HomeMy WebLinkAbout41805_STANICK, CARL & AUDREY_20050714�CAMA /-i-DREDGE & FILL } _ 05
6 GENERAL PERMIT Previous permit #
'i:
New OModification f_7Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources �.j.
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC f f ILU
'o
Jd}Rules attached.
Applicant Name �� j Y� -Y `j ri% %C R1 Project Location: County D-P ixC- :
Address k e C t� ri w hY R 1) Street Address/ State Road/ Lot #(s)
City -1��SG VVG�G!/ State.Lrzip Ob % �0) �� I4t-' bo nrlY)' S
Phone # ( 1 � 9'3�a5ax # ( ) Subdivision
Authorized Agent VIA! CAAL-L City gK VA ZIP
Affected ❑ CW L•7;EW *PTA 4ES ElPTS Phone # ( ) River Basin
ElOEA `� HHF ❑ IH ElUBA ❑ N/A
AEC(s): Adj. Wtr. Body Ari _ 911/� Gao /man /unkn)
❑ PWS: ❑FC:
ORW: yes / no, PNA yes / �+� Crit. Hab. yes / io Closest Maj. Wtr. Body '910UND
Type of Project/ Activity r r �, ��, F V l Ads= 2 % r) R �- -) L } � nl I 1 nut
^ cif! I" 1r - ' 1 ` 1- 19
(Scale:
Pier (dock) lengthy LDS i! It �► �t•c jt' E1f`- #<. p't7 h`
Platforms)
Finger pier(s)
Groin length
number
Bulkhea length
Avg distance offshore
max distance offshore d
Basin, channel
cubic yards_
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
Other
N w L
A
?'W� 1
Ftiy Y t ��Ll� rI i
1
r_
Shoreline LengthS.
{,.--
..• (1 y j
SAM not sure yes �
-
--.. -
Sandbags: not sure yesi��
r
Moratorium: yes no
4-'
Photos: ,Oes> no
Waiver Attached: yes
A building permit may be required by:
>Q Y - Cf, l r'1}:/ I Y
Notes/ Special Conditions
L. T ; so mL
Agent or Applicant Printed Name
Signature Please -tea compliance sta'temenionb ck of permit
i, 0 , `__ 1_v
Application Fee(s) Check #
Permit
-,�
See note on back regarding River Basin rules.
Issuing Dite ' Expiration Date
Local Planning Jurisdiction Rover File Name—
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythatthis project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules I_ Other:
L _J Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules.
Division of Coastal Management Offices
Central Office Elizabeth City District
Mailing Address: 1367 U.S. 17 South
1638 Mail Service Center Elizabeth City, NC 27909
Raleigh, NC 27699-1638 252-264-3901
Location:
Parker -Lincoln Building
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293 / 1-888ARCOAST
Fax: 919-733-1495
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Morehead City District
151-B Hwy. 24
Hestron Plaza II
Morehead City, NC 28557
202-808-2808
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-395-3900
Fax: 910-350-2004
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
www.nccoastalmanagement.net
Revised 10/05/01
a
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary
July 18, 2005
JUL 2 0 N05
Mr. Thomas Marvin
1 Tempsford Lane � . n
Williamsburg, VA 23188 Morehead�r�;�
Re: Objection to the Issuance of CAMA General Permit No. 41850-A
Development Project, Location, Dare County
Dear Mr.Marvin:
This letter is in response to your objection as an adjacent riparian property owner to a permit
request from Lyn Small, an agent for Carl and Audrey Stanick for the installation of bulkhead
and riprap at 101 Rhodoms Drive, Colington Harbor, Dare County. John Cece of the Division of
Coastal Management staff was recently on site to evaluate the permit applicant's request.
The permit applicants have requested a permit to replace an existing concrete bulkhead with 55
linear feet of vinyl bulkhead and realign existing riprap waterward of the new bulkhead. Under
the Coastal Area Management Act (CAMA), the Coastal Resources Commission (CRC) has
established Rules for General Permits for this type of development that are found in 15A NCAC
07H .1100.
You have notified the Division of Coastal Management of your objections to this proposed
development by fax. Your objections to this proposed development related to the placement of
the riprap waterward of the proposed bulkhead. John Cece has reviewed your objections, along
with all aspects of this development proposal for consistency with the aforementioned Rules,
which describe the CRC's standards and guidelines for this type of development. Our review of
the proposed development has found it to be consistent with these Rules.
Section I I05(b)(2) of 15A NCAC 07H states, "Where there is an existing bulkhead structure,
riprap shall' be allowed to extend a maximum of 10 feet offshore. This location standard shall
take into consideration the height of the area to be protected (i.e., bulkhead height, water depth)
and the alignment shall allow for a slope no flatter than 2 feet horizontal per 1 foot vertical and
no steeper than 1 '/2 fee horizontal per 1 foot vertical."
