Loading...
HomeMy WebLinkAbout94-22_Rowe, Collon_19941228CAMA GENERAL PERMIT BEACH BULLDOZE GP APPLICANT'S NAME ADDRESS (Permanen ail, address) CITY jn!� PROJECT LOCATION (BLOCK, LOT, STREET ADDRESS,, SUBDIVISION) �/� I 1 v�-s /� / 7 /� �- `�// �� p NAME OF CONTRACTOR DATE —PERMITTED: ��� z' EXPIRES CONDITIONS UNDER WHICH ALL BEACH BULLDOZING MUST BE COMPLETED: 1. THE AREA ON WHICH THIS ACTIVITY IS BEING PERFORMED MUST MAINTAIN A SLOPE OF ADEQUATE GRADE SO AS TO NO ENDANGER THE PUBLIC OR PUBLIC'S USE OF THE BEACH AND SHOULD FOLLOW THE PREEMERGENCY SLOPE AS CLOSELY AS POSSIBLE. THE MOVEMENT OF MATERIAL UTILIZING A BULLDOZER, FRONT END LOADER, BACKHOE, SCRAPER, OR ANY TYPE OF EARTH MOVING OR CONSTRUCTION EQUIPMENT SHOULD NOT EXCEED ONE FOOT IN DEPTH MEASURED FROM THE PRE -ACTIVITY SURFACE ELEVATION. 2. THE ACTIVITY MUST NOT EXCEED THE LATERAL BOUNDS OF THE APPLICANT'S PROPERTY UNLESS HE HAS PERMISSION OF THE ADJOINING LAND OWNER(S). 3. MOVEMENT OF MATERIAL FROM SEAWARD OF THE LOW WATER LINE WILL REQUIRE A CAMA MAJOR DEVELOPMENT• AND STATE DREDGE AND FILL PERMIT. 4. THE ACTIVITY MUST NOT SIGNIFICANTLY INCREASE EROSION ON NEIGHBORING PROPERTIES AND MUST NOT HAVE A SIGNIFICANT ADVERSE EFFECT ON IMPORTANT NATURAL OR CULTURAL RESOURCES. S. THE ACTIVITY MAY BE UNDERTAKEN TO PROTECT THREATENED ON - SITE WASTE DISPOSAL SYSTEMS AS WELL AS THE THREATENED STRUCTURE'S FOUNDATION. APPLICANT'S SIGNATURE LOCAL CAMA PFACMIT OFFICER First Stable Line of Vegetation feet Date: