
Courthouse Square
Beaufort, NC 28516-1898
Tel: (252) 728-8497
Fax: (252) 728-6643
ADDRESS; ,& .6L
CITY: "ATE:
Dear .
Western Office:
701 Cedar Point Blvd.
Cedar Point, NC 28584-8013
Tei: (252) 393-3204
Fax: (252) 393-3205
EXEMPTED PROJECT (MINOR)
EXEMPTION #: -�
We have received the information submitted to this office in your inquiry concerning the necessity of
filing an application for a minor development permit under the Coastal Area Management Act. The
activity you propose is exempt from needing a minor development permit providing it complies with
the conditions specified below. If your plans should change and your project will no longer meet
these conditions, please contact me before proceeding,
DESCRIPTION OF ACTIVITY AND CONDITIONS:
Conditions: Any change In this proposal shall be reevaluated by the CAMA Officer. A building
permit is required. Construction must be performed in accordance with the permitted work plat
originally submitted All construction must conform to the North Carolina Buildin
Code requirements an a o er ooa , g
State, and Federal regulations. g
1. The amount of impervious surface areas shall not exceed 30% of the lot area within the 75'
Area of Environmental Concern (AEC); in this case,
square foot.
2• The amount of built -upon area shall be limited to no more than 25% of the Outstanding
Resource Water (ORW) area of land to be developed; in this case,
square feet.
ezanlptlon.lnspectom
01/11/2005 18:51 2527286643 CARTERET CTY P I PAGE 02
3. In order to prevent sedimentation, a vegetated buffer zone must be maintained between all
disturbed areas and the adjacent water body or marsh. In this case, a
wide buffer has been accepted. foot
4. Prior to initiating any land -disturbing activities, a barrier line of filter cloth, staked hay bales,
or burlap must be installed between the land -disturbing activity and the adjacent marsh or
water areas, until such time as the area has been properly stabilized with a vegetated
cover.
5. The applicant has effectively demonstrated, through Innovative construction design, that
the amount of impervious surface areas may be exceeded in a way that runoff water will be
managed and the AEC protected so as to all
surface areas within the AEC. percentage of impervious
Pursuant to 15 NCAC, subchapter 7J.0406(b), this permit
transferred, sold, or otherwise disposed of to a third party may not be assigned,
QStormwater collection systems are prohibited.
A 30-foot buffer zone must be provided from the mean high g waterline (normal waterline).
This certification of exemption from requiring a CAMA permit is valid for ninety (90) days from the
date of issuance, Following expiration, a review of the project and project site may be necessary to
renew this certification. ry
LOCATION OF PROJECT:
Sincerely,
Local Permit Officer
Carteret County
(252) 728-8545
axemptlon,inypeaors
2
01/11/2005 18:51 2527286643 CARTERET CTY P I PAGE 03
1 RACKING SHEET 1110100
libe(4 5Applicant's Name;n�
Property Address: �313
Dates of Si
to Visits: /_��� N � .r•,..
Exemption: ✓ y
Permit ❑ Number:
❑ Application to be returned for the following reasons:
------------
Date Returned:
Application considered accurate and complete for processin ? r
❑9 —�� Date:
The following• si{L9-SFieclffc observations have been made:
-------------
The following conditions to be included an the permit m
C addrbon to standard conditions): •
L O: fox
Date:
fates of follow-up visits:
=final inspection Date:
❑ Project determined to be in compliance with permit
❑ Project determined to be ()ut of compliance with permit
ction taken to bring project into compliance with CAMA:
Date;
01/11/2005 18:51 2527286643 CARTERET CTY P I PAGE 04
PLANNING & INSPECTIONS DEPARTMENT 0
CARTERET COUNTY, NORTH CAROLINA
DATE: 0
PIN #:
APPLICANT:flb�R-�
3
a
►ppiicant
+ SHOW PROPERTY LINES WITH
DIMENSIONS
+ SHOW PROPOSED STRUCTURE (WITH
APPROXIMATE .DIMENSIONS)
MOW ANY OTHER EXISTING
STRUCTURES ON PROPERTY
LAB& DISTANCE TO ALL PROPERTY
LINES FROM PROPOSED STRUCTURE
LABEL ROAD, FRONT, REAR, AND SIDS
DRAW PLOT PLAN BELOW
Zoning Official Initials