HomeMy WebLinkAbout95-32_King, Robert_19950106CAMA GENERAL PERMIT BEACH BULLDOZE
NAME AdAPPLICANT'S 6 e%�T X
ADDRESS l/O �T4LN/C
(Permant6fit mailing address)
CITY
GP !Q �/ Z -
G aA� 2-
PROJECT LOCATION (BLOCK, LOT, STREET ADDRESS, SUBDIVISION)
iii/ ac 0 r-hw b,_. 41._ c L r4
NAME OF CONTRACTOR /'X
DATE PERMITTED: 6 EXPIRES a,
CONDITIONS UNDER WHICH ALL BEACH BULLDOZING MUST BE COMPLETED:
1. THE AREA ON WHICH THIS ACTIVITY IS BEING PERFORMED MUST
MAINTAIN A SLOPE OF ADEQUATE GRADE SO AS TO NO ENDANGER THE PUBLIC
OR PUBLIC'S USE OF THE BEACH AND SHOULD FOLLOW THE PREEMERGENCY
SLOPE AS CLOSELY AS POSSIBLE. THE MOVEMENT OF MATERIAL UTILIZING A
BULLDOZER, FRONT END LOADER, BACKHOE, SCRAPER, OR ANY TYPE OF EARTH
MOVING OR CONSTRUCTION EQUIPMENT SHOULD NOT EXCEED ONE FOOT IN
DEPTH MEASURED FROM THE PRE -ACTIVITY SURFACE ELEVATION.
2. THE ACTIVITY MUST.NOT EXCEED THE LATERAL BOUNDS OF THE
APPLICANT'S PROPERTY UNLESS HE HAS PERMISSION OF THE ADJOINING LAND
OWNER (S).
3. MOVEMENT OF MATERIAL FROM SEAWARD OF THE LOW WATER LINE
WILL REQUIRE A CAMA MAJOR DEVELOPMENT AND STATE DREDGE AND FILL
PERMIT.
4. THE ACTIVITY MUST NOT SIGNIFICANTLY INCREASE EROSION ON
NEIGHBORING PROPERTIES AND MUST NOT HAVE A SIGNIFICANT ADVERSE
EFFECT ON IMPORTANT NATURAL OR CULTURAL RESOURCES.
5. THE ACTIVITY MAY BE UNDERTAKEN TO PROTECT THREATENED ON -
SITE WASTE DISPOSAL SYSTEMS AS WELL AS THE THREATENED STRUCTURE'S
FOUNDATION.
4 � ��� , c-: �:)
C�
APPLICANT'S TORE LOCAL CAA PERMIT OFFICER
FIRST STABLE LINE OF VEGETATION FEET DATE: