HomeMy WebLinkAbout94-11_Rich, Curtis_19941220CAMA GENERAL PERMIT BEACH B'
APPLICANT'S NAME q-`Hrts
ADDRESS po'5-5-6 7
CITY
ch
(Permanent mailing addre
PROJECT LOCATION (BLOCK, LOT, STREET ADDRESS
,DfS W-17--/ l �
NAME OF CONTRACTOR { &
DATE PERMITTED: �ala� y
EXPIRES
GP /-/- —��
SUBDIVISION)
r
CONDITIONS UNDER WHICH ALL BEACH BULLDOZING MUST BE COMPLETED:
1. THE AREA ON WHICH THIS ACTIVITY IS BEING PERFORMED MUST
MAINTAIN A SLOPE OF ADEQUATE GRADE SO AS TO NO ENDANGER THE PUBLIC
OR PUBLIC'S USE OF THE BEACH AND SHOULD FOLLOW THE PREEMERGENCY
SLOPE AS CLOSELY AS POSSIBLE. THE MOVEMENT OF MATERIAL UTILIZING A
BULLDOZER, FRONT END LOADER, BACKHOE, SCRAPER, OR ANY TYPE OF EARTH
MOVING OR CONSTRUCTION EQUIPMENT SHOULD NOT EXCEED ONE FOOT IN
DEPTH MEASURED FROM THE PRE -ACTIVITY SURFACE ELEVATION.
2. THE ACTIVITY MUST NOT EXCEED THE LATERAL BOUNDS OF THE
APPLICANT'S PROPERTY UNLESS HE HAS PERMISSION OF THE ADJOINING LAND
OWNER(S).
3. MOVEMENT OF MATERIAL FROM SEAWARD OF THE LOW WATER LINE
WILL REQUIRE A CAMA MAJOR DEVELOPMENT• AND STATE DREDGE AND FILL
PERMIT. i
4. THE ACTIVITY MUST NOT SIGNIFICANTLY INCREASE EROSION ON
NEIGHBORING PROPERTIES AND MUST NOT HAVE A SIGNIFICANT ADVERSE
EFFECT ON IMPORTANT NATURAL OR CULTURAL RESOURCES.
5. THE ACTIVITY MAY BE UNDERTAKEN TO PROTECT THREATENED ON -
SITE WASTE DISPOSAL SYSTEMS AS WELL AS THE THREATENED STRUCTURE'S
FOUNDATION.
APPLICANT'S SIGNATURE LOCAL AMA ERMIT OFFICER
First Stable Line of Vegetation feet Date: /a —// 757L/