HomeMy WebLinkAboutExempted_Lownes, Robert and Holly_20131016Jim Jennings, AICP
Director
10/16/13
Robert and Holly Lownes
3709 Cathedral Bell Road
Raleigh, NC 27614
Carteret County
Department of Planning and Development
Main Office:
302 Courthouse Square
Beaufort, NC 28516-6709
Tel: (252) 728-8497or 728-8545
Fax: (252) 728-6643
!Y
Exemption Number — WO-274 3
RE: EXEMPTED PROJECT - STRUCTURAL BEACH ACCESSWAY
(15A NCAC 7K .0207)
PROJECT ADDRESS — 703 Salter Path Road, Indian Beach
OCEAN HAZARD AREA OF ENVIRONMENTAL CONCERN
Dear Mr. and Mrs. Lownes:
Western Office:
701 Cedar Point Blvd.
Cedar Point, NC 28584-8013
Tel: (252) 222-5833
Fax: (252) 393-3205
I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an
application for a minor development permit under the Coastal Area Management Act. After making a site
Inspection on 10/16/13,1 have determined that the activity you propose is exempt from needing a minor
development permit as long as it remains consistent with your site drawing dated 10114/13, and meet the
conditions specified below. If you plans should change and your project will no longer meet these conditions,
please contact me before proceeding.
STRUCTURAL ACCESSWAY EXEMPTED
1. The accessway must not exceed six feet in width and shall provide only pedestrian access to the
ocean beach.
2. The accessway must be constructed so as to make negligible alterations to the frontal dunes.
This means that the accessway must be constructed on raised posts or pilings of five feet or less
In depth, so that wherever possible only the posts or pilings touch the frontal dunes without any
alteration to the dunes. In no case shall the frontal dune be altered so as to significantly
diminish its capacity as a protective barrier against flooding and erosion.
3. Construction of the accessway be shall consistent with all other applicable local ordinances and
N. C. Building Code standards.
This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other
State, Federal or Local authorization. This exemption expires 90 days from the date of the letter.
Sincerely
J, �j��
Rotchford, LPO
Western Cartetet County
Cc: Brad Connell, DCM
Ed Pfel, Contractor
� AiSJ f.Qgai•'r�
)
966I-Hdo '
,rt.
1 � ot'P,i
ti 9661stio
966WAA.t.
qx,
19L
'� . t• .6 ,EZ
cn .£
9661,W30 .y .0•Zt t-
^^ � _..,� , t- t• p66t.�nto °' - `7b 3 .fit l�w"��t�>>
.Vnn•OL..r•''• t,
9661-�Q(3 i .trt•
o�
•Qd'apaS2 �o t�p��ze �x /�s�
APPROVED DATE—.[(:)
` ' J� �}-• "y PLANS FOR THIS JOB MUST BE ON JOB AT
Z.Io t x`'l] 11 _ ALL- TIMES. ALL FEDERAL, STATE AND
CITY CODrs, 0^DINANCrS, AND REGULATIONS
} �ci ETC. SHALL BE COP4SII)ERrD AS PART OF
qq� )'a,�--�'p G� ��[� SPECIFICATIONS i.'i)^ Tiiis lit. iu)INC AN()
J SHALL TAKE OV.':T; ANYTHING
SI-(Cril;(!'. CF*Wwvle-El) OR 1101'i_IED WHERE
`VARIANCIFS OCCUR.
A,
r 11
��dZsx1 aMo� .