HomeMy WebLinkAbout23583_CULPEPPER, LLOYD_19991105CAMA and DREDGE AND FILL
G E N E R A L 23583 -
PERM I T -
as authorized by the State of North Carolina
Department of Environment and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC
Applicant Name
Address
City
Project Location (County, State Road, Water Body, etc.)
Type of Project Activity
State
Phone Number
Zip
PROJECT DESCRIPTION
Pier (dock) Length
SKETCH
t « „ i
^
77FF
(SCALE:
,� _*r=•'
i
)
i,
,-V —
Groin Length
number
1
Bulkhead Length
max. distance offshore
r'
Basin, channel dimensions
cubic yards
i7
I
Boat ramp dimensions
Other
��
..
t
,2c
71
This permit is subject to compliance with this application, site drawing
and attached general and specific conditions. Any violation of these terms
may subject the permittee to a fine, imprisonment or civil action; and
I may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit of-
ficer when the project is inspected for compliance. The applicant certi-
fies by signing this permit that 1) this project is consistent with the local
i' land use plan and all local ordinances, and 2) a written statement has
been obtained from adjacent riparian landowners certifying that they
have no objections to the proposed work.
In issuing this permit the State of North Carolina certifies that this project
is consistent with the North Carolina Coastal Management Program.
applicant's signature
permit officer's signature
issuing date expiration date
_ attachments
AD.
application fee
I
Manly G. Smith NCDL 1034710 03-54 66-30/531 6867
Louise J Smith NCDI. 568171 290
124 Fort Benjamin Rd 252-223-4440
Newport, NC 28570 DATE �- •S' /___ .
e„o
4
_ VV - I )tJLIARS
I �+ lin41",
rinl signauurcc lin�rj, i,�ljY�j . 1 inl Cili • m li:ml. In�;u on bark. If not�pcwnl.ol cash.
iARSTrI A .A ,��;l S 290
jj WM
First -Citizens Bank & Trust Company
i/i Newport, N.C. 28570
FOR L1ol,-�`�-`�-�f�%k% ?, d �l'f p'�i � "r
1:0531003001:0029074L3780i1' 06867
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(FOR A PIER/MOORING PILINGSIBOATLIFT/BOATHOUSE)
I hereby certify that I own property adjacent o 's
(Na a Property O
property located at
(Lot, Block, Road, etc.)
on , in _ , N.C.
aterbody (Town and/or/County)
He has described to me, as shown below, the development he is proposing at that location,
and, I have no objections to his proposal. I understand that a pier/mooring
pilings/boatlift/boathouse must be set back a minimum distance of fifteen feet (15') from my area
of riparian access unless waived by me.
I do not wish to waive the setback requirement.
I dQ wish to waive that setback requirement.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT:
(To be fulled in by individual proposing development)
Signature
�141 X/
Print or Ty e Name
Telephone Number
� g
Date:
A ts M
400
i
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(FOR A PIER/MOORING PILINGS/BOATLIFT/BOATHOUSE)
I hereby certify that I own property adjacent to rL/6 s
(Name of �operty Owner)
property located at G ,
(Lot, Block, Road, etc.)
on I V�� �/ , in N.C.
( aterbody) (Town an o County
He has described to me, as shown below, the development he is proposing at that location,
and, I have no objections to his proposal. I understand that a pier/mooring
pilings/boatlift/boathouse must be set back a minimum distance of fifteen feet (15') from my area
of riparian access unless waived by me.
I do not wish to waive the setback requirement.
I dQ wish to waive that setback requirement.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT:
(To be filled in by individual proposing development)
Vol
Ft")'oitt? 12 LtOITOLo
Pnrit or Type Name
Telephone Number
Date: 5� - 16 q 2
EAIR - COASTAL MANAGEMENT T15A: 07H.1300
SECTION .1300 - GENERAL PERMIT TO MAINTAIN: REPAIR AND CONSTRUCT BOAT
RAMPS ALONG ESTUARINE SHORELINES AND INTO ESTUARINE AND PUBLIC TRUST
WATERS
.1301 PURPOSE
This permit will allow the construction of boat ramps of suitable materials along estuarine shorelines and into
estuarine and public trust waters A.ECs according to the authority provided in Subchapter 7J .1100 and according to the
following guidelines. This permit will not apply to the Ocean Hazard AEC.
