HomeMy WebLinkAbout98-140_Shoffner, Kris_199807319Vagor
CVera C. CmIdw
9*90rCPro Clem
Cordon 94. 9nc- dams
Commimlonem
91cbard.G Ogle
9tobed 9. 9aenbour
CIom 91ooaer, 8r.
cBarbara W. 91arHi
Kris Shoffner
8729 Emerald Plantation Rd
Emerald Isle, NC 28594
C/Re '1 omn of emerald isle
7500 (5merald T ve
Emerald 9sle, %Hb Carolina 2d594-9320
CPbone (252) 354 3424 CTax. (952) 354 5066
RE: EX 98-140 7406 Sound Dr
Dear Ms. Shoffher:
July 31, 1998
CPele CC4llen
Clomn 9n2nager
4
AUG 0 6 1998
We have reviewed the information submitted to this office in your request to construct a pier, and/or boadift, and
find you are exempt from needing a Minor Development Permit as long as it meets the specifications below:
Your letters have been received and are on file in this office to the adjoining property owners to
advise of the project:
All pilings shall be a minimum of 6"x6" square and shall have an 8' minimum tip penetration.
Prior to construction, piling depths must be certified, either by an engineer or having the building
inspector on site at the time of piling placement;
Construction must conform to all applicable state and local construction requirements as illustrated
in Bogue Sound Pier/Boat Lift Specifications (Section 6-84);
A pier must not exceed 200' in length, or 4' of water at low tide, not to exceed 200 square feet
for any tee(s); nor shall the pier exceed 6' in width at any point;
The platform of the tee may not cover marshlands.
Any variation of the above will require a CAMA permit; also, this certification of exemption from requiring a
CAMA permit is valid for 90 days from the date of issuance Following expiration, a re-examination of the
project and project site may be necessary to renew this certification.
Sincerely,