Mr. Cece has contacted Lyn Small, provided him a copy of 15A NCAC 07H.100, and informed
him that the proposed riprap must not be placed beyond the Stanick's riparian property lines and
must not exceed the distance and slopes listed in 15A NCAC 07H.1105(b)(2).
1367 U.S. 17 South, Elizabeth City, North Carolina 27909
Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www,nccoastaimanagement.net
An Equal Opportunity 1 Affirmative Action Employer — 30% Recycled by Fiber Weight
Mr. Thomas Marvin
July 18, 2005
Page 2
After having given careful consideration to your objections to this proposed development, we
have determined that it is consistent with the Rules of the CRC and the State's Coastal
Management Program, and that all pre -requisites have been satisfied. Therefore, the Division of
Coastal Management issued General Permit No. 41805A-A on July 14, 2005 (copy attached) for
the proposed development.
If you wish to appeal this permit decision, you must file a Third Party Hearing Request Form
with the Director of the Division of Coastal Management within 20 days of the permit issuance
date. If you choose to pursue an appeal, please contact this office so that we can provide you
with the appropriate forms and addresses.
If you have any further questions regarding this matter, please do not hesitate to contact John
Cece, or me, at this office.
Sincerely,
ed Samps
District Manager
Northeast District
TS/yc
cc: John Cece, Field Representative, Division of Coastal Management, Elizabeth City, NC
L--,Marles S. Jones, Director, Division of Coastal Management, Morehead City, NC
Lyn Small, Kitty Hawk, NC
EAMA / UREDGE & FILL
% .. 0
ENERAL PERMIT
Previous permit #
New OModification ❑Complete Reissue ❑Partial Reissue
•As
Date previous permit issued
authorized by the State of North Carolina, Department of Environment and Natural Resources
Commission 15A NCAC
4 A iD
-7
and the Coastal Resources in an area of environmental concern pursuant to
i d ed
ules attached.
ss^^
t_ Applicant Name AAL AN b I t� Project Location:
County m
Address ���� RO C 1KAWRY 1) Street Address/ State Road/ Lot #(s)
City A k &V0 -State ATZIP i
40o nS iAi W
Phone # (1 3R * '303.Tax # (_) Subdivision.
Authorized Agent City,
ZIP
❑ CW ,EW *PTA .ES O PTS Phone # ( )
River Basin
Affected 00EA D HHF ❑ IH ❑ UBA O N/A
AEC(s): Adi. Wtr. Body .� n man unkn
❑ PWS: ❑FC:
ORW: yes / re Closest yes / Crit. Hab. yes / Closest Mal. Wtr. Body �rL -��� saw„i
Type of Project/ Activity IVIRYL 8Ak_&VA0AN1 ~"�WJW s '
AIM�W&80P (Scale:I V I 2S)
Pier (dock) length
Platform(s)
tt ,
Finger piers)
t ,
a I I
Groin - length _ I I ._I _.__' I i _ I— ��� ��i:�,�-�—j—I---�---1----4- - �-
I
number
ulkhe ip length
avgdistance offshore I---i—
max distance offshore���I___.r .. I ' l I
Basin, channel
J --�--f-
- L
cubic yards t �!�'"fCo
_
Boat ramp -I.--_ -- 3� 1 v --!- _' +fr"i5'�1��} �9��9 77"-4--f—I
Boathouse/ Boatlift
Beach Bulldozing
Other --
t-
'.
Shoreline Length
SAM not sure yes ®' -- - _19 ' 1-•+ -- -
Sandbags: not sure yes ® r-Jy ._ �_'/ - - - (= --
- -�_ .
_ _ _. _
Moratorium: ( yes no -- ---+! i .--
Photos: no
1 I
Waiver Attached: yesj
A building permit may be required by: If) 'agi - CQ Im 1 5 ❑ See note on back regarding River Basin rules.
Notes/ Special Conditions
Agentlpr Appy6ant Printed Namo
Signat r *ii` - Sse read'co np) ante sk-:(tement oa4ck of permit �*
ADDlication Fee(s) Check #
Issuing Date . ° Expiration Date
Local Planning jurisdiction Rover File Name
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary
Y; July 18, 2005
JIG ,� 0 Z�05
Mr. Joseph Rhodes
909 Harbor View Drive MOreheaci City DCM
Kill Devil Hills, NC 27948
Re: Objection to the Issuance of CAMA General Permit No. 41850-A
Development Project, Location, Dare County
Dear Mr. Rhodes:
This letter is in response to your objection as an adjacent riparian property owner to a permit
request from Lyn Small, an agent for Carl and Audrey Stanick for the installation of bulkhead
and riprap at 101 Rhodoms Drive, Colington Harbor, Dare County. John Cece of the Division of
Coastal Management staff was recently on site to evaluate the permit applicant's request.
The permit applicants have requested a permit to replace an existing concrete bulkhead with 55
linear feet of vinyl bulkhead and realign existing riprap waterward of the new bulkhead. Under
the Coastal Area Management Act (CAMA), the Coastal Resources Commission (CRC) has
established Rules for General Permits for this type of development that are found in 15A NCAC
07H .1100.
You have notified the Division of Coastal Management of your objections to this proposed
development by fax. Your objections to this proposed development related to the placement of
the riprap waterward of the proposed bulkhead. John Cece has reviewed your objections, along
with all aspects of this development proposal for consistency with the aforementioned Rules,
which describe the CRC's standards and guidelines for this type of development. Our review of
the proposed development has found it to be consistent with these Rules.
Section 1105(b)(2) of 15A NCAC 07H states, "Where there is an existing bulkhead structure,
riprap shall be allowed to extend a maximum of 10 feet offshore. This location standard shall
take into consideration the height of the area to be protected (i.e., bulkhead height, water depth)
and the alignment shall allow for a slope no flatter than 2 feet horizontal per 1 foot vertical and
no steeper than 1 '/2 fee horizontal per 1 foot vertical."
Mr. Cece has contacted Lyn Small, provided him a copy of 15A NCAC 07H.1100, and informed
him that the proposed riprap must not be placed beyond the Stanick's riparian property lines and
must not exceed the distance and slopes listed in 15A NCAC 07H.1105(b)(2).
1367 U.S. 17 South, Elizabeth City, North Carolina 27909
Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net
An Equal Opportunity 1 Affirmative Action Employer— 30% Recycled by Fiber Weight
Mr. Joseph Rhodes
July 18, 2005
Page 2
After having given careful consideration to your objections to this proposed development, we
have determined that it is consistent with the Rules of the CRC and the State's Coastal
Management Program, and that all pre -requisites have been satisfied. Therefore, the Division of
Coastal Management issued General Permit No. 41805A-A on July 14, 2005 (copy attached) for
the proposed development.
If you wish to appeal this permit decision, you must file a Third Party Hearing Request Form
with the Director of the Division of Coastal Management within 20 days of the permit issuance
date. If you choose to pursue an appeal, please contact this office so that we can provide you
with the appropriate forms and addresses.
If you have any further questions regarding this matter, please do not hesitate to contact John
Cece, or me, at this office.
Sincerely,
eSam�p��
District Manager
Northeast District
TS/yc
cc: John Cece, Field Representative, Division of Coastal Management, Elizabeth City, NC
merles S. Jones, Director, Division of Coastal Management, Morehead City, NC
Lyn Small, Kitty Hawk, NC
/ DREDGE & FILL
eT;!.'05
Q&^MA
ENERAL PERMIT
Previous permit #
New ❑Modification ❑Complete Reissue ❑Partial Reissue
Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and
Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
r 1D
uies attached.
� ,� /
Applicant Name C A -A r�� ��i �'f � % 1CK
Project Location:
,�+
County f
Address 1 5"d !9' RQ C KRW JJ RP
Street Address/ State Road/ Lot #(s)
City State AJ 37 ZI
1+0Do))IS I)a I V!��
Phone # (� �¢ 3 ax # (_)
Subdivision C121jjA)O
j
Authorized Agent
City
s ZIP
[ICW EW #PTA 4ES ❑ PTS
Phone # ( )
River Basin
Affected [IO� ❑ HHF [IIH ❑ UBA ❑ N/A
AEC(s):
Adj. Wtr. Body
?r7 1_j� -4[I�Y, n /man /unkn)
❑ PWS: ❑FC:
ORW: yes / PNA yes / Crit. Hab. yes /
_
Closest Mal. Wtr. BodyL��/%
Type of Project/
Pier (dock) length
Platform(s) !�
Finger pier(s) I I
i. -
Groin length
number
ul� kh:.ip> length j !
--
avg distance offshore (
1 -j-
max distance offshore
Basin, channel i-
cubic yards!
j
L 113ULk- j
!1 FJ UGi
: A)C-Y'
Boat ramp
Boathouse/ Boatlift 9 i ��•+�"`'
o I
f - - - - -
Beach Bulldozing ! � _ i "�_�'�`,P6r� -I --
Other � � � � I- i '��, i P" �"-M+$W I
!
