Loading...
HomeMy WebLinkAbout98-137_Howard, James_199807319Veyor Tera C. Gasktns 9vayor'Pro cTem Gordon 9. 9i1c-%dams Commlasloners Rkbard.G 971e lobed 9?. 9senbour cTom 9l000er, 6r. CBarbwa 9n C}larda Mr. James Howard 4659 Mark Smith Rd Deep Run, NC 28525 RE: EX 98-137 Dear Mr. Howard: � 77�e mown of emerald isle 7500 Smerald Drive &merald We. 9Yodb Carolina 2d594-9320 %one (252) 354 3424 Tax. (252) 354 50M July 31, 1998 222 N Shorewood Dr Drive AU 6s�1 t-c1I �i Ilan 1i 9vanag¢r We have reviewed the information submitted to this office in your request to construct a pier, and/or boatlift, and find you are exempt from needing a Minor Development Permit as long as it meets the specifications below: Your letters have been received and are on file in this office to the adjoining property owners to advise of the project: All pilings shall be a minimum of 6"x6" square and shall have an 8' minimum tip penetration. Prior to construction, piling depths must be certified, either by an engineer or having the building inspector on site at the time of piling placement; Construction must conform to all applicable state and local construction requirements as illustrated in Bogue Sound Pier/Boat Lift Specifications (Section 6-84); A pier must not exceed 200' in length, or 4' of water at low tide, not to exceed 200 square feet for any tee(s); nor shall the pier exceed 6' in width at any point; The platform of the tee may not cover marshlands. Any variation of the above will require a CAMA permit; also, this certification of exemption from requiring a CAMA permit is valid for 90 days from the date of issuance. Following expiration, a re-examination of the project and project site may be necessary to renew this certification. Sincerely, Carol Local CAMA Permit Officer 97'Tamilrf, beach