Loading...
HomeMy WebLinkAboutExempted_Jones, Curtis_19950927 (2)THE TOWN OF PINE KNOLL SHORES 100 Municipal Circle, Pine Knoll Shores, North Carolina 28512 (919) 247-4353 • Fax (919) 247-4355 September 27, 1995 Mr. and Mrs. Curtis Jones Rt. 4, Box 285 Raleigh, NC 27606 RE: EXEIVIPTED PROJECT @1NOR) FILE NUMBER: 95-2486-A Dear Mr. and Mrs. Jones, SEP 2.9 1995 �wirMrrrrrrr� r r�rwurpw,� We have reviewed the information submitted to this office in your inquiry concerning the necessity of filing an application for a minor development permit under the Coastal Area Management Act (CAMA). The activity you propose is exempt from needing a minor development permit as long as it meets the conditions specified below. If your plans should change and your project will no longer meet those conditions, please contact me before proceeding. DESCRIPTION OF ACTIVITY AND CONDITIONS: and Chaoterl6: Waterways. PKS O A boat lift is defined as an uncovered structure for the purpose of lifting or moving a boat. There shall be no roof, cover, top, or deck placed or constructed over the boat lift. The boat lift must not extend more than one-third of the way across the water body and shall not interfere with established navigation rights. The boat lift must be for private, non-commercial use only. The boat lift must be set back a minimum of 15' from the adjacent property owner's area of riparian access unless waived by a written agreement. Confirmation must also be given that written statements have been obtained indicating that they have no objections to the proposed boat lift. No structure shall be allowed that, in its normal operation, shall allow a boat to be stored or docked, either in or above the water, within 20 feet of the center of the waterway in which the structure is located. Pilings and boat moving devices shall not be more than 20 feet in length measured to the parallel riparian lot line. No structure for the purpose of assisting in boat dockage or boat storage, such as one or more piiings, a davit or a boat lift, shall be permitted in addition to the allowed dock or pier appurtenant to any lot unless said structure is appurtenant to said allowed dock or pier, and is constructed so as to be utilized to assist in the docking or storage of boats on or at said dock or pier. If the 15 feet setback is waived by the adjacent riparian property owner, neither the dock or pier, pilings, or other structures shall extend closer than 5 feet from the adjacent lot line. You have been approved to construct an open boat lift at 107 Bogue Pine Circle, in Bogue Pine Boat Basin, Pine Knoll Shores, Carteret County, NC, as per the approved plans dated September 27,1995. Any change in plans shall be approved by Local Permit Officer/Building Inspector prior to commencing work. Sincerely yours, Roy D. Brownlow Local Permit Officer