Loading...
HomeMy WebLinkAbout351-95_Lenker, David and Debbie_19950705CARTERET 351-95 Local Government Permit Number JU1 0 1r95 ! CAMA L MINOR DEVELOPMENT ------------------------ .PERMIT as authorized by the State of North Carolina, Department of Environment, jl1 Health, and Natural Resources and the Coastal Resources Commission for development in an area of environmental concern pursuant to Section 113A-118 of the - General Statutes, "Coastal Area Management." Issued to DAVID & DEBBIE LENKER authorizing development in ESTUARINE SHORELINE AEC at L53 BLUEWATER BANKS S/D — HWY 24 as requested in the permittee's application, dated MAY 22, 1995 _ This permit, issued on JULY 5 , 1995 . is subject to compliance with the application and site drawing (where consistent with the permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void. ALL PROPOSED DEVELOPMENT AND ASSOCIATED CONSTRUCTION MUST BE DONE IN ACCORDANCE WITH THE PERMITTED WORKPLAT DRAWING AS ORIGINALLY SUBMITTED. ALL CONSTRUCTION MUST COMFORM TO THE NORTH CAROLINA BUILDING CODE REQUIREMENTS AND ALL OTHER LOCAL, STATE AND FEDERAL REGULATIONS. ANY CHANGE OR CHANGES IN THE PLANS FOR DEVELOPMENT, CONSTRUCTION, OR LAND USE ACTIVITES WILL REQUIRE A RE—EVALUATION AND MODIFICATION OF THIS PERMIT. PRIOR TO INITIATING ANY LAND —DISTURBING ACTIVITIES, A BARRIER LINE OF FILTER CLOTH, STAKED HAY BALES, OR BURLAP MUST BE INSTALLED BETWEEN THE LAND DISTURBING ACTIVITY AND THE ADJACENT MARSH OR WATER AREAS, UNTIL SUCH TIME AS THE AREA HAS BEEN PROPERLY STABILIZED WITH A VEGETATED COVER. PURSUANT TO 15 NCAC, SUBCHAPTER 7J.0406(b), THIS PERMIT MAY NOT BE ASSIGNED, TRANSFERRED, SOLD OR OTHERWISE DISPOSED OR TO A THIRD PARTY. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. From the date of an appeal, any work conducted under this per- mit must cease until the appeal is resolved. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modifications not covered under this permit requires further written permit approval. All work must cease when this permit expires on December 31, 1998 In issuing this permit it is agreed that this project is consistent with the local Land Use Plan and all applicable ordinances. This permit may not be transferred to another party without the written approval of the Division of Coastal Management. Local Permit Officer (signature) LARRY D. SMITH name CARTERET COUNTY CENTRAL PERMIT OFFICE COURTHOUSE SQUARE address BEAUFORT NC 28516 Permittee (signature required if special conditions above apply to permit) Locality Permit Number 3 5' ^ 4 GENERAL INFORMATION LAND OWNAR Name Ul Address 3 �T e14 City ,J d rZ State /VG Zip 2 r,'�_20 Phone AUTHORIZED AGENT Name Address City State Zip U Phone LOCATION OF PROJECT R4110G,/4' 'Qrel/ J T"Z�/y/J%D/�✓ (If not oceanfront, is waterbody natural or manmade?) DESCRIPTION OFF PROJECT 9Ir==' AnAe / a /�'�` c y11 rc� c�%mot.01 AREAS OF ENVIRONMENTAL CONCERN (AEC) CLASSIFICATION (To be filled in by the Local Permit Officer prior to completing application.) Ocean Hazard i,Estuarine Shoreline ORW Shoreline Other PROPOSED USE Residential Commercial/Industrial Other SIZE OF BUILDING IN SQUARE FEET Size of other impervious or built upon surfaces (such as driveways, etc.) within 75 feet of the shoreline (575 feet of an ORW shoreline) SIZE OF SITE IN SQUARE FEET OTHER PERMITS MAY BE REQUIRED ... The activity which you are planning may require permits other than the CAMA minor permit you are applying for here. As a service we have com- pplied a listing of the kinds of permits which might be required. We suggest that you check over this list with your Local Permit Officer to determine which, if any, of these may apply to your project. This is not a requirement of LAMA, only a sugges- tion to help you complete your project as quickly as possible. Zoning, Drinking Water Well, Septic Tank (or other sanitary waste treatment system), Burning, Electri- cal, Plumbing, Heating and Air Conditioning, In- sulation and Energy Conservation, FIA Certifica- tion, Sand Dune, Sediment Control, Subdivision Approval, Mobile Home Park Approval, Highway Connection, Others: STATEMENT OF OWNERSHIP I, the undersigned, an applicant for a CAMA minor development permit, begin either the owner of property in an area of environmental concern or a person authorized to act as an agent for purposes of applying for a CAMA minor development permit, certify that the person listed as landowner on this application has a sig- nificant�interest in the real property described therein. This interest can be described as follows: (check one) ✓an own r rd title, Ti is v ted�in �CountyRegistry see Deed Book �, page�in the &Deeks. an owner by virtue of inheritance. Applicant is an heir to the estate of probate was in County. if other interest, such as written contact or lease, explain below or use a separate sheet and attach to this application. ,NOTIFICATION OF ADJACENT PROPERTY OWNERS I furthermore certify that the following persons are owners of properties adjoining this property. I affirm that I have given ACTUAL NOTICE to each of them concerning my intent to develop this property and to apply for a CAMA permit. (Name) (2) Ads i (3) (4) (Address) FOR DEVELOPERS IN OCEAN