Loading...
HomeMy WebLinkAbout138-03_McGee, Steve_2003082108/21/2003 16:29 2527286643 CARTERET CTY P I PAGE 02 Carteret County Department of planning Courthouse Square Beaufort, NC 28516-1898 (252) 728-8497 Office (252) 728-6643 Fax Dear C rl�� A«jY4� I G� XEMPTED PROJECT (MINOR) EXEMPTION #: LLD-� We have received the information submitted to this office in your inquiry concerning the necess' of filing an application for a minor development permit under the Coastal Area Management Act. The activity you propose is exempt from needing a minor development permit providing it complies with the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. DESCRIPTION OF ACTIVITY AND CONDITIONS: Conditions: Any change in this proposal shall be reevaluated by the CAMA Officer. A building permit is required. Construction must be performed in accordance with the permitted work plat originally submitted . All construction must conform to the North Carolina Building Code requirements d-n-d all other ocaT State, and Federal regulations. IN ADDITION THE CONDITIONS CIRCLED BELOW APPLY: • The amount of impervious surface areas shall not exceed 30% of the lot area within the 75' Area of Environmental Concern (AEC); in this case, _ square foot. The amount of built -upon area shall be limited to no more than 25% of the Outstandin Resource Waiter (ORW) area of land to be developed; in this case 9 square feet. �(p D6 exemption. in apectors 08/21/2003 16:29 2527286643 CARTERET CTY P I PAGE 03 3. In order to prevent sedimentation, a vegetated buffer zone must be maintained between all disturbed areas and the adjacent water body or marsh. In this case, a foot wide buffer has been accepted. 4. Prior to initiating any land -disturbing activities, a barrier line of filter cloth, staked hay bales, or burlap must be installed between the land -disturbing activity and the adjacent marsh or water areas, until such time as the area has been properly stabilized with a vegetated cover. 5. The applicant has effectively demonstrated, through innovative construction design, that the amount of impervious surface areas may be exceeded in a way that runoff water will be managed and the AEC protected so as to all percentage of Impervious surface areas within the AEC. Pursuant to 15 NCAC, subchapter 7J.0406(b), this permit may not be assigned, transferred, sold, or otherwise disposed of to a third party. y 7. Stormwaiter collection systems are prohibited. PA 30-foot buffer zone must be provided from the mean high water line (normal water line). This certification of exemption from requiring a CAMA permit is valid for ninety (90) days from the date of issuance. Following expiration, a review of the project and project site may be necessary to renew this certification. LOCATION OF PROJECT: Sincerely, 0,-,4 Local Permit Officer Carteret County (252) 728-8545 exemptto n. i nspectors 08/21/2003 16:29 2527286643 02/97/2003 16:31 910a8524 1 Rug 07 08 04ti4a a'Boo i0riRnkims . E8lal/ma Ism 118402431 pp� a' CARTERET CTY P I PAGE 04 HEBICYCLESiOP _ WAGE B1 [st839i1��006 p.l y. TI�QICYC�6SKJP � A] lb cm v,#% ►f May cp rtX.�J 44L4 "o, PL4fo.�." tSOAP4 A7rm %a poohp as 08/21/2003 16:29 2527286643 CARTERET CTY P I PAGE 05 SH/07/2003 1.7; 04 9:©4952437' THEMICYCLEsMCP PACE 6i btu u ft&L, No can,�.c�1� '"Tb �tLl li.• C10"A C4fw-4L bl� v�.r c•✓K`� PGo��.�s� 9-1 T54, L L 08/21/2003 16:29 2527286643 CARTERET CTY P I PAGE 01 CAMA PROJECT TRACKING SHEET Applicants Name / F a ` Property Address: d � � a Dates of Site Visits: Exemption:. Permit: Number: 39'D3 j Application to be returned for the following reasons: Date Returned: Application considered accurate and complete for processing?- Date: g- ;Z /'D 3 The following, site -specific observations have been made: The following conditions to be included on the permit (in addition to standard conditions): LPOC�� Date: O 3 Dates of follow-up visits. Final Inspection Date: Project determined to be in compliance with permit Project determined to be out of compliance with permit Action taken to bring project into compliance with CAMA: LPO: Date: