Loading...
HomeMy WebLinkAbout61097_DRESSLER, CAROLYN_20121018• ,rDCAMA / DREDGE & FILL r. GENERAL PERMIT New ❑Modification -- Complete Reissue El Partial Reissue As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Applicant Name_ Address City _ Phone # Authorized Agent Affected CW AEC(s): ❑OEA O PWS: ORW: yes / no ' State -- ZIP _ (-- )—-- ---- Fax #IF F... r,.. 7 EW ❑ PTA [I ES ❑ PTS -' HHF -- IH D UBA '-- N/A =FC: PNA yes / no Crit.Hab. yes / no I Type of Project/ Activity Pier (dock) length Platform(s) / Finger pier(s) Groin length number Bulkhead/ Riprap length a�:k avg distance offshore_ — 117 if max distance offshore__ Basin, channel cubic yards Boat ramp Boathouse/ Boatlift Beach Bu (dozing_ Other Q I t + Shoreline Length SAV: not sure yes Sandbags: not sure yes r-cc Moratorium: n/a yes ti no Photos: yes no Waiver Attached: yes ,no A building permit may be requires �7. Notes/ Special Conditions Agent or Applicant Printed Name y } Signature "Please read compliance statement on back of permit" Application Fee(s) Check # � �W'rra. Previous permit # Date previous permit issued Project Location: County Street Address/ State Road/ Lot #(s) Subdivision 61097 ❑ Rules attached. City ------ ZIP__ Phone # () River Basin Adj. Wtr. Body,_. _ (nat /man /unkn) Closest Maj. Wtr. Body (Scale: ) t' Permit Officers Suture Issuing Date Expiration Date Local Planning Jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) �- ., �F',,UIVITED TO SERV E. Serial Number Year, Month, Day Post Office U.S. Dollars anU Cents 19247420676 r 20.2-10-18 ama $600-22 HUNDRED DOLLARS & Wt* *** # # J Amount pay to Clerk 7 x Address t/� yy J From Plemo f`q m zoos umtea states Postal S—Ce. All Rights Reselod - .SEE REVERSE WARNING • NEGOTIABLE ONLY IN THE U.S. AND POSSESSIONS 1:00000800 21: 19 2t. 206 76u CDENR North! Carolina rDepartment o; Environment and Natural Resources Division of Coastal Managerneni Beverly Eaves PerdL;e Braxton C. Davis Dee Freeman Governor -----,----- Director --- - Secretarl BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner & the party (contractor) performing the construction &/or land clearing to a civil penalty by DWQ of up to $25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. 5. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. s. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through MarAh 30) after cpmpletion of the bulkhead. roject site co 7. Project Drawing: The drawing on the CAM<General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction corridors. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed condi ions and verify th information is complete and accurate. icant Painted Name CCAMA ! e� or ApplicInt Sig a re GENERAL PERMIT #: 6l(07 Permit Offiper'sSignature Issue Washington Office Morehead City Office Wilmington Office 943 Washington Square Mall 400 Commerce Avenue 127 Cardinal Drive Ext. Washington, NC 27889 Morehead City, NC 28557 Wilmington, NC 28405-3845 Phone 252-946-6481 Phone 252-808-2808 910-796-7215 Nne orthCarohna NaturallJ An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper I v9 ! ■Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space pzrmits. 1. Article Addressed to: 20`L-) 3)O(J-WW -Qs �OY►�,Y1fiu1, NC Z�s�7 � x ❑ Agent ❑ Addressee eived by �'i d Name) C. ate of Delivery D. Is delivery address different from item 1? ❑❑ YY If YES, enter delivery address below: t]i�No 3. S�e ' Type Q'Certified Mail ❑ Express Mail l ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number p ,2 � q (Transfer from service label) lJ l l ID (VP —I 1 J�� ` V c J21 J PS Form 3811, February 2004 Domestic Return Receipt 102595-02-M-1540 N UNITED,,�:TihT su i�P§Tl.L SEXWGF�t� T,x� fia ,s • Sender: Please print your name, address, and ZIP+4in this box • 'FO1t� UNT(Xtofs I LLC, islc,> c)�d fti�port-Rd, N z W \3 eYn , N C, 2k`0U0 ifIII IitI Ill If!11111111il III IIll IfI)IIt!III III IIIIII itIIIIillt North Carolina Department of Environment and Natural Resources Division of Coastal Management Ted Tyndall, Director Beverly Perdue Governor William G Ross Jr. Secretary Date: September 10, 2012 Applicant Name: Carolyn Dressler cU) Address: 1148 Orchard Creek Rd Oriental, NC 28571 I certify that I have authorized (agent):Foley Contractors LLC. to act on my behalf, for the purpose of applying for and obtaining all CAMA permit necessary to install or construct (activity) Dock/Bulkhead at (location) Same This certification is valid thru (date) (I) year Fold Contractors LLC 1810 Old Airport Rd New Bern, NC 28560 252-636-2515 Oct 121210;50a FoleyContractcrs 2526363127 P. Pambea County Building Inspections PO Box 776 Bayboro, NC 28515 (252)-745-3861 Adiacent Riparian Property Owner Statement Epn# ' I hereby certify that I own property adjacent ( S Name of landowner proposing development �J 0111 Hi U Of o1 in�near Lot# of Subdivision, ifapplication Tax Parce]# (A— �p :1 — � off State Road Complete Description of how locate this property This proposed project, z Q U d the location has been described to me as shown in the drawing below and I have no objection to the proposal. vv\S For a Pier check of the following: I wish to waive the 151t minimum setback from my riparian access. i do not wish to waive tie 1 S'ft minimum setback requirem+ew. Draw the proposed structure in the space provide below. moist the size of the strucnue and Measured distwce from the adjacent property fines, other structure m the property, and The eu_ 1 CEO 1- � �t�\ r it �C >.,1� 1Rer this fc m is comnlete by iandoww smnosmr the micci. a copy is Riven to the adiacent lancawncr Cor their eorc-?ent and signatures. The furors are then rorurned along wilb a building plan and otht, applicabte required information. to the Buildtng la spwicos (xGce for building permit appliczuton pmcesstrsg. Signatare Date Foley Contractors, LLC 212-C Kale Rd New Bern, NC 2M0 252-636-2515 �2-i�3t9 3tZ."1 �ax l'd LL99ZVZZ9Z 40 ueoilbuysiuieS Ill/ e80.01 ZL ZL 100 4 OQAt In ­ogCI Nov 0712 02:22p Foley Contractors 2526363127 II ,,�� }} `` aap.1 11 u\� Cl� `s � Dr tie-A4a 1 \)c)u add- 1 ec� ,�rzc�o