Loading...
HomeMy WebLinkAbout273-05_Bohn, Brian_200503071 03/06/2005 20:13 2527286643 CARTERET CTY P I PAGE 02 Katrina F. Marshall, AICP hector DATE• CARTERET COUNTY DEPARTMENT OF PLANNING & DEVELOPMENT Main Office: Courthouse Square Beaufort. NC 28616-1898 Tel: (252) 728-8497 (252)728-8545 Fax: (252) 728-6643 NAME--ZL &11-m ADDRESS:I21 Q- CITY: STATE: Dear. Westem Office: 701 Cedar Point Blvd. Cedar Point, NC 28584-8013 Tel: (252) 393-3204 Fax: (252) 393-3205 EXEMPTED PROJECT (MINOR) EXEMPTION f#: -44 2-n We have received the information submitted to this office in your inquiry concerning the necessity of filing an application for a minor development permit under the Coastal Area Management Act. The activity you propose Is exempt from needing a minor development permit providing it complies with the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. DESCRIPTION OF ACTIVITY AND CONDITIONS; Conditions: Any change! in this proposal shall be reevaluated by the CAMA Officer. A building permit is required. Construction must be performed in accordance with the permitted work plat originally submitted � . All construction must conform to the North Carolina Building Code requirements an a o er oca , State, and Federal regulations. IN ADDITION THE CONDITIONS CIRCLED BELOW APPLY: The amount of impervious surface areas shall not excee of the lot area within the 75' _NaArea of Environmental Concern (AEC); in this case, square foot. 2. The amount of built -upon area shall be limited to no more than 25% of the Outstanding Resource Water (ORW) area of land to be developed; in this case, square feet. e=mptlon.inspedors , 03/06/2005 20:13 2527286643 CARTERET CTY P I PAGE 03 3. In order to prevent sedimentation, a vegetated buffer zone must be! maintained between all disturbed areas and the adjacent water body or marsh. In this case, a foot wide buffer has been accepted. 4. Prior to initiating any land -disturbing activities, a barrier line of filter !cloth, staked hay bales, or burlap must be installed between the land -disturbing activity and'the adjacent marsh or water areas, until such time as the area has been properly stabilized with a vegetated cover. 5. The applicant has effectively demonstrated, through innovative construction design, that the amount of impervious surface areas may be exceeded in a way!that runoff water will be managed and the AEC protected so as to allpercenta�a of Impervious surface areas within the AEC. to Pursuant to 1 S NCAC, subchapter 7J.0406(b), this permit may not be assigned, transferred, sold, or otherwise disposed of to a third party. 7. Stormwater collection systems are prohibited. ! A 30-foot buffer zone must be provided from the mean high water lln' (normal water line). This certification of exemption from requiring a CAMA permit is valid for ninety !(90) days from the date of issuance. Following expiration, a review of the project and project site tray be necessary to renew this certification. LOCATION OF PROJECT: Sincerely, RU C� IL�.a•�-� - Local Permit Officer Carteret County (252) 728-8545 WAF!I / exemption. inspectors 2 ree u rn i� Loan asc.u) W�• °'� �__-s_ roc — '•� Ls ^---- mrr �a4f r ^ ' QON6 •D10 q Ljj Ld l fax' x' R' Ni OCAA IV *Sal � -�� • 1Rayo � s+v' � N :1 i�1C3L' - ~• N t • a �]� IDgi - N QB jet m to N m N LD m M m SVRVEY FOA -AQBFRT ,•'MCCORNlAd-K srucr5 %4/P Ci1Rrrfxr GO, , N.G, - i la .. , ,,� p � e.N. sire Ndry ie G 03/06/2005 20:13 2527286643 � AcGKENG S}-jEET PAGE 01 � Applicant's Name:1 . � aL1 X Ll C) 0:7d• . c�r . Property Address: ^ ` -1-0 bLAIkheQa J k Dates of S' a Vsits: "i Exemption: Permit: Number: Application to be retumed for the following reasons: Date Returned: Application considered accurate and complete for processing? Date: --L�'M The foliowing_sife-specific observations have been made: •The following conditions to be lncluded on the permit (in addition to standard conditions):_ Date: 3 Dates of follow-up visits; Final Inspection Date:, Project determined to be In compliance with permit Project determined to be out of compliance with permit Action taken to bring project into compliance with CAMA: LPQ; Date: