Loading...
HomeMy WebLinkAbout93-0003_Andrews, James Richard_19930224rj rR 6 1993 ' G PAMLICO COUNTY BUILDING INSPECTIONS P.O.Boa 776 B//avboro, N. C. 2851..5)) 745-3861 Owner's Name�:�.l' C �/i/ 'ermit 4k e _-Cael Location '2 Tel.0 Ready for Inspection-✓')'")_10� Requested Date for Inspection 1st call/Reinspection Loc ed Unlocked_ Contractor's Name License# Type of Inspection Approved Disapproved Bulkhead/Pier.......... ....... Mobile Home... (Size ) _ tAI/i.S.I,a • " "7— t•—eto-lrer .- . Flood Zone/Elevation T� Framing..... .................. Electrical..(Power Co. )... Plumbing ........................ Mechanical ...................... Insulation...................... Pre -Final... .................. FINAL... ........ ........... REMARKS-/D_/?�� %�a7�/� If any of the above inspections are marked disapproved, discrepancies must be corrected and a re -inspection scheduled and approved before const. can continue. A mobile home must be approved before the power co. can be notified. • Date inspected Time Inspector's Si atur P � e o County Government 93-0003 Permit Nip • CAMA MINOR DEVELOPMENT I FRMIT as authorized by the State of North Carolina, Department of Natural Resources and Community Development and the Coastal Resources Commission for develop- ment in an area of environmental concern pursuant to Section 113A-118 of the ' General Statutes, "Coastal Area Management."- Issued to James Richard Andrews authorizing developmentin "' Oriental at Lot#15 Main Sail Point QPt a channel of iiog Pen Gut and Green Creek O$SR1308as requested: in the permittee's application{dated2/15/9-4 This permit, issued one { 2/24/93 and amended 4/22/930'� �, is subject to'comp liance with the application and site drawing (where consistent with the permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action; or may cause the permit to be null and void. *Amended to allow cutting of trees on channel 1.i Al proposed, development and associated construction must be done in accordance with the permitted workplat drawing as originally submitted. 2. All construction must conforn to the N. C:.Building-Code requirements and all ,other Local,;, State and Federal regulations. 3. Any change or. changes in the plans for'development, construction, or land use activities will require a,re-evaluation and modificatioat of this permit. 4. ;The amount of`Inipervious surface areas shall:: not exceed 30% of the lot area within the 75' Area of Environmental Concern: 5. Pursuant to 15A NCAC, Subchapter 7J .0406(b);,this permit may not be assigned, transferred, sold or otherwise. disposed of to"a' third -party. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. From the date of an appeal, any work conducted under this permit must cease until the appeal is resolved. \ This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modifications not covered under this permit require further written permit approval. All work must cease when this permit expires on 12/31/96 In issuing this permit it is agreed that this project is consis- tent with the local Land Use Plan and all applicable ordinances. Local Permit Officer (signature) Ron Lehman Pamlico County Building Inspections name P.O.Box 776 address Bayboro, N: C. 28515 This permit may not be transferred to another party without the written approval of the Division of Coastal Management. Permittee (signature required If special conditions above apply to permit) (;FNFR AI INIMP M ATInKI OTHER PERMITS MAY BE REQUIRED... The activity which you are planning may require permits other than the CAMA minor permit you are applying for here. As a service we have compiled a listing of the kinds of permits which might be required. We suggest that you check over this list with your Local Permit Officer to determine which, if any, of these may apply to your project. This is not a requirement of CAMA, only a sugges- tion to help you complete your project as quickly as possible. Zoning, Drinking Water Well, Septic Tank (or other sanitary waste treatment system), Burning, Electrical, Plumbing, Heating and Air Conditioning, Insulation and Energy Conservation, FIA Certification, Sand Dune, Sediment Control, . Subdivision Approval, Mobile Home Park Approval, Highway Connection, Others: