HomeMy WebLinkAbout59668_ENGEL, STEVEN_20120112did
❑CAMA / ❑ DREDGE & FILL rz_
GENERAL PERMIT Previous permit #
[]New El Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
❑ Rules attached.
Applicant Name
Address
'"C-
City
State ZIP
Phone #
Fax # ( )
Authorized Agent
Affected ❑ CW
❑ EW ❑ PTA ❑ ES ❑ PTS
AEC(s): ❑ OEA
❑ HHF ❑ IH ❑ UBA ❑ N/A
❑ PWS:
❑ FC:
ORW: yes / no
PNA yes / no Crit.Hab. yes / no
Project Location: County
Street Address/ State Road/ Lot #(s)
Subdivision
City ZIP
Phone # () River Basin
Adj. Wtr. Body (nat /man /unkn)
Closest Maj. Wtr. Body
Type of Project/ Activity
(Scale: )
Pier (dock) length
Platform(s)
Finger pier(s)
Groin length
number
Bulkhead/ Riprap length
avg distance offshore
max distance offshore `'
Basin, channel
cubic yards
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
Other
Shoreline Length
SAV: not sure yes no
Sandbags: not sure yes no —
Moratorium: n/a yes no
Photos: yes no
Waiver Attached: yes no
A building permit may be required by:
Notes/ Special Conditions
i
I
i
=
-
i
i
C� 7
.�
—
j
'
'
?�
'See note
on back regarding
River Basin
rules.
Agent or Applicant Printed Name
Permit Officer's Signature
Signature ** Please read compliance statement on back of permit
Application Fee(s) Check #
Issuing Date Expiration Date
Local Planning Jurisdiction Rover File Name
0
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythatthis project is consistentwith the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office
Mailing Address:
1638 Mail Service Center
Raleigh, NC 27699-1638
Location:
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
Morehead City Headquarters
400 Commerce Ave
Morehead City, NC 28557
252-808-2808/ 1-8884RCOAST
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
Connell, Brad
From: Chuck Gilgo [cgilgo@traderconstruction.com]
Sent: Thursday, January 05, 2012 9:17 AM
To: Connell, Brad
Cc: Beverly Engel; Steven Engel
Subject: RE: see attachments
Attachments: 20120105075958404.pdf
Good morning Brad,
We were hoping that we could schedule a site visit / inspection for:
Steven & Beverly Engel at 3504 Camelot Drive, New Bern
Next week? ... Thursday Jan 12t7_ n
..located off Old Cherry Point Road near A-1 Tree Service.
Their property sustained shoreline stabilization damage during Hurricane Irene. They have contracted with Trader
Construction to repair and improve the shoreline stabilization due to the Hurricane.
Description of Proposed Work:
• Removal of 28 trees (including fallen trees at the beach) Some of these trees will have the stumps removed
and some will be ground down to be able to fill and mow over.
• Cut and fill the existing eroded slope, to construct a uniform graded and compacted slope, to accept Class 2
granite rip rap. 200 tons to elevation 12.0'
Miscellaneous filling, grading, and seeding to cover low areas of the yard of visible roots, stumps, rock
debris to produce a uniform graded landscaped area.
• Restore the neighbor's yard from heavy equipment ingress / egress.
We will remove the stairs down to the beach and leave the high point intact at your neighbor's natural slope (
Elevation 26.0). We will not encroach on the natural sand beach, in other words at a normal tide there will be a
clear area of beach about 10-15' wide in front of your property. A steep slope will begin at the high point of the
corner of your property. We are controlled by this point and the beach location. As we move westward along
your waterfront the top of your slope will move back dramatically from where it is dangerously eroded at this
time. It will transition to a 3:1 slope to and will be covered with granite rip rap to elevation 12.0'. From that
point, we will grade to a 4:1 slope or flatter as it transitions to existing contours( approx.. 60' back from the
beach). Elevation 18.0+
We will cut and shape a ramp of 4:1 slope down to the beach at the low point of the yard. We will seed the area
at elevation 8.0' and above, and haul clean sand to transition from elevation 8.0' to elevation 3.0'down to the
beach area.
Thank you Brad,
Chuck Gilgo
671-3530
From: Connell, Brad[mailto:brad.connell(s�ncdenr.govl
Sent: Monday, November 14, 2011 3:43 PM
To: Chuck Gilgo
Subject: see attachments
Importance: High
Brad Connell
NC Division of Coastal Management
Field Representative
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties.
