Loading...
HomeMy WebLinkAbout95-88_North, Claud_19950920dViayoz rJrhPE gown of 2mz9za J-Ysf csanucM. at:ff 7500 gn=. d 2�stvc gm.waff,&' e-N.a &W&= 28594-g320 "Mayor .rP+o 9cm "Pf r 2 1 8 �jo,don�? GY�cGgdamc ns �J 9 9354-34 4 9-- �9 9% 354-5o6 Ced 9-3. (XT22,unwn Nina e. �aieine � F ra��sy EP 2 2 1r95 �j '�csac g. Ninwn SepteirLer 20, 1995 ,,...rru+rrrrwrrrwir«!►rrp�� Mr. CLaud North 8702 Emerald Plantation: Road Eherald Isle, NC 20594 Re: 95:88 Dear Mr North: We have reviewed the information sul-xnitted to this office in your request to construct a pier, with a tee, and find you are exempt from needing a Minor Development Permit as long as it meets the specifications below: Your letters have been received and are on file in this office to the adjoining property owners to advise of the project; All pi 1 ings _shall be a minimum of 6"x6" square and shall have an 8' minimum tip penetrat ion. Prior to construct ion, piling depths must becertified, either by an engineer or having the building inspector on site at the time of piling placement; Construction must conform to all applicable state acid local construction requirements as illustrated in Bogue Sound Pier,/Boat lift specifications (Section 6-84). A pier is not to exceed 200' in length, or 4' of water at low tide, riot to exceed 200 square feet for any tees); nor shall the pier exceed 6' in width. 71ie platform portion of any tee may not cover marshlands. Any variation of the above will require a CAMA permit; also, this certification of exemption from requiring a CAMA permit is valid for 90 days from the date of issuance- Following expiration, a re-examination: of the project grid project site may be necessary to renew this certification. Sincerely, Carol Angus, LUcal CWA Permit Off ices �F �nrni �r �Fnnla -