I I
Shoreline Length
53
SAV: not sure
yes
Sandbags: not sure
yes
I
- "-
4 4
Moratorium:
yes
no
Photos:
ae
no
i
Waiver Attached:
yes
l . .
A building permit may be required by:
aq F—
1
Notes/ Special Conditions
Agent,er Ap scant Printed Namf
Signat r p a reacn nuance s tement`oa k of permit **
4
ADDlication Fee(s) Check #
f
(Scale: )
I
Pic; -
E See note on back regarding River Basin rules.
PermitOSiatbre
,4in�05, 10 liq 105
Issuing DAte Exppira#ion Dake
Local Planningjurisdiction Rover File Name
AJ_ JUL o 8 2 05
NCDENR M
Rli
North Carolina Department of Environment and Natural ResMpimhead City DC
Division of Coastal Management
Michael F. Easley, Governor Charles S. Jo g liam G. Ross Jr., Secretary
Stuart and Sally Bethune
JUL 4 8 2005 July 5, 2005
1001 Wood Sage Dr.
Chapel Hill, NC 27516-4819 Morehead City DCM
Re: Objection to the Issuance of CAMA General Permit No. 41850-A
Pier development at 202 Osprey Drive, in Perquimans County
Dear Mr. and Mrs. Bethune:
This letter is in response to your objection as an adjacent riparian property owner to a permit
request from Randy and Leslie Jordan, for the construction of a pier structure at 202 Osprey
Drive in Albemarle Shores Subdivision, Perquimans County. Kimberly Hedrick, of the Division
of Coastal Management staff, was recently on site to evaluate the permit applicant's request.
The permit applicant has requested a permit to construct a pier 84-ft. long by 6-ft. wide with a
16-ft. long by 16-ft. wide platform at the waterward end of the pier, and a 14-ft. long by 12-ft.
wide boatlift west of the platform. The structure will extend 100' waterward of normal water
line (NWL). Under the Coastal Area Management Act (CAMA), the Coastal Resources
Commission (CRC) has established Rules for General Permits for this type of development that
are found in 15A NCAC 07H .1200.
You have notified the Division of Coastal Management of your objection to this proposed
development by checking off that you have an objection in your riparian property owner
notification/objection form and by letter. Kimberly Hedrick has reviewed your objection letter,
along with all aspects of this development proposal for consistency with the aforementioned
Rules, which describe the CRC's standards and guidelines for this type of development. Our
review of the proposed development has found it to be consistent with these Rules. The above
referenced Subchapter allows for structures, as described above, to be built over the waters of
Albemarle Sound, provided that the permit applicant meets and complies with all of the
application prerequisite conditions. This includes the construction of a pier with a boatlift and
platform, provided that they comply with the specific conditions of Subchapter 07H.1200. These
rules specifically allow for 400 square feet of platform and 400 square feet of boathouse/lift.
The proposed pier structure will have a 256 square ft. platform and 168 square ft. boatlift. This
rule also allows for piers to be constructed up to 200-ft. in length, so long as they do not interfere
with a known navigation channel or extend beyond one-fourth of the water body width. The
proposed pier structure will extend 100ft. in length into Albemarle Sound. The pier structure
will also exceed the 15-ft. setback requirement by being set back well over 15 feet from your
property line.
1367 U.S. 17 South, Elizabeth City, North Carolina 27909
Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net
An Equal Opportunity 1 Affirmative Action Employer — 30% Recycled by Fiber Weight
Mr. and Mrs. Bethune
July 5, 2005
Page 2
After having given careful consideration to your objection to this proposed development, we
have determined that it is consistent with the Rules of the CRC and the State's Coastal
Management Program, and that all pre -requisites have been satisfied. Therefore, the Division of
Coastal Management issued General Permit No. 41850-A on July 5, 2005 (copy attached) for the
proposed development.
The Jordan's have a lot that extends further south into Albemarle Sound than your lot. They
positioned their home more than 75 feet landward from normal waterline (NWL) at their
bulkhead. According to our rules, they potentially could have, under our minor permit process,
positioned their home up to 30 feet landward from the NWL.
If you wish to appeal this permit decision, you must file a Third Party Hearing Request Form
with the Director of the Division of Coastal Management within 20 days of the permit issuance
date. If you choose to pursue an appeal, please contact this office so that we can provide you
with the appropriate forms and addresses.
If you have any further questions regarding this matter, please do not hesitate to contact
Kimberly Hedrick, or me, at this office.
Sincerely,
4�d Sampson
District Manager
Northeast District
TS/yc
cc: Kimberly Hedrick, Division of Coastal Management, Elizabeth City, NC
Charles S. Jones, Director, Division of Coastal Management, Morehead City, NC
Randy and Leslie Jordan, 121 West Eden, Edenton, NC 27932