Loading...
HomeMy WebLinkAbout95-65_Bechtold, William_19950327CAMA GENERAL PERMIT BEACH BULI OZE GP APPLICANT'S NAME ADDRESS zc,Era l/lK ((AJ CITY PROJECT LOCATION (BLOCK, LOT, STREET ADDRESS, SUBDIVISION) is I-Z . Arlev /% ; T� 7 Z0`7 NAME OF CONTRACTOR DATE PERMITTED: EXPIRES CONDITIONS UNDER WHICH ALL BEACH BULLDOZING MUST BE COMPLETED: 1. Any bulldozing request to reconstruct or repair frontal and/or primary dunes is defined as the process of moving natural beach material from any point seaward of the first line of stable vegetation to repair damage to frontal and/or primary dunes caused by a major storm event. This permit shall not apply to the Inlet Hazard Area of Environmental Concern. 2. Beach bulldozing (moving sand from any point seaward of the first line of stable vegetation to create a protective dike or for any other purpose) may be permitted if all the following conditions are met: - a. Beach material is removed no deeper than one foot below the existing surface elevation. b. The movement of material maintains a slope that does the public's use of the beach; c. The project does not go beyond the bounds of the applicant's property without the permission of the neighboring property owners; d. The project does not increase erosion on neighboring properties; e. No material is removed from below the mean low-water line; f. The project ,does not damage important natural or cultural resources; and g. The movement of material protects the threatened structure's foundation or threatened on -site waste disposal system. h-PPLICANTIS SIGNATURE LOCAL CAMA PERMIT OFFICER