CERTI IED MAI • RETU N ECEIPT IEQUE§TED
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONJWAIVER FORM
Name of Property Owner: _
�a
35 o t�mel o �1r1 Vv2, I� ��rt NC. f�5
Address of Property: (Lot or Street #, Street or Road, Ciry &County)
Applicant phone #: 07
5� ,. (p'j� Mailing Address: 3So`f �� �+ D rl �-
I hereby certify that I own property adjacent to the above referenced property.
The- individual
applying for this permit has described to me as shown on the attached drawing the development
they are proposing. _ description or drawingwith dimensions must be rovided with this letter.
to thus proposal. �� 1 have no objections to this proposal. I have objections
al
nt
if you have objections to what Is elpf of t his notice.you must . Contact information forotW the Division of tDCM offic se is
(DCM) in writing within 90 days
available at wwwxcccoastalmanemen oha meas o objection if you have been notified by Certified Mail.t,net1contac(-dcm him of by caging o
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, or lift must be set back a
minimum distance of 16 from my area of riparian access unless waived by me. (if you wish to
waive the setback, you must ini al the appropriate blank below.)
l do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Owner Information)
Signature
print or Type
Mailing Address
KI etnr- &erv� N (- 2��d
Citylstatelzip
_„�� �2- t�la- 2°I! (7
Telephone Number
1a.19,P-D11
Date
(Riparian Property Owner Information)
Print or Type Name
Ste, C C_41u S` e.'�
Mailing Address
Citylstatellip
Telephone Number
\ 2-,
Date
CERTIFIED MAIL • R TURN R CEIPT RE UESTED
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONIWAiVER FORM
Name of Property owner:
Address of Property: (Lot or street #, Street or Road, City & County)
Mailing Address: J 2 `
Phone
Applicant
adjacent to the above referenced property. The individual
l hereby certify
that I own property adj the development
applying for this permit has describoedto me awin as ith dim nsionsshown on the amust attached ided ilh this le el
p A desc t bon
they are proposing.
proposal. �_ I have objections to this Proposal.
1 have no objections to this
ro osed, you rnust notify the Division of coastal Management
if you have objections to what is being p P calling 1-$�r DC OAST. No
writing within 1tl days of recerPt of this notice, Contact information for DCM o�c� s
available
l !d ementnet(contact_do have
or by Certitled Mail.
ayailabie at www•nccaastalmang
_ __� .�,e �amP a5 no ob'echon if ou have been notified
by
WAIVER SECTIO be set
breakwater, boathouse, or lift must
you ball
a
I understand that a pier, dock, mooring pilings, access
minimum distance of 15' from my area of
appropriate a blank unless
waived by me. Y
must initial t pp
waive the setback, you �r-�---
I do wish to waive the 15, setback requirement.
1 do not wish to waive the 15' setback requirement.
(p erty Owner Informat
Signature
print or Type Name
Mailing Address
Gitylstatelzip
C.
�1 -W)o to
Telephone Number
II L3- 'La it
Date
(Riparian Property Owner information)
Signature
print or Type Name
I 1 5
Marling Address
Cit� to0p
Telephone Number
Date
.. Z9-It
WDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue James H. Gregson Dee Freeman
-Governor-----------------_ Director _ —-------- a Secretary
BUFFER AU THORIZAPON CERT"FICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of Water Quality (DWQ) regulations 15A NCAC 028.0259 & 0233. The Division of Coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project
proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical
alternatives" determination per those regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor
land clearing to a civil penalty of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters ridge or the coastal wetland line and extends 30 feet landward) shall be miniir:ized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re-
established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would
remove understory vegetation is allowed.,
• Pre -project site conditions: ia,W?� , T cFe S
6. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify tha
information is complete and accurate.
w (I _609e �
Agent or pplica t Pri ed Name Permit O icer's ignature
�C,
.gent or pp is t Signatur Issue loate
LAMA GENERAL PERMIT ##:
Washington Office . Morehead City Office
943 Washington Square Mall 400 Commerce Avenue 011e
Washington, NC 27889 Morehead City, NC 28557 I'�orthCarolina
Phone 252-946-6431 Phone 252-808-2808 �ll� An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper A7��rLL
Version 5, 09/2009