We have reviewed the information submitted to this office in your inquiry concerning the necessity of filing an
application for a minor development permit under the Coastal Area Management Act (CAMA). The activity you
propose is exempt from needing a minor development permit as long as it meets the conditions specified below. If
your plans should change and your project will no longer meet those conditions, please contact me before proceeding.
DESCRIPTION OF ACTIVITY AND CONDITIONS:
and Chaoterl6: Waterways. PKS O
A boat lift is defined as an uncovered structure for the purpose of lifting or moving a boat. There shall be no roof, cover, top, or deck placed or
constructed over the boat lift. The boat lift must not extend more than one-third of the way across the water body and shall not interfere with
established navigation rights. The boat lift must be for private, non-commercial use only. The boat lift must be set back a minimum of 15' from the
adjacent property owner's area of riparian access unless waived by a written agreement. Confirmation must also be given that written statements
have been obtained indicating that they have no objections to the proposed boat lift.
No structure shall be allowed that, in its normal operation, shall allow a boat to be stored or docked, either in or above the water, within 20 feet of
the center of the waterway in which the structure is located. Pilings and boat moving devices shall not be more than 20 feet in length measured to
the parallel riparian lot line. No structure for the purpose of assisting in boat dockage or boat storage, such as one or more piiings, a davit or a boat
lift, shall be permitted in addition to the allowed dock or pier appurtenant to any lot unless said structure is appurtenant to said allowed dock or
pier, and is constructed so as to be utilized to assist in the docking or storage of boats on or at said dock or pier. If the 15 feet setback is waived by
the adjacent riparian property owner, neither the dock or pier, pilings, or other structures shall extend closer than 5 feet from the adjacent lot line.
You have been approved to construct an open boat lift at 107 Bogue Pine Circle, in Bogue Pine Boat Basin, Pine Knoll Shores, Carteret County,
NC, as per the approved plans dated September 27,1995. Any change in plans shall be approved by Local Permit Officer/Building Inspector prior
to commencing work.
Sincerely yours,
Roy D. Brownlow