HomeMy WebLinkAboutO-13-18_Hodges, William P_20130905Atlantic Beach
Local Government
0-13-18
Permit Number
CAMA
MINOR DEVELOPMENT
PERMIT
as authorized by the State of North Carolina, Department of Environment,
and Natural Resources and the Coastal Resources Commission for development
in an area of environment concern pursuant to Section 113A-118 of the
General Statutes, "Coastal Area Management`
Issued to Andrew Roby Construction and Phil Hodges for development in the Ocean Hazard (AEC) at 511 Ocean Ridge
Drive in Atlantic Beach, as requested in the permittee's application, dated August 20, 2013. This permit, issued on
September 5, 2013 is subject to compliance with the application and site drawing (where consistent with the permit), all
applicable regulations and special conditions and notes set forth below. Any violation of these terms may subject
permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void.
This permit authorizes: the construction of a new home, decks, patio, and driveway at 511 Ocean Ridge Drive in Atlantic Beach.
(1) All proposed development and associated construction must be done in accordance with the permitted work plat
drawings(s) dated received on August 20, 2013.
(2) All constriction must conform to the N.C. Building Code requirements and all other local, State and Federal regulations,
applicable local ordinances and FEMA Flood Regulations.
(3) Any change or changes in the plans for development, construction, or land use activities will require a re-evaluation and
modification of this permit.
(4) A copy of this permit shall be posted or available on site. Contact this office at (252) 726-4456 for a final inspection at
completion of work.
(Additional Permit Conditions on Page 2)
This permit action may be appealed by the permittee or other qualified persons
within twenty (20) days of the issuing date. From the date of an appeal, any
work conducted under this permit must cease until the appeal is resolved. This
permit must be on the project site and accessible to the permit officer when the
project is inspected for compliance. Any maintenance work or project
modification not covered under this permit, require further written permit
approval. All work must cease when this permit expires on:
DECEMBER 31, 2016
In issuing this permit it is agreed that this project is consistent with the local Land
Use Plan and all applicable ordinances. This permit may not be transferred to
another party without the written approval of the Division of Coastal
Management.
RECEIVED
DCM-MHD CITY
Jessica Fiester, MPA, CZO
CAMA LOCAL PERMIT OFFICIAL
PO Box 10
Atlantic Beach, NC 28512
PERMITTEE
(Signature required if conditions above apply to permit)
Name: Hodges/Roby
Minor Permit # 0-13-18
Date: September 5, 2013
Page 2
(5) The permittee is required to contact the Local Permit Officer (252) 726-4456 shortly before he plans to begin
construction to arrange a setback measurement that will be effective for sixty (60) days barring a major shoreline
change. Construction must begin within sixty (60) days of the determination or the measurement is void and must
be redone.
(6) All buildings constructed within the ocean hazard area shall comply with the NC Building Code, including the
Coastal and Flood Plain Construction Standards of the N. C. Building Code, and the Local Flood Damage
Prevention Ordinance as required by the National Flood Insurance Program. If any provisions of the building code
or a flood damage prevention ordinance are inconsistent with any of the following AEC standards, the more
restrictive provision shall control.
(7) All buildings must be elevated on pilings with a diameter of at least 8 inches in diameter if round, or 8 inches to a
side if square; and the first floor level of the sills and joists must meet the 100-year flood level elevation.
(8) All pilings shall have a tip penetration greater than eight feet below the lowest ground elevation under the structure.
(10)Dune disturbances will be allowed only to the extent necessary for development and if the dune's protective value is
not weakened or reduced. Disturbed dune areas will be immediately stabilized.
(11)AII unconsolidated material resulting from associated grading and landscaping shall be retained on site by effective
sedimentation and erosion control measures. Disturbed areas shall be vegetatatively stabilized (planted and
mulched) within 14 days of construction completion.
(12)Any structure authorized by this permit shall be relocated or dismantled when it becomes imminently threatened by
changes in shoreline configuration. The structure(s) shall be relocated or dismantled within two years of the time
when it becomes imminently threatened, and in any case upon its collapse or subsidence. However, if natural
shoreline recovery or beach renourishment takes place within two years of the time the structure becomes
imminently threatened, so that the structure is no longer imminently threatened, then it need not be relocated or
dismantled at that time. This condition shall not affect the permit holder's right to seek authorization of temporary
protective measures allowed under CRC rules.
