HomeMy WebLinkAbout98-135_Batten, David_199807209%or
Tera C. Gasldns
I'5*yor 9ro'rem
Cordon 9?. 9nc-Wdams
Commissloners
916ard.L ale
9?oberl 9?. 9senbour
9-om 91000er. f%r.
CBarbara 9n 9&rrls
Mr. David Batten
C/o Julia Wax
Emerald Isle Realty
7501 Emerald Dr
Emerald Isle, NC 28594
RE: EX 98-135
Dear Mr. Batten
the 11 ornn of emerald isle
7500 Emerald Odoe
Emerald 9sle, 9Xorth Carolina 2M94-9320
%one (252) 354 3424 Tax. (252) 354 5068
1708 Emerald Drive
July 20,_ f998
cTele 5711en
Conn 9vnnager
OCT 0 V �V
We have reviewed the information submitted to this office in your request to construct a pier, and/or boatlift, and
find you are exempt from needing a Minor Development Permit as long as it meets the specifications below:
Your letters have been received and are on file in this office to the adjoining property owners to
advise of the project:
All pilings shall be a minimum of 6"x6" square and shall have an 8' minimum tip penetration.
Prior to construction, piling depths must be certified, either by an engineer or having the building
inspector on site at the time of piling placement;
Construction must conform to all applicable state and local construction requirements as illustrated
in Bogue Sound Pier/Boat Lift Specifications (Section 6-84);
A pier must not exceed 200' in length, or 4' of water at low tide, not to exceed 200 square feet
for any tee(s); nor shall the pier exceed 6' in width at any point;
The platform of the tee may not cover marshlands.
Any variation of the above will require a CAMA permit; also, this certification of exemption from requiring a
CAMA permit is valid for 90 days from the date of issuance. Following expiration, a re-examination of the project
and project site may be necessary to renew this certification.
Sincerely,
Carol Angus r ( �.
Local CAMA Permit Officer b
j
97'Temilrf, beech