Loading...
HomeMy WebLinkAbout98-140_Shoffner, Kris_199807319Vagor CVera C. CmIdw 9*90rCPro Clem Cordon 94. 9nc- dams Commimlonem 91cbard.G Ogle 9tobed 9. 9aenbour CIom 91ooaer, 8r. cBarbara W. 91arHi Kris Shoffner 8729 Emerald Plantation Rd Emerald Isle, NC 28594 C/Re '1 omn of emerald isle 7500 (5merald T ve Emerald 9sle, %Hb Carolina 2d594-9320 CPbone (252) 354 3424 CTax. (952) 354 5066 RE: EX 98-140 7406 Sound Dr Dear Ms. Shoffher: July 31, 1998 CPele CC4llen Clomn 9n2nager 4 AUG 0 6 1998 We have reviewed the information submitted to this office in your request to construct a pier, and/or boadift, and find you are exempt from needing a Minor Development Permit as long as it meets the specifications below: Your letters have been received and are on file in this office to the adjoining property owners to advise of the project: All pilings shall be a minimum of 6"x6" square and shall have an 8' minimum tip penetration. Prior to construction, piling depths must be certified, either by an engineer or having the building inspector on site at the time of piling placement; Construction must conform to all applicable state and local construction requirements as illustrated in Bogue Sound Pier/Boat Lift Specifications (Section 6-84); A pier must not exceed 200' in length, or 4' of water at low tide, not to exceed 200 square feet for any tee(s); nor shall the pier exceed 6' in width at any point; The platform of the tee may not cover marshlands. Any variation of the above will require a CAMA permit; also, this certification of exemption from requiring a CAMA permit is valid for 90 days from the date of issuance Following expiration, a re-examination of the project and project site may be necessary to renew this certification. Sincerely,