Loading...
HomeMy WebLinkAbout32931_KEHL, FRANK_20021121 (2)L] CAMA / D DREDGE & FILL 3 P 9'3 1 GENERAL PERMIT Previous permit # Al FINew �'Moclification ElComplete Reissue ElPartial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC [-_] Rules attached. Applicant Name Address City _ State Phone # Fax # Authorized Agent Affected El Cw El EW 0 PTA El ES ' [S AEC(s): A4 LJ OEA Ej HHF El 1H 0 UB11 fSW7�Z--- F-- PWS: F] FC: MOgE ORW: yes / no PNA yes / no Crit. Hab. yes Project Location: County_ Street Address/ State Road/ Lot #(s) lb(ision , 1A, k ZIP ie# River Basin 'A( C Wtr. Body-- (nat /man /unkn) est Maj. Wtr. Body Type of Project/ Activity Pier (dock) length';' Platform(s) Finger pier(s) (Scale: 1- T F Groin length number Bulkhead/ %prap length avg distance offshore max distance offshore Basin, channel cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other FI- I —T— -j4 — Shoreline Length T SAM not sure yes no Sandbags: not sure yes no Moratorium: /V-a"yes no Photos: yes no Waiver Attached: yes no A building permit may be required by: See note on back regarding River Basin rules. Notes/ Special Conditions Printed Nain Agent or cant nP7 Sixnai6re 'Pie dc&mpliance statement on backof permit" Application Fee(s) Check # T- Issuing Date Expiration Date /—I Local Planning Jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythatthis project is consistentwith the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: �leuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules. Division of Coastal Management Offices Central Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: Parker -Lincoln Building 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 / 1-888ARCOAST Fax: 919-733-1495 Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Morehead City District 151-B Hwy. 24 Hestron Plaza 11 Morehead City, NC 28557 202-808-2808 Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-395-3900 Fax: 910-350-2004 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) www.nccoastalmanagement.net Revised 10/05/01 Aer-WA NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary November 27, 2002 Maritime Partners ATTN: Mr. David Medford, Project Manager P.O. Box 3147 New Bern, NC 28564 Dear Mr. Medford: Attached is General Permit #C-32931 to replace 76' of existing bulkhead maximum 2' waterward of existing alignment, move existing dock landward of bulkhead, and install 3 pilings 16.5' waterward of bulkhead in Craven County within the Fairfield Harbor Subdivision adjacent to a manmade canal to Spring Creek at 6112 Schooner Court in New Bern, NC. In order to validate this permit, please sign yellow and pink copies as indicated. Retain the white copy for your files and return the signed yellow and pink copies to us in the enclosed, self-addressed envelope. We appreciate your early attention to this matter. Sincerely, 0 �; �4 � �-- h� Tracey L. Wheeler Coastal Management Representative TLW/srk Enclosures 151-B Hwy. 24, Hestron Plaza Il, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastaimanagement.net An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper