Loading...
HomeMy WebLinkAboutGeneral Permits (7965)O Applicant Name Address City CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203. Project Location (County, State Road, Water Body, etc.) Phone Number State Zip Type and Dimensions of Project c 6 � ' The proposed project to be located and constructed as described This certification of exemption from requiring a CAMA permit is above is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following expiration, quirement pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be necessary CAMA permit requirements does not alleviate the necessity of to continue this certification. your obtaining any other State, Federal, or Local authorization. SKETCH (SCALE: ) A, pig tv Y J—,7, 7 i Any person who proceeds with a development without the con- sent of a CAMA official under the mistaken assumption that the Applicant's signature i, t development is exempted, will be in violation of the CAMA if there is a subsequent determination that a permit was required for the ' development. CAMA Official's signature The applicant certifies by signing this exemption that (1) the ap- plicant has read and will abide by the conditions of this exemp- tion, and (2) a written statement has been obtained from adjacent landowners certifying that they have no objections to the proposed work. Issuing date ,a Expiration date Attachment: 15 North Carolina Administrative Code 7K .0203 Rules for Beach Bulldozing Beach bulldozing is a common method of erosion management that moves sand, usually to repair storm damage to an existing dune or to create a protective berm if the dune system has been completely washed away. Beach bulldozing may be permitted if you follow the general rules for development within an ocean hazard area of environmental concern, and BEACH BULLDOZZ TO RESTORE DUNES you follow these specific U4M-wc ! . '— - -- fc1 azrlye wrw'.' w tr4 • If you are bulldozing under a '� Old tb emi0t;*14f&V general permit, you must i pF'' confine sand movement to �� °''� OCEAN landward of the normal high ERODED DUNE j water line. Moving sand that is seaward of the low water line requires a CAMA major - - permit and a state Dredge and Fill permit. ■ In order to minimize adverse impacts ■ to nesting sea turtles, no work shall occur after October 18, 2003, without g-A0i{HUiZING TO RESTORE ONES prior approval from the I vn I iw P P P �xxs 1 trt �. srixz Bs�a rsoptr ku ' Division of Coastal ` Wddv*-am oil*I"kv Management, inOCN coordination with the N.C. � �. Wildlife Resources - Commission, U.S. Fish and OVEP-W -S4EC _.. Wildlife Service and U.S. MW rpm r Army Corps of Engineers. *a/�'d�-'V ■ The project should maintain a slope similar to normal conditions. The slope, or grade, of the project must not be so steep that it endangers the public or interferes with public use of the beach. ■ Bulldozer blades may not be lowered more than one foot as measured from the existing surface elevation. • Never bulldoze below mean low water. ■ General Permits limit the movement of sand from above mean high water only. ■ Beach bulldozing must not extend past the lateral boundary of your property, unless you have permission from the neighboring landowner. ■ This permit is to allow the creation of a protective berm or repair an eroded dune. It is not for the backfilling of undermined or damaged septic systems. Before covering a septic system, contact your local Health Department and Building Inspector to determine the extent of the damage, and whether a permit will be required to replace or relocate the system. ■ Remove debris, as it is uncovered. Do not bury or cover debris. • Make sure a copy of this authorization is on site during work.