Loading...
HomeMy WebLinkAboutExempted_Lownes, Robert and Holly_20131016Jim Jennings, AICP Director 10/16/13 Robert and Holly Lownes 3709 Cathedral Bell Road Raleigh, NC 27614 Carteret County Department of Planning and Development Main Office: 302 Courthouse Square Beaufort, NC 28516-6709 Tel: (252) 728-8497or 728-8545 Fax: (252) 728-6643 !Y Exemption Number — WO-274 3 RE: EXEMPTED PROJECT - STRUCTURAL BEACH ACCESSWAY (15A NCAC 7K .0207) PROJECT ADDRESS — 703 Salter Path Road, Indian Beach OCEAN HAZARD AREA OF ENVIRONMENTAL CONCERN Dear Mr. and Mrs. Lownes: Western Office: 701 Cedar Point Blvd. Cedar Point, NC 28584-8013 Tel: (252) 222-5833 Fax: (252) 393-3205 I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. After making a site Inspection on 10/16/13,1 have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with your site drawing dated 10114/13, and meet the conditions specified below. If you plans should change and your project will no longer meet these conditions, please contact me before proceeding. STRUCTURAL ACCESSWAY EXEMPTED 1. The accessway must not exceed six feet in width and shall provide only pedestrian access to the ocean beach. 2. The accessway must be constructed so as to make negligible alterations to the frontal dunes. This means that the accessway must be constructed on raised posts or pilings of five feet or less In depth, so that wherever possible only the posts or pilings touch the frontal dunes without any alteration to the dunes. In no case shall the frontal dune be altered so as to significantly diminish its capacity as a protective barrier against flooding and erosion. 3. Construction of the accessway be shall consistent with all other applicable local ordinances and N. C. Building Code standards. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization. This exemption expires 90 days from the date of the letter. Sincerely J, �j�� Rotchford, LPO Western Cartetet County Cc: Brad Connell, DCM Ed Pfel, Contractor � AiSJ f.Qgai•'r� ) 966I-Hdo ' ,rt. 1 � ot'P,i ti 9661stio 966WAA.t. qx, 19L '� . t• .6 ,EZ cn .£ 9661,W30 .y .0•Zt t- ^^ � _..,� , t- t• p66t.�nto °' - `7b 3 .fit l�w"��t�>> .Vnn•OL..r•''• t, 9661-�Q(3 i .trt• o� •Qd'apaS2 �o t�p��ze �x /�s� APPROVED DATE—.[(:) ` ' J� �}-• "y PLANS FOR THIS JOB MUST BE ON JOB AT Z.Io t x`'l] 11 _ ALL- TIMES. ALL FEDERAL, STATE AND CITY CODrs, 0^DINANCrS, AND REGULATIONS } �ci ETC. SHALL BE COP4SII)ERrD AS PART OF qq� )'a,�--�'p G� ��[� SPECIFICATIONS i.'i)^ Tiiis lit. iu)INC AN() J SHALL TAKE OV.':T; ANYTHING SI-(Cril;(!'. CF*Wwvle-El) OR 1101'i_IED WHERE `VARIANCIFS OCCUR. A, r 11 ��dZsx1 aMo� .