Signature:
Date:
RECEWM
OCT 15 2013
DCb1-?AIM CITy
GENERAL INFORMATION
LAND OWNER
Name William P. Hodges
Address 1260 Green Acres Road
City
Email
Williamston
AUTHORIZED AGENT
Name Andrew Roby Inc.
Address PO Box 2220
City
Atlantic Beach
State NC
State NC
Email david.gambardella@andrewroby.com
AUG 2 2 2013
DC.M-I11I1D CrfY
Zip 27892 Phone 252-799-3750
Zip 28512 Phone 252-648-8007
LOCATION OF PROJECT: (Address, street name and/or directions to site. If not oceanfront, what is the name of the
adjacent waterbody.) Atlantic Ocean
DESCRIPTION OF PROJECT: (List all proposed construction and land disturbance.) New House, Driveway,
Beach Shower, and wood access
SIZE OF LOT/PARCEL: 12004
square feet .276 acres stairs
PROPOSED USE: Residential 0 (Single-family 0 Multi -family ❑ ) Commercial/Industrial ❑ Other ❑
COMPLETE EITHER (1) OR (2) BELOW (Contact your Local Permit Officer if you are not sure which AEC applies
to your property):
(1) OCEAN HAZARD AECs: TOTAL FLOOR AREA OF PROPOSED STRUCTURE: 5500 square feet (includes
air conditioned living space, parking elevated above ground level, non -conditioned space elevated above ground level but
excluding non -load -bearing attic space)
(2) COASTAL SHORELINE AECs: SIZE OF BUILDING FOOTPRINT AND OTHER IMPERVIOUS OR BUILT
UPON SURFACES: square feet (includes the area of the roof/drip line of all buildings, driveways, covered decks,
concrete or masonry patios, etc. that are within the applicable AEC. Attach your calculations with the project drawing.)
STATE STORMWATER MANAGEMENT PERMIT: Is the project located in an area subject to a State Stormwater
Management Permit issued by the NC Division of Water Quality?
YES NOX_
If yes, list the total built upon area/impervious surface allowed for your lot or parcel: square feet.
OTIIER PERMITS MAY BE REQUIRED: The activity you are planning may require permits other than the CAMA
minor development permit, including, but not limited to: Drinking Water Well, Septic Tank (or other sanitary waste
treatment system), Building, Electrical, Plumbing, Heating and Air Conditioning, Insulation and Energy Conservation, FIA
Certification, Sand Dune, Sediment Control, Subdivision Approval, Mobile Home Park Approval, Highway Connection, and
others. Check with your Local Permit Officer for more information.
STATEMENT OF OWNERSHIP:
I, the undersigned, an applicant for a CAMA minor development permit, being either the owner of property in an AEC or a
person authorized to act as an agent for purposes of applying for a CAMA minor development permit, certify that the person
listed as landowner on this application has a significant interest in the real property described therein. This interest can be
described as: (check one)
X an owner or record title, Title is vested in William P. Hodges Etux Lisa B, see Deed Book 1442
page 359 in the Carteret County Registry of Deeds. ItECEIVEI:
an owner by virtue of inheritance. Applicant is an heir to the estate of AUG29 201 J
probate was in
County.
if other interest, such as written contract or lease, explain below or use a separate sheet & attacTto this pplication.
NOTIFICATION OF ADJACENT PROPERTY OWNERS:
I furthermore certify that the following persons are owners of properties adjoining this property. I affirm that I have given
ACTUAL NOTICE to each of them concerning my intent to develop this property and to apply for a CAMA permit.
(Name) (Address)
(1) CALVIN G WELLONS INC PO BOX 1018, MOREHEAD CITY, NC 28557
(2) LOU UZZLE 19A GLENMORE DR, DURHAM, NC 27707
(3)
(4)
ACKNOWLEDGEMENTS:
I, the undersigned, acknowledge that the land owner is aware that the proposed development is planned for an area which
may be susceptible to erosion and/or flooding. I acknowledge that the Local Permit Officer has explained to me the particu-
lar hazard problems associated with this lot. This explanation was accompanied by recommendations concerning stabiliza-
tion and floodproofing techniques.
