Loading...
HomeMy WebLinkAbout147-03_Salter, James G_2003100810/05/2003 21:07 2527286643 Carteret County Department of Planning Courthouse Square Beaufort, NC 28516-1898 (252) 728-8497 Office (252) 728-6643 Fax DATE: _ _ - k NAME' &" r'S ADDRESS: 07;L -tSC - it D CITY: !y ► -T I I STATE: N' �- CARTERET CTY P I PAGE 02 11 EXEMPTED PROJECT (MINOR) EXEMPTION #: 14 �1_ D3 We have received the information submitted to this office in your inquiry concerning the necessity of fling an application for a minor development permit under the Coastal Area Management Act. The activity you propose Is exempt from needing a minor development permit providing it complies with the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding, DESCRIPTION OF ACTIVITY AND CONDITIONS: Activity: C .S 74 u e 1- s{ l a s, a.rc,- 3 7 J_ 0c k S ec,r,, Q Conditions: Any change in this proposal shall be reevaluated by the CAMA Officer. A building permit is required. Construction must be performed in accordance with the permitted work plat originally submitted All construction must conform to the North Carolina Building Code requirements and a o er oca , State, and Federal regulations. N ADDITION THE CONDITIONS CIRCLED BELOW APPLY: �. The amount of impervious surface areas shall not exceed 30% of the lot area within the 75' Area of Environmental Concern (AEC); in this case, square foot. The amount of built -upon area shall be limited to no more than 25% of the Outstanding Resource Water (ORW) area of land to be developed; in this case, square feet. Qxern0QnAnspe=rs 10/05/2003 21:07 2527286643 CARTERET CTY P I PAGE 03 3. In order to prevent sedimentation, a vegetated buffer zone must be maintained between all disturbed areas and the adjacent water body or marsh. In this case, a foot wide buffer has been accepted. 4. Prior to initiating any land -disturbing activities, a barrier line of filter cloth, staked hay bales, or buriap must be installed between the land -disturbing activity and the adjacent marsh or water areas, until such time as the area has been properly stabilized with a vegetated cover. 5. The applicant has effectively demonstrated, through innovative construction design, that the amount of impervious surface areas may be exceeded in a way that runoff water will be managed and the AEC protected so as to all percentage of impervious surface areas within the AEC. Pursuant to 15 NCAC, subchapter 710406(b), this permit may not be assigned, transferred, sold, or otherwise disposed of to a third parry. 7. Stormwater collection systems are prohibited. UA 30-foot buffer zone must be provided from the mean high water line (normal water line). This certification of exemption from requiring a CAMA permit is valid for ninety (90) days from the date of issuance. Following expiration, a review of the project and project site may be necessary to renew this certification. LOCATION OF PROJECT: 110%� f L R D , ��k� S( Sincerely, Local Permit Officer Carteret County (252) 728-8545 exnmption.inspeaors 11 Nr Ex Is�7iijs Hat,5 70 S� F7► W _ � oQ r ' I � f � i • so ao ' 1 8456r IiEI.Id" z 1495 5414 5495 f]�IiTiQl t a i 3 q6�• , n g e • e 6491 7461 433 8369 v _ w �0 - 5363 PRE ~ 13;0 n 3209 422- � 7 7206 925 4274 7283 , i 4169 `0 / G 5135 1'j `4RTEj 7124 CA- �, d� r 817t sobs ' DEX NOR] N 7044 % 7335. 9 g SUBDIV N � ' m N too m m N ada In m ! m /0 �� 10/05/2003 21:07 2527286643 CARTERET CTY P I PAGE 01 CAMA PROJECT TRACKING SHEET Prooertv Address: Dates of Site Visits: Exemption: �r Permit: Number: '10 aApplication to be returned for the following reasons: Date Returned: Application considered accurate and complete for processing? Date: �RKI-40 3 The following site specific observations have been made: The following conditions to be included on the permit (in addition to standard conditions): LPO :��,Date: Dates of follow-up visits: Final Inspection Date: 0 Project determined to be in compliance with permit DProject determined to be out of compliance with permit Action taken to bring project into compliance with CAMA: LPO: Date: