Loading...
HomeMy WebLinkAbout66-94_Shaw, Howell_19940718' e . Z TOWN OF ATLANTIC BEACH L5vo_�� JUL 1 g 19% 125 WEST FORT MACON ROAD ATLANTIC BEACH, NORTH CAROLINA _=_w� July 15, 1994 Mr. Howell Shaw 5300 Oliver Court Clayton, NC 27520 REFERENCE: Exempted Project (CAMA Project #66-94) Exempted #2, 217 Northshore MHP Dear Mr. Shaw: We have reviewed the information submitted to this office in your inquiry concerning the necessity of filing an application for a minor development permit under the the Area Management Act. The activity you propose is exempt from needing a minor development permit as long as it meets the conditions specified below. If your plans should change and your project will no longer meet those conditions, please contact me before proceeding. DESCRIPTION OF ACTIVITY AND CONDITIONS: According to your contractor, you propose to construct a 4 x 19 pier and 4 x 24 pier located at 217 Northshore MHP, Atlantic Beach, NC. Private, non-commercial piers/boatlifts/mooring facilities may be constructed if it does not exceed 200' in total length offshore; is not within 150' of a federally maintained channel, does not extend beyond the 4' mean low water contour line or normal water level, (whichever is applicable) of the waterbody; does not exceed 6' in width; does not include an enclosed structure; and, does not interfere with established navigation rights. The 4' mean low water restriction shall not apply to piers/boatlifts/mooring facilities constructed on man-made canals and basins. It may be built through wetland vegetation only if elevated and may have a T-head or platform not exceeding 500 square feet in area at its waterward end if no wetland areas are covered. The pier/boatlift/mooring facilities must be set back a minimum of 15' from the adjacent property owner's area of riparian access unless waived by a written agreement. Confirmation must also be given that written statements have been obtained from adjacent riparian property owners indicating that they have no objections to the proposed construction. The pier/boatlift/mooring facilities shall not extend beyond the established pier length along the same shoreline for similar use, and in no case, extend more than one-third (1/3) of the width of the waterbody and shall not interfere with shellfish franchises or leases. Also, piers/boatlifts/mooring facilities authorized by this exemption shall be for the exclusive use of the landowners, and shall not provide either leased or rented docking space or any other commercial services. Piers/boatlifts/mooring facilities designed to provide docking space for more than four (4) boats shall, because of their POST OFFICE BOX 10 0 ATLANTIC BEACH, NORTH CAROLINA 28512 • (919) 726-2121 • FAX (919) 726-5115 Mr. Howell Shaw July 15, 1994 Page -2- greater potential for adverse impacts, be reviewed through the permitting process, and are, therefore, not authorized by this exemption. This certification of exemption from requiring a LAMA permit is valid for ninety (90) days from the date of issuance. Following expiration, a reexamination of the project and project site may be necessary to renew this certification. Sincerely, ' L� �eenM. Benton Local CAMA Officer for the Town of Atlantic Beach cc: Charles Pigott Cliff Winefordner �T LA FT 1 O LJ IT CAL LD 7� 0