I furthermore certify that I am authorized to grant, and do in fact grant, permission to Division of Coastal Management staff,
the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information
related to this permit application.
This the / � day of�;~20 !�
Landowner or person authorized to act as his/her agent for purpose of filing a CAMA permit application
This application includes. general information (this form), a site drawing as described on the back of this application, the
ownership statement, the Ocean Hazard AEC Notice where necessary, a checkfor $100.00 made payable to the locality, and
any information as may be provided orally by the applicant. The details of the application as described by these sources are
incorporated without reference in any permit which may be issued. Deviation from these details will constitute a violation of
any permit. Any person developing in an AEC without permit is subject to civil, criminal and administrative action.
SITE DRAWING/APPLICATION CHECKLIST
Please make sure your site drawing includes the following information required for a CAMA minor development permit.
The Local Permit Officer will help you, if requested.
PHYSICAL DIMENSIONS
Label roads
Label highways right-of-ways
Label local setback lines
Label any and all structures and driveways currently existing on property
Label adjacent waterbody
PHYSICAL CHARACTERISTICS
Draw and label normal high water line (contact LPO for assistance)
_ Draw location of on -site wastewater system
If you will be working in the ocean hazard area:
Draw and label dune ridges (include spot elevations)
Draw and label toe of dunes
Identify and locate first line of stable vegetation (contact LPO for assistance)
_ Draw and label erosion setback line (contact LPO for assistance)
Draw and label topographical features (optional)
If you will be working in a coastal shoreline area:
Show the roof overhang as a dotted line around the structure
Draw and label landward limit of AEC
Draw and label all wetland lines (contact LPO for assistance)
Draw and label the 30-foot buffer line
DEVELOPMENT PLANS
X' Draw and label all proposed structures
Draw and label areas that will be disturbed and/or landscaped
Note size of piling and depth to be placed in ground RECEIVED
Draw and label all areas to be paved or graveled
Show all areas to be disturbed AUG 2 2 2013
Show landscaping
NOTE TO APPLICANT DCM MHD CITY
Have you:
• completed all blanks and/or indicated if not applicable?
• notified and listed adjacent property owners?
• included your site drawing?
• signed and dated the application?
• enclosed the $100.00 fee?
• completed an AEC Hazard Notice, if necessary? (Must be signed by the property owner)
OCEAN HAZARD AEC NOTICE
Project is in an: Ocean Erodible Area
10
Property Owner:
Property Address
Date Lot Was Platted:
This notice is intended to make you, the applicant, aware of the
special risks and conditions associated with development in this
area, which is subject to natural hazards such as storms, erosion
and currents. The rules of the Coastal Resources Commission
require that you receive an AEC Hazard Notice and
acknowledge that writing hefnre a Dermit for
development can b�
The Commission',
setbacks and dune �Che 6661-
eliminate, property% : f
Coastal Resources
the development a
the development 1 .
Environmental Col .
h
relocated or disma s
by changes in shoj _ �
relocated or dism .
imminently threats JeS�ve,�
subsidence.
The best available' .
Resources Comm,,-.
average ocean era
located is feet per year.
The rate was established by careful analysis of aerial
photographs of the coastline taken over the past 50 years.
Studies also indicate that the -shoreline could move as much as
A0 feet landward in a major storm.
The flood waters in a major storm are predicted to be about
J_ feet deep in this area.
Preferred oceanfront protection measures are beach nourishment
and relocation of threatened structures. Hard erosion control
structures such as bulkheads, seawalls, revetments, groins, jetties
and breakwaters are prohibited. Temporary sand bags may be
authorized under certain conditions.
The applicant must acknowledge this information and
requirements by signing this notice in the space below. Without
the proper signature, the application will not be complete.
