HomeMy WebLinkAbout115-94_Garner, Leslie_19941212TOWN OF ATLANTIC BEACH
125 WEST FORT MACON ROAD
ATLANTIC BEACH, NORTH CAROLINA
December 9, 1994
Mr. Leslie Garner
P.O. Drawer 3514
Greenville, NC 27836
REFERENCE: Exempted Project (CAMA Project #115-94)
Exempted #2, 410 Davis Blvd.
Dear Mr. Garner:
We have reviewed the information submitted to this office in your inquiry
concerning the necessity of filing an application for a minor development permit
under the Coastal Area Management Act. The activity you propose is exempt from
needing a minor development permit as long as it meets the conditions specified
below. If your plans should change and your project will no longer meet those
conditions, please contact me before proceeding.
DESCRIPTION OF ACTIVITY AND CONDITIONS: According to your contractor, you
propose to install a boatlift in an existing boat slip located at 410 Davis
Blvd., Atlantic Beach, NC.
Private, non-commercial piers/boatlifts/mooring facilities may be constructed if
it does not exceed 200' in total length offshore; is not within 150' of a
federally maintained channel, does not extend beyond the 4' mean low water
contour line or normal water level, (whichever is applicable) of the waterbody;
does not exceed 6'"in width; does not include an enclosed structure; and, does
not interfere with established navigation rights. The 4' mean low water
restriction shall not apply to piers/boatlifts/mooring facilities constructed on
man-made canals and basins. It may be built through wetland vegetation only if
elevated and may have a T-head or platform not exceeding 500 square feet in area
at its waterward end if no wetland areas are covered. The pier/boatlift/mooring
facilities must be set back a minimum of 15' from the adjacent property owner's
area of riparian access unless waived by a written agreement. Confirmation must
also be given that written statements have been obtained from adjacent riparian
property owners indicating that they have no objections to the proposed
construction. The pier/boat lift/mooring facilities shall not extend beyond the
established pier length along the same shoreline for similar use, and in no case,
extend more than one-third (1/3) of the width of the waterbody and shall not
interfere with shellfish franchises or leases. Also, piers/boatlifts/mooring
facilities authorized by this exemption shall be for the exclusive use of the
landowners, and shall not provide either leased or rented docking space or any
other commercial services. Piers/boatlifts/mooring facilities designed to
provide docking space for more than four (4) boats shall, because of their
POST OFFICE BOX 10 • ATLANTIC BEACH, NORTH CAROLINA 28512 i (919) 726-8380 9 FAX' (919) 726-5115
r
Mr. Leslie Garner
December 9, 1994
Page -2-
greater potential for adverse impacts, be reviewed through the permitting
process, and are, therefore, not authorized by this exemption.
This certification of exemption from requiring a CAMA permit is valid for ninety
(90) days from the date of issuance. Following expiration, a reexamination of
the project and project site may be necessary to renew this certification.
Sincerely,
Voy C. Wood
al CAMA Officer for the
Town of Atlantic Beach
cc: Charles Pigott
Cliff Winefordner
1-1
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (FOR A-FiER)
PORT L(FT
I hereby certify that I own property adjacent to L �P�N� is
property located at `btuis '-RLU I >
M� (lot, block, road, etc.)
on i � m N A�� C �iCk in i`�1 L �C —,N.C.
(water body) (town and/or county)
He has described to me as shown below the development he is proposing at that location
and I have no objections to his proposal. I understand that a pier must be set back a
minimum distance of 15 feet from my area of riparian access unless waived by me.
0cle
do not wish to waive that setback requirement.
one)
Description and/or drawing of proposed development
proposing development)bQD
(to be filled in by individual
5�
Signature
LDS CLN t2-
Name
-7a6 -�33
Phone Number
0
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (FOR AIR}'
I hereby certify that I own property adjacent to Les Pg t4 is V- 's
property located at -V)kk)lS `BLUE
(lot, block, road, etc.)
on IMP f\"NV\-K-E CAP A-L- in ft-TLhtfnC 3C-4 _ , N.C.
(water body) (town county)
He has described to me as shown below the development he is proposing at that location
and I have no objections to his proposal. I understand that a pier must be set back a
minimum distance of 15 feet from my area of riparian access unless waived by me.
I do do no ish to waive that setback requirement.
(circle one)
Description and/or drawing of proposed development: (to be filled in by individual
proposing development)
7
Signature
AP41-0 s
Name
Phone Number