HistoryNote: Authority G.S.113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984.
.1302 APPROVAL PROCEDURES
(a) The applicant must contact the Division of Coastal Management and complete an application form requesting
approval for development. The applicant shall provide information on site location, dimensions of the project area, and
his name and address.
(b) The applicant must provide:
(1) confirmation that a written statement has been obtained signed by the adjacent riparian property owners
indicating that they have no objections to the proposed work; or
(2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed
work. Such notice should instruct adjacent property owners to provide any comments on the proposed
development in writing for consideration by permitting officials to the Division of Coastal Management
within ten days of receipt of the notice, and, indicate that no response will be interpreted as no objection.
DCM staff will review all comments and determine, based on their relevance to the potential impacts of the
proposed project, if the proposed project can be approved by a General Permit. If DCM staff finds that the
comments are worthy of more in-depth review, the applicant will be notified that he must submit an
application for a major development permit.
(c) No work shall begin until an on -site meeting is held with the applicant and appropriate Division of Coastal
Management representative so that the proposed boat ramp alignment can be appropriately marked. Written
authorization to proceed with the proposed development will be issued during this visit Construction of the boat ramp
structure must begin within 90 days of this visit or the general authorization expires.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1,• 113A-124;
Eff. March 1, 1984;
Amended Eff. January 1, 1990.
.1303 PERMIT FEE
The applicant must pay a permit fee of fifty dollars ($50.00) by check or money order payable to the Department.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-119; 113A-124;
Eff. March 1, 1984;
Amended Eff. March 1, 1991.
.1304 GENERAL CONDITIONS
(a) Structures authorized by this permit shall be non-commercial boat ramps constructed of acceptable material and
conforming to the standards herein.
(b) Individuals shall allow authorized representatives of the Department of Environment and Natural Resources to
make periodic inspections at any time deemed necessary in order to be sure that the activity being performed under
authority of this general permit is in accordance with the terms and conditions prescribed herein.
(c) There shall be no unreasonable interference with navigation or public use of the waters during or after
construction.
(d) This permit will not be applicable to proposed construction where the Department has determined, based on an
initial review of the application, that notice and review pursuant to G.S. 113A-119 is necessary because there are
unresolved questions concerning the proposed activity's impact on adjoining properties or on water quality; air quality;
coastal wetlands; cultural or historic sites; wildlife; fisheries resources; or public trust rights.
(e) This permit does not eliminate the need to obtain any other required state, local, or federal authorization.
PO 'J.r; d_1l 1 fr CTR 4 CLnL rct�a: n's-n T coo
ENR - COASTAL MANAGEMENT T1 A: 07H .1300
(f) Development carried out under this permit must be consistent with all local requirements, AEC rules, and local
land use plans current at the time of authorization.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. May 1, 1990;
RR Objection due to ambiguity Eff. May 19, 1994;
Amended Eff. August 1, 1998; July 1, 1994.
.1305 SPECIFIC CONDITIONS
(a) Boat ramps shall be no wider than 15 feet and must not extend farther than 20 feet below the mean high water
level contour in tidal areas, or the normal water level contour in nontidal areas.
(b) Excavation and ground disturbing activities above and below the mean high water level or normal water level will
be limited to that absolutely necessary to establish adequate ramp slope and provide a ramp no greater in size than
specified by this general permit-
(c) PIacement of fill materials below the mean high water level, or normal water level contour, will be limited to the
ramp structure itself. Boat ramps may be constructed of concrete, wood, steel, clean riprap, marl, or any other
acceptable materials as approved by department personnel. No coastal wetland vegetation shall be excavated or filled
at any time during construction and subsequent use of the proposed ramp.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984.
NORTH CAROLINA ADMINISTR4TIVE CODE 08121198 Page 2