HAZARD AND ESTUARINE HAZARD AREAS: I acknowledge that the land owner is aware that the proposed development is planned for an area which may be susceptible to erosion and/or flooding. I acknowledge that the local permit officer has explained to me the particular hazard problems associated with this lot. This explanation was accompanied by recommendations concerning stabilization and floodproofing techniques. PERMISSION TO ENTER ON LAND I furthermore certify that I am authorized to grant and do in fact grant permission to the local permit officer and his agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. This application includes: general information (this form), a site drawing as described on the back of this ap- plication, the ownership statement, the AEC hazard notice where necessary, a check for $50.00 made payable to the locality, and any information as may be provided orally by the applicant. The details of the application as described by these sources are incorporated without reference in any permit which may be issued. Deviation from these details will constitute a violation of any permit. Any person developing in an AEC without a per- mit is subject to civil, criminal and administrative action. This the day of 119 Land owner or -person authorized to act as his agent for purposes of filing a CAMA permit application. a n a L N CARTERET COUNTY, NORTH CAROLINA. AFFIDAVIT OF PUBLICATION Before the undersigned, a Notary Public of said County and State, duly commissioned, qualified, and authorized by law to administer oatbs, personally appeared ...................................... .................. ... _...... _......_.._. Patti J. Lyerly who being Clerk first duly sworn, deposes and says: that he (she) is ........... ...._.......-. (Owner, partner, publisher, or other officer or employee authorized to make this affidavit) of THE CARTERET PUBLISHING CO., INC., engaged in the publication _ of a newspaper known as CARTERET COUNTY NEWS•TIMES, published, PursuantCto MAII3A-119(b),' issued, and entered as second class mail in the Town of Morehead City, in Carteret county, Ideally authorized to Issue CAMA Permits in areas of soul- said County and State; that he (she) is authorized to make this affidavit ronmental concern, hereby gives notice: and sworn statement; that the notice or other legal advertisement, a true that on May 22, 1995, David Lenker ap• plied for a CAMA Permit to clear lot and. copy of which is attached hereto, was published in CARTERET COUNTY landscape including IrrigatSourxion system, ound with 75 feet of Bogus S. The prop- _ erty is located at 428 Bay Run Dr., I Newport, NC - Bluewater Banks Sub- NEWS -TIMES on the following dates:..._._ _.._.». ._......_ division. 4. - {, ; . , ; :. -', I The applicaticn may be Inspected at the address above. Public comments May 24, 1995 received will be June 1, 1995 will be considered. Later comments wig be so- . . . ... .................................. ... ....... ... _.._........ cepted and considered up 10 the time of and that the said newspaper in which such notice, paper, document, or permit decision. Project modifications may ocar based on turther review and legal advertisement was published was, at the time of each and every such cwvn ft Notice of the permit decision publication, a newspaper meeting all of the requirements and qualifications on this matter will be provided upon , written request. of Section 1-597 of the General Statutes of North Carolina and was a Lany 0. Smith LocaICAMAPemOt0frim qualified newspaper within the meaning of Section 1-597 of the General C0Ut910nSe Square Statutes of North Carolina. Beaufort NC28518 'My24 This.. day of ................ ffi ...........__.........._---� 110 (Signature of pe on m g affidavit) Sworn to and subscribed before me, this ..... ........ twenty-fifth ................_._.........._.. May 95 dayof............................................................. 19......... ............... _.._. Notary Public. Se My Commission expires :..............._...... ptember_ 12:_ 1997 CARTERET COUNTY COURTHOUSE CENTRAL PERMIT OFFICE OF COURTHOUSE SQUARE BEAUFORT. N. C. 28516-1898 728-8545 BUILDINGS. MOBILE HOMES. ELECTRICAL. PLUMBING. MECHANICAL Pursuant to NCGS 113A-119(B) Carteret County, locally authorized to issue CAMA Permits in areas of environmental concern, hereby gives notice that on May 22, 1995 David Lenker applied for a CAMA Permit to clear lot and landscape including irrigation system within 75 feet of Bogue Sound. The property is located at 428 Bay Run Dr. Newport, N.C. - Bluewater Banks Subdivision. The application may be inspected at the address above. Public comments received by June 1, 1995 will be considered. Later comments will be accepted and considered up to the time of permit decision. Project modifications may occur based on further review and comments. Notice of the permit decision on this matter will be provided upon written request. Larry DL/ Smith - Local LAMA Permit Officer Central Permit Office Carteret County Courthouse Square Beaufort NC 28516 PLEASE PUBLISH ON MAY 24, 1995 AND RETURN AFFIDAVIT OF PUBLICATION AS SOON AS POSSIBLE. Thank you. soce,tw 2s AP CW12 �? �� e 124 y X1 -/,,