HomeMy WebLinkAbout32931_KEHL, FRANK_20021121 (2)L] CAMA / D DREDGE & FILL 3 P 9'3 1
GENERAL PERMIT Previous permit # Al
FINew �'Moclification ElComplete Reissue ElPartial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
[-_] Rules attached.
Applicant Name
Address
City _ State
Phone # Fax #
Authorized Agent
Affected El Cw El EW 0 PTA El ES ' [S
AEC(s): A4
LJ OEA Ej HHF El 1H 0 UB11 fSW7�Z---
F-- PWS: F] FC: MOgE
ORW: yes / no PNA yes / no Crit. Hab. yes
Project Location: County_
Street Address/ State Road/ Lot #(s)
lb(ision , 1A, k
ZIP
ie# River Basin 'A( C
Wtr. Body-- (nat /man /unkn)
est Maj. Wtr. Body
Type of Project/ Activity
Pier (dock) length';'
Platform(s)
Finger pier(s)
(Scale:
1- T F
Groin length
number
Bulkhead/ %prap length
avg distance offshore
max distance offshore
Basin, channel
cubic yards
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
Other
FI-
I
—T—
-j4
—
Shoreline Length
T
SAM not sure yes no
Sandbags: not sure yes no
Moratorium: /V-a"yes no
Photos: yes no
Waiver Attached: yes no
A building permit may be required by: See note on back regarding River Basin rules.
Notes/ Special Conditions
Printed Nain Agent or cant nP7
Sixnai6re 'Pie dc&mpliance statement on backof permit"
Application Fee(s) Check #
T-
Issuing Date
Expiration Date
/—I
Local Planning Jurisdiction
Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythatthis project is consistentwith the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
�leuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules.
Division of Coastal Management Offices
Central Office
Mailing Address:
1638 Mail Service Center
Raleigh, NC 27699-1638
Location:
Parker -Lincoln Building
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293 / 1-888ARCOAST
Fax: 919-733-1495
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Morehead City District
151-B Hwy. 24
Hestron Plaza 11
Morehead City, NC 28557
202-808-2808
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-395-3900
Fax: 910-350-2004
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
www.nccoastalmanagement.net
Revised 10/05/01
Aer-WA
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary
November 27, 2002
Maritime Partners
ATTN: Mr. David Medford, Project Manager
P.O. Box 3147
New Bern, NC 28564
Dear Mr. Medford:
Attached is General Permit #C-32931 to replace 76' of existing bulkhead maximum 2'
waterward of existing alignment, move existing dock landward of bulkhead, and install 3 pilings
16.5' waterward of bulkhead in Craven County within the Fairfield Harbor Subdivision adjacent
to a manmade canal to Spring Creek at 6112 Schooner Court in New Bern, NC.
In order to validate this permit, please sign yellow and pink copies as indicated. Retain the
white copy for your files and return the signed yellow and pink copies to us in the enclosed,
self-addressed envelope.
We appreciate your early attention to this matter.
Sincerely,
0 �; �4 � �-- h�
Tracey L. Wheeler
Coastal Management Representative
TLW/srk
Enclosures
151-B Hwy. 24, Hestron Plaza Il, Morehead City, North Carolina 28557
Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastaimanagement.net
An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper