HomeMy WebLinkAbout57096_BENTO, WILLIAM_20110321/S,6
❑ CAMA / ❑ DREDGE & FILL
GENERAL PERMIT
New ❑Modification ❑Complete Reissue []Partial Reissue
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
Applicant Name—
Address —
City
Phone # ( )`
Authorized Agent
Affected ❑ cW
AEC(s): ❑ OEA
❑ PWS:
ORW: yes / no
State ZIP
Fax # (__)
❑ EW ❑ PTA ❑ ES ❑ PTS
❑ HHF ❑ IH ❑ UBA ❑ N/A
❑ FC:
PNA yes / no Crit.Hab. yes / no
Previous permit #
Date previous permit issued
Ej Rules attached.
Project Location: County
Street Address/ State Road/ Lot #(s)
Subdivision
City ZIP
Phone # O River Basin
Adj. Wtr. Body (nat /man, /unkn)
Closest Maj. Wtr. Body
NINE
::■■ :■:! ::®:::::::::::::::�:
■i®�i�■■!■■iii■■■■i■■ii■■i■■■■■■■iii■
:::::�::N:�l:�■:■:':!■:■:::::
■■.■■■.�■
.............
IMMMMMMMMMMN=I
1!■!■!!!0
MEMOMM
:l
::NE::::::M:z�0
MM
NOME
■!■■■■■■■■■■ilEi■■■■■■!■■■!■■■■■■■■■■.■■
IMMOMMEMEMEMM
BEESON
:::M:A
:::■::l:M:
■■■■■■■r■■■■■fl■■■■■■■■■■N/�■■■■■■■�ii
■MEN
■■■■■■■■■■■■■■i■■■■■■■■■■■■■■■■■■■■■■fGr',,!
■■■■■■■■■■■d�0`i.!!■■■■■■■■■■■■■■■■■■■■■■
:::::::::■:ommmomomm
■■■■■■■■■■ii!■■■■■■■■■■■■■■■■■■■■t�l.
::::IMMIMM 0
or Aoolicant Printed Name
PermitOfficer's Signature
Signature ** Please read compliance statement on back of permit ** Issuing Date
Application Fee(s)
Check # Local Planningjurisdiction
Expiration Date
Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar- Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office
Morehead City Headquarters
Mailing Address:
400 Commerce Ave
1638 Mail Service Center
Morehead City, NC 28557
Raleigh, NC 27699-1638
252-808-2808/ I-888-4RCOAST
Location:
Fax: 252-247-3330
2728 Capital Blvd.
(Serves: Carteret, Craven, Onslow -above
Raleigh, NC 27604
New River Inlet- and Pamlico Counties)
919-733-2293
Fax: 919-733-1495
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
NC Division of Coastal Mgt. Habitat Impact Computer Sheet
Applicant: William Bento
Date: March 21, 2011
General Permit #: 57096C
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount
SB
Dredge ❑ Fill ® Both ❑ Other ❑
2,530
506
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised:02/03110
CERTIFIED MAIL • RETURN RECEIPT REgUESTED
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
Name of Property Owner. w; > 1 Jam Bento
Address of Property: nQ NPw Rc�rn_, Nr 28562
(Lot or Street #, Street or Road, City & County)
Applicant phone#: (252) 670-0825 Mailing Address: 1 1 1 Portside Lane
New Bern, NC 28560
I hereby certify that I own property adjacent to the above referenced property. The individual
applying for this permit has described to me as shown on the attached drawing the development
they are proposing. A description or drawing with dimensions must be provided with this letter.
I have no objections to this proposal. I have objections to this proposal.
If you have objections to what is being proposed, you must notify the Division of Coastal Management
(DCM) in writing within 10 days of receipt of this notice. Contact information for DCM offices is
available at www.nccoastalmangement.neticontact_dcm.htm or by calling 1-888-4RCOAST No
response is considered the same as no objection if you have been notified by Certified Mail.
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, or lift must be set back a
minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to
waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Owner Information)
Signature
William Bento
Print or Type Name
111 Portside Lane
Mailing Address
New Bern, NC 28562
City/StatelZip
(252) 60-0825
Telephone Number
March 11, 2011
Date
rian Property O WT
Information)
Print or Type Name
�.� L4L
Mbiling Address !!
Chi N,c-R MiSSUU(�l
City/State/Zip
NI) 732-673�
Telephone Number
Date
jog PonMDE 1-N-
,
o
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
�� DIVISION OF COASTAL MANAGEMENT
A6tACENT RIPARIAN PROPERTY OWNER NOTIFICATIONMAIVER FORM
Name of Property Owner: w; 1 1 i am RPnt-n
Address of Property: 1 1-1—gE,rt�i e T.apip New Berns NC 28562
(Lot or Street #, Street or Road, City & County)
Applicant phone#: ( 252 ) 670-0825
Mailing Address:
111 Portside Lane
New Bern, NC 28560
I hereby certify that I own property adjacent to the above referenced property. The individual
applying for this permit has described to me as shown on the attached drawing the development
they are proposing. A description or drawing, with dimensions, must be provided with this letter.
I have no objections to this proposal. I have objections to this proposal.
If you have objections to what is being proposed, you must notify the Division of Coastal Management
(DCM) in writing within 10 days of receipt of this notice. Contact information for DCM offices is
available at www.nccoastalmangement.neUcontact-dcm.htm or by calling 1-888-4RCOAST. No
response is considered the same as no objection if you have been notified by Certified Mail.
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, or lift must be set back a
minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to
waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Owner Information)
Signature
William Bento
Print or Type Name
111 Portside Lane
Mailing Address
New Bern, NC 28562
City/State/Zip
(252) 6U-0825
Telephone Number
March 11, 2011
VOTIM,
(Riparian Property Owner Information)
/lut Cw
Si tre G
�)'Jc"E'TcTZa
;7
Pri t or Type Name
io a W
Mailing Ad ress
L;�u-) &L, z
City/State/Zip 0dZ 1)10,61b-g-
6'4s') (a3pj 3Z,
Telephone Number
3 -11-11
Date
'# 113 lbwr6jar 1-11
�M2W — 3002
WILLIAM BENTO 66-19/530 NC
CAROL BENTO Ml� f�C fl r a l 702
111 PORTSIDE LN. NEW BERN, NC 28562-8818 Date
$too.00
Pav
to the order of DollarsDRED
Bankof America'�I n
ACH R(T 053000196
Menlo
I:D53000L961: 00D6070 L6;t.0 03002
:r
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue James H. Gregson Dee Freeman
Governor Director Secretary
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project
proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical
alternatives" determination per those regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor
land clearing to a civil penalty of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re-
established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would
remove understory vegetation is allowed. r r , , 1\ A A
• Pre -project site cond
m
s. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and accurate.
W I I I I Ll fo �im-�
Agent or('Aopli
Agent or/kpPtS,AM Signature
CAMA GENERAL PERMIT #: 0_0
Washington Office Morehead City Office
943 Washington Square Mall 400 Commerce Avenue
Washington, NC 27889 Morehead City, NC 28557
Phone 252-946-6481 Phone 252-808-2808
Permit ffice 's Signature
Issu Dat
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/l0% Post Consumer Paper
Version 5, 09/2009
ne
NorthCarolina
)Vatura!!y