Loading...
HomeMy WebLinkAbout58837_DOVE, RICHARD J_20110908❑LAMA / ❑ DREDGE & FILL r\ GENERAL PERMIT ONew ❑Modification ❑Complete Reissue El Partial Reissue As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC Previous permit # Date previous permit issued E Rules attached. Applicant Name Bti C. d 5 , Uoyc Project Location: County Address Street Address/ State Road/ Lot #(s) City ¢ State ZIP a/ SS(li o ! ' J G < <� ►`�. c� , Phone # (1SZ) 441— ;46:Z i Fax # (`) Subdivision o a 0% Authorized Agent City h e ,i t j Q c zip �U ❑ CW ❑ EW ❑PTA ❑ ES ❑ PTS Phone # (75Z) G 3 ii �� River Basin l n. j �j T Q Affected s ElOEA AEC: C HHF ❑ IH ElUBA ❑ N/A Ad'. Wtr. Body i y tV .tC 91 ' t (na�t,_/man /unkn) El PWS: [I FC: � Nt Q If. ORW: yes / no PNA yes /;no, Crit.Hab. yes / no Closest Maj. Wtr. Body ■■:■�n� ■■�■■■w■��■■■■�■■■n■■■a1■[�■■ ' ■■�1i�JY�ly■i�3�Lli�laL'�iWl�■il�i[I71T�l�rlSl■'n�■■ ■■■■u'11Ei?�'9..L�IL�IClf<fiiyil■��J■■(tl�■i!lri'��Ia1C�il�r !I■ ■■■■':1i:1�"iT�li►�[I�■!'�:ilr■s;�iL��:►'�i■[iR+ii�■'?i■■■ ■■■■I r■■1�\■,I���■■�\1�■■■�a�ii�lil�ll�'?�■■ MEN RiMmorJOEMNE ■■■■■■■■■■■®■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■ ■�■� ■■■■■■■■■■�n■■■■■w■■■■■■■■■n■ram■■■■■ • - ■■►.►■11.►��i�(�'��l■C+�Ifi�:II+�7.7Ciial:�iSi�7Nl�tl.. �I,'dl:�■■■■ ■ NEW iE �� !'J■1�7�;Ir !!..'����.Tt�l. �l►■■I�iil�t7, tii►,■■� ■�iii■iiii®■oi�aii■i■■iiiii�iii ■■■■ ■■■■■■■■■■■■■■■■■■■ ■■■ r■ ME Agent oi`,ApLhic *Printed Name ' Signature i Please read compliance statement on back of permit Application Feels) Check # Permit Officer' ,Sig"nature >, R1Z Issuing Ezpira ion Date Local Planningjurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythatthis project is consistentwith the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 Rja NC®ENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue James H. Gregson Dee Freeman Governor _ Director_ _ Secretes BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (LAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Ovewwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. 5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re- established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would remove understory vegetation is allowed. Pre -project site conditions: La v.l n s. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property :.idicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction corridors. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all information is complete and accurate. 1-c% 0,R0 Z_- LL0'1 a,--- Aggxd-or-Applicant Printed Name Permit Offic is Pignature an a Issue Da CAMA GENERAL PERMIT #: 3% Washington Office Morehead City Office 943 Washington Square Mail 400 Commerce Avenue �lle Washington, NC 27889 Morehead City, NC 28557 011 thCi o n� Phone 252-946-6481 Phone 252-808-2808 Nor��������� An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Version 5, 09/2009 AG"�A� NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue James H. Gregson Dee Freeman Governor Director Secretary BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. s. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify that all information provided is complete and accurate. C)v Agent o lic Printed Name Permit d fficer's Signature .11 1 nt ignature Issue D to CAMA GENERAL PERMIT #: 9 S 911 G Washington Office Morehead City Office 943 Washington Square Mall 400 Commerce Avenue Washington, NC 27889 Morehead City, NC 28557 Phone 252-946-648I Phone 252-808-2808 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper Version 5, 09/2009 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to Richard J. Dove is (Name of Property Owner) property located at 427 Boros Road, New Bern, NC (Lot, Block, Road, etc.) on south shore of the Neuse Rived in Craven County, , N.C. (Waterbody) (Town and/or County) Applicant's phone #• 252 447 5821 Mailing Address: 427 Boros Rd New Bern,NC 28560 He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT: (To be filled in by property owner proposing development) 1) Restore the shoreline bulkhead as existed before Hurricane Irene using rip rap (either granite, moral or broken concrete, or any combination thereof) Add fill dirt or clay under rip rap as necessary 2) Restore the dock and deck as existed prior to damage done by Hurricane Irene (Information for Property Owner Applying for Permit) 477 Born-, Rd Mailing Address New Bern, NC 28560 City/State/Zip 252 447 5821 Telephone Number 9/4/2011 Signature Date (Riparian Property Owner Information) c Ronald Davia 252 447 2147 ignature Print or Type Name Telephone Number Date ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to Richard J. Dove is (Name of Property Owner) property located at 427 Boros Road, New Bern, NC , (Lot, Block, Road, etc.) on south shore of the Neuse Rived in Craven County, , N.C. (Waterbody) (Town and/or County) Applicant's phone #: 252 447 5821 Mailing Address: 427 Boros Rd New Bern,NC 28560 He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT: (To be filled in by property owner proposing development) 1) Restore the shoreline bulkhead as existed before Hurricane Irene using rip rap (either granite, moral or broken concrete, or any combination thereof) 2) Restore the dock and deck as existed prior to damage done by Hurricane Irene 3) Add additional rip rap at the junction of where our properties come together so as to protect against water intrusion and erosion from water running along __ my wooden bulkhead towards Dove's_proper........................................... (Information for Property Owner Applying for Permit) 4?7 Born,, Rd Mailing Address New Bern, NC 28560 City/State/Zip 252 447 5821 Tele umber Signature Date (Riparian Property Owner Information) Si ture Jim Bretzius Print or Type Name a1?056 292-5" L�J Telephone Number APT Date 11 2io A a lor m r 6 . 44 ow. OmW