Applicant Signature Date
Nigh Hazard Flood Area Inlet Hazard Area
SPECIAL NOTE: This hazard notice is required for
development in areas subject to sudden and massive storms and
erosion. Permits issued for development in this area expire on
December 31 of the third year following the year in which the
permit was issued. Shortly before work begins on the, project
site, the Local Permit Officer must be contacted to determine the
vegetation line and setback distance at your site. If the property
has seen little change since the time of permit issuance, and the
proposed development can still meet the setback requirement,
the LPO will inform you that you may begin work. Substantial
i progress on the project must be made within 60 days of this
setback determination, or the setback must be re -measured. Also,
the occurrence of a major shoreline change. as the result of a
storm within the 60-day period will necessitate re -measurement
of the setback. It is important that you check with the LPO
before the permit expires for official approval to continue the
work after the permit has expired. Generally, if foundation
pilings have been placed and substantial progress is continuing,
permit renewal can be authorized. It is unlawful to continue
work after permit expiration.
For more information, contact:
�) ens i ca &:s-k r
Local Permit Officer
40. sox io
Address
fiII4 all�e�Ch
v
Locality
Asa 7;�6-��is6
Phone Number
RECEM
Revised May 2010
F T _1
j r 0
o m 0
N O
tJ co -
m v �I . j"_ cn
-n -n
'1'I �Tl
by m• �� �m I - .
UXIMIn WE ------ I
1
GRASS
PEFMOLL5 PA ® I I �' SETBACK
ru�G I
I w f•� _ I � � - PAaKINS _ 1
s I 1 .•- a`-n- .,I..` .O is I �0 u�
Typ •.11
� I Ism
I T� S ��/11'�III(`)rIII/11I/11' I I
I-------------- I JW
f
'--------------- -
-----------------
— 1 1 11111 ® Q ❑ 1�1'nll°rnTl}I I
p 114 ' X [ 111111111111
II I.I1L IL, X I,.IJI 1
BETHggC --- — 'O �I �
E N 446'39" E I I
I
20000, I
I
ilk
I
s 9 z I
� u
d
w
lt[clp`t
HODGES RESIDENCE �,w. awtuu
ka
f
•• a 511 OCEAN RIDGE DRIVE �� t
ATLANTIC BEACH, NORTH CAROLINA 3092 ""'
soon
� o� a P• +
o °" BURNETTE ARCHITECTURE & PLANNING, P.A. fH�40t1ct;,.
SITE PLAN
u 105 BANKS STREET MOREHEAD CITY NORTH CAROLINA 28557 252 726.5387 FAX 252 726.1250
RECEIVED
AUG 2 2 2013
.riv�If i
TOWN OF ATLANTIC BEACH I�RLTT, CITY
INSPECTION & PLANNING DEPARTMENT
125 WEST FORT MACON ROAD
ATLANTIC BEACH, NORTH CAROLINA
NOTICE OF FILING
OF APPLICATION FOR
CAMA MINOR DEVELOPMENT PERMIT
Pursuant to NCGS I I3A-119(b), the Town of Atlantic Beach, a locality authorized to
issue CAMA permits in Areas of Environmental Concern, hereby gives NOTICE that on August
20, 2013, Andrew Roby Construction and Phil Hodges applied for a CAMA permit to construct a
4 bedroom house at 511 Ocean Ridge in Atlantic Beach, NC.
The application may be inspected at the address below. Public comments received by
September 5, 2013 will be considered. Later comments will be accepted and considered up to
the time of permit decision. Project modifications may occur based on further review and
comments. Notice of the permit decision in this matter will be provided upon written request.
