HomeMy WebLinkAbout58837_DOVE, RICHARD J_20110908❑LAMA / ❑ DREDGE & FILL r\
GENERAL PERMIT
ONew ❑Modification ❑Complete Reissue El Partial Reissue
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC
Previous permit #
Date previous permit issued
E Rules attached.
Applicant Name
Bti C. d 5 , Uoyc
Project Location: County
Address
Street Address/ State Road/ Lot #(s)
City
¢ State ZIP a/ SS(li o
! ' J G < <� ►`�. c� ,
Phone # (1SZ) 441—
;46:Z i Fax # (`)
Subdivision o a 0%
Authorized Agent
City h e ,i t j Q c zip
�U
❑ CW
❑ EW ❑PTA ❑ ES ❑ PTS
Phone # (75Z) G 3 ii �� River Basin
l
n. j �j T Q
Affected
s ElOEA
AEC:
C HHF ❑ IH ElUBA ❑ N/A
Ad'. Wtr. Body i y tV .tC 91 ' t
(na�t,_/man /unkn)
El PWS:
[I FC:
�
Nt Q If.
ORW: yes / no
PNA yes /;no, Crit.Hab. yes / no
Closest Maj. Wtr. Body
■■:■�n�
■■�■■■w■��■■■■�■■■n■■■a1■[�■■
'
■■�1i�JY�ly■i�3�Lli�laL'�iWl�■il�i[I71T�l�rlSl■'n�■■
■■■■u'11Ei?�'9..L�IL�IClf<fiiyil■��J■■(tl�■i!lri'��Ia1C�il�r
!I■
■■■■':1i:1�"iT�li►�[I�■!'�:ilr■s;�iL��:►'�i■[iR+ii�■'?i■■■
■■■■I
r■■1�\■,I���■■�\1�■■■�a�ii�lil�ll�'?�■■
MEN
RiMmorJOEMNE
■■■■■■■■■■■®■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■
■�■�
■■■■■■■■■■�n■■■■■w■■■■■■■■■n■ram■■■■■
• -
■■►.►■11.►��i�(�'��l■C+�Ifi�:II+�7.7Ciial:�iSi�7Nl�tl..
�I,'dl:�■■■■
■ NEW iE �� !'J■1�7�;Ir !!..'����.Tt�l. �l►■■I�iil�t7, tii►,■■�
■�iii■iiii®■oi�aii■i■■iiiii�iii
■■■■
■■■■■■■■■■■■■■■■■■■ ■■■ r■
ME
Agent oi`,ApLhic *Printed Name '
Signature i Please read compliance statement on back of permit
Application Feels) Check #
Permit Officer' ,Sig"nature
>, R1Z
Issuing Ezpira ion Date
Local Planningjurisdiction Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythatthis project is consistentwith the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office
Mailing Address:
1638 Mail Service Center
Raleigh, NC 27699-1638
Location:
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
Morehead City Headquarters
400 Commerce Ave
Morehead City, NC 28557
252-808-2808/ 1-888-4RCOAST
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
Rja
NC®ENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue James H. Gregson Dee Freeman
Governor _ Director_ _ Secretes
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project
proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical
alternatives" determination per those regulations.
Those activities covered by your Coastal Area Management Act (LAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor
land clearing to a civil penalty of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Ovewwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re-
established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would
remove understory vegetation is allowed.
Pre -project site conditions: La v.l n
s. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
:.idicating the location of the shoreline stabilization structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and accurate.
1-c% 0,R0 Z_- LL0'1
a,---
Aggxd-or-Applicant Printed Name Permit Offic is Pignature
an a Issue Da
CAMA GENERAL PERMIT #: 3%
Washington Office Morehead City Office
943 Washington Square Mail 400 Commerce Avenue �lle
Washington, NC 27889 Morehead City, NC 28557 011 thCi o n�
Phone 252-946-6481 Phone 252-808-2808 Nor���������
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Version 5, 09/2009
AG"�A�
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue James H. Gregson Dee Freeman
Governor Director Secretary
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico &
Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259.
The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of
Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies
with the aforementioned regulations, and made a "no practical alternatives" determination per those
regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer
Authorization as long as the project is constructed in a manner that continues to meet all of the conditions
listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party
(contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per
violation.
i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM.
The alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of
pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules
to the maximum extent practicable.
s. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way.
This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the conditions listed above and
verify that all information provided is complete and accurate.
C)v
Agent o lic Printed Name Permit d fficer's Signature
.11 1
nt ignature Issue D to
CAMA GENERAL PERMIT #: 9 S 911 G
Washington Office Morehead City Office
943 Washington Square Mall 400 Commerce Avenue
Washington, NC 27889 Morehead City, NC 28557
Phone 252-946-648I Phone 252-808-2808
An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper
Version 5, 09/2009
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to
Richard J. Dove is
(Name of Property Owner)
property located at 427 Boros Road, New Bern, NC
(Lot, Block, Road, etc.)
on south shore of the Neuse Rived in Craven County, , N.C.
(Waterbody) (Town and/or County)
Applicant's phone #•
252 447 5821
Mailing Address: 427 Boros Rd
New Bern,NC 28560
He has described to me, as shown below, the development he is proposing at that location, and, I
have no objections to his proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT:
(To be filled in by property owner proposing development)
1) Restore the shoreline bulkhead as existed before Hurricane Irene
using rip rap (either granite, moral or broken concrete, or any combination
thereof) Add fill dirt or clay under rip rap as necessary
2) Restore the dock and deck as existed prior to damage done by Hurricane
Irene
(Information for Property Owner Applying
for Permit)
477 Born-, Rd
Mailing Address
New Bern, NC 28560
City/State/Zip
252 447 5821
Telephone Number
9/4/2011
Signature Date
(Riparian Property Owner Information)
c
Ronald Davia
252 447 2147
ignature
Print or Type Name
Telephone Number
Date
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to
Richard J. Dove is
(Name of Property Owner)
property located at 427 Boros Road, New Bern, NC ,
(Lot, Block, Road, etc.)
on south shore of the Neuse Rived in Craven County, , N.C.
(Waterbody) (Town and/or County)
Applicant's phone #: 252 447 5821 Mailing Address: 427 Boros Rd
New Bern,NC 28560
He has described to me, as shown below, the development he is proposing at that location, and, I
have no objections to his proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT:
(To be filled in by property owner proposing development)
1) Restore the shoreline bulkhead as existed before Hurricane Irene
using rip rap (either granite, moral or broken concrete, or any combination
thereof)
2) Restore the dock and deck as existed prior to damage done by Hurricane
Irene
3) Add additional rip rap at the junction of where our properties come together
so as to protect against water intrusion and erosion from water running along
__ my wooden bulkhead towards Dove's_proper...........................................
(Information for Property Owner Applying
for Permit)
4?7 Born,, Rd
Mailing Address
New Bern, NC 28560
City/State/Zip
252 447 5821
Tele umber
Signature Date
(Riparian Property Owner Information)
Si ture
Jim Bretzius
Print or Type Name
a1?056
292-5" L�J
Telephone Number
APT
Date
11
2io A
a
lor
m
r
6
. 44 ow.
OmW