Jessica A. Fiester
CAMA Local Permit Officer for
Town of Atlantic Beach
125 West Fort Macon Road
PO Box 10
Atlantic Beach, NC 28512
PLEASE PUBLISH ON: Wednesday, August 21, 2013
POST OFFICE BOX 10 • ATLANTIC BEACH, NORTH CAROLINA 28512 • (252) 726-4456 • FAX (252) 727-7043
HP OfficeJet Pro 8600 N911 n Series Fax Log for
Town of AB Inspections
252-727-7043
Aug 20 2013 8:OOAM
Last Transaction
Date Time Type Station ID Duration Pages Result
Digital Fax
Aug 20 7:59AM Fax Sent 97262653 0:47 2 OK
N/A
RECEIVED
AUG 2 2 2013
wC.".:-1!E?-C! Y
Town of Atlantic Beach
Planning & Inspections Department
PO Boa 10 RECEIVED
Atlantic Beach, NC 28512
Ph:252-726-4456 FAX: 252-727-7043
AUG 22 2013
FAXDC?l�f-h1.T�iD CITY
TO: /Vews7irne.s FROM:Jessjeq fl'esh-,-
Fax #: Pages:-
Phone: Date: g�ao1�3
Re: Nns P un '91 211) 3 CC:
❑ Urgent ❑ For Review 0 Please Comment ❑ Please Reply
COM3MNTS: -CA/mi AA
TOWN OF ATLANTIC BEACH
INSPECTION & PLANNING DEPARTMENT
August 20, 2013 125 WEST FORT MACON ROAD
ATLANTIC BEACH, NORTH CAROLINA
RECEIVED
David Gambardella
Agent for Phil Hodges
PO Box 2220 AUG 2 2 209
Atlantic Beach, NC 28512
DCM MHD CITY
Dear Mr. Gambardella:
The N.C. Division of Coastal Management hereby acknowledges receipt of your application for
State approval for minor development of property located at 511 Ocean Ridge Drive in Atlantic
Beach in Carteret County. It was received complete on August 20, 2013 and appears to be
adequate for processing at this time. The deadline for making a permit decision is September 5,
2013.
NCGS 113A-119(b) requires that Notice of an application be posted at the location of the
proposed development. You were given a "Notice of Permit Filling" postcard which must be
posted at the property of your proposed development. You should post this notice at a
conspicuous point along your property where it can be observed from a public road. Some
examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-
way fronting your property; or at a point along the road right-of-way where a private road would
lead one into your property. Failure to post this notice could result in an incomplete application.
An onsite inspection will be made, and if additional information is required, you will be notified.
Please contact me if you have any questions.
asica
ely, A. iester
CAMA Local Permit Officer
Town of Atlantic Beach
Enclosure
Xc: Heather Styron, DCM Field Representative
POST OFFICE BOX 10 - ATLANTIC BEACH, NORTH CAROLINA 28512 • (252) 726-4456 - FAX (252) 727-7043
N0l'1'I(;l:
CAMA PERMIT
APPLIED FOR
COMMENTS ACCEPTED THROUGH .�ep4emLor 5,,2013
APPLICANT:
FIM-01VIql,
,-
r
• •
WOMMEASSWIT'ds
�..: ow"a
FOR MORE DETAILS CONTACT
THE LOCAL PERMIT OFFICER BELOW:
Jessica. Fiester
Town of Atlantic Beach Planning Department
P.O. Box 10.
Atlantic Beach, NC 28512
M
r
APPLICATION FOR
� CAMAMINOR
DEVELOPMENT
PERMIT
In 1974, the North Carolina General Assembly passed the Coastal Area Management Act
(CAMA) and set the stage for guiding development in fragile and productive areas that
border the state's sounds and oceanfront. Along with requiring special care by those who
build and develop, the General Assembly directed the Coastal Resources Commission
(CRC) to implement clear regulations that minimize the burden on the applicant.
This application for a minor development permit under CAMA is part of the
Commission's effort to meet the spirit and intent of the General Assembly. It has been
designed to be straightforward and require no more time or effort than necessary from
the applicant. Please go over this folder with the Local Permit Officer (LPO) for the
locality in which you plan to build to be certain that you understand what information he
or she needs before you apply.
Under CAMA regulations, the minor permit is to be issued within 25 days once a
complete application is in hand. Often less time is needed if the project is simple. The
process generally takes about 18 days. You can speed the approval process by making
certain that your application is complete and signed, that your drawing meets the
specifications given inside and that your application fee is attached.
Other permits are sometimes required for development in the coastal area. While these
are not CAMA-related, we urge you to check with the Local Permit Officer to determine
which of these you may need. A list is included on page two of this folder.
We appreciate your cooperation with the North Carolina Coastal Management Program
and your willingness to build in a way that protects the resources of our beautiful and
productive coast.
RECEIVED Coastal Resources Commission
Division of Coastal Management
AUG 2 2 2013 y
y
DCM MHD CTTy n
�r
�C
C�
O H
�Oz
•J
�t
i
R
DCM Form EB 1952-2010